PMIS solution for Port of Baku - sustainableworldports.org€¦ · Operational Management of the...

Post on 06-Nov-2020

1 views 0 download

Transcript of PMIS solution for Port of Baku - sustainableworldports.org€¦ · Operational Management of the...

PMIS solution for Port of Baku

1

Baku, 04.10.2018

1

2

3

4

CONTENTS

PCS

PMIS in POB

Stimulation of RORO operations through PMIS

Q & A

PORT OF BAKU - PMIS

A single point interaction between businesses and authorities.

3

What is PCS?Why PCS?

• A PCS is an electronic platform that connects the multiple systems operated by a variety of organisations that make up a seaport community. It is shared in the sense that it is set up, organized and used by firms in the same sector – in this case, a port community.

• According to Valentin Carlan and Christa Sys, a PCS represents a tool through which port operations efficiency is expected to increase.

4

Benefits?

• Reduce paper (up to 90 %)

• Speed Up processes (up to 20 %)

• Increased data accuracy (up to 99.9%) for the exact cargo quantity and location within the terminal.

• Total control of freight flows

• Increased speed of freight turnover (up to 20%)

• Optimized use of the terminal's operation areas (up to 25 %)

• Improved service for freight owners by providing them with accurate cargo information including its current location.

• Decrease operating costs

• Increased speed and efficiency of data exchange between all freight processing parties at the terminal.

• Guaranteed real-time access to operational information.

5

The goals of PMIS in Port of Baku

6

Develop and Implement standards and protocols for processes and messages with the port community.

Systematically capture the relevant information from stakeholders. Avoiding the requirement to re-enter data limits errors and processing costs.

Centralize and standardize community information.

Provide transparency and real-time, or near real time, information to facilitate tracking and tracing of goods, and optimize transit times.

Building Blocks of PMIS

7

PROJECT SCOPEWhat does PMIS PoB contain?

8

Port Community System

✓ Vessel Registration,

✓ Call and berth request,

✓ Cargo Declaration,

✓ Passenger List,

✓ Crew member List and

✓ Dangerous good on board

Port Community System – Vessel operation

10

Pre Arrival

•Vessel Announcement

•Import and export Manifest

•Vessel clearance

•Graphical berthing planning

Arrival

•Tug boat and pilots

•Vessel operations processes

•Commission check

•Loading and discharging instructions

•Mobile device support

Departure

•Clearance for departure

•Operations performance review

Port Community System – Land side

11

Pre Arrival

• Truck and rail Announcement

• Receive data about incoming truck/rail before actual arrival

• Registering of truck and rail companies

• Port permits and the pass office

Arrival

• Billing of services and fees (Entrance, bridge, …

• Automatic License plate recognition

• Loading and discharging instructions

• Tracking of truck on yard

Departure

• Automatic loading list

• Operations performance review

RORO – Terminal Operating System

Operational Management of the RoRo Rail gate

Operational Management of the RoRo Vessel gate

Operational Management of the RoRo Road gate

Operational Management of the RoRo Yard

RORO – Terminal Operating System

Work-order Management

Module

ITU Identificationand planning

Mobile device unit module

ITU Handling Module

Gate Management Module

Back office Module

Port Operations Control Center (POCC)

14

Vessel ModuleVessel tracking and monitoringVessel activity monitoringBerth management

Yard ModuleCrane activity monitoringYard and cargo operation monitoring

Gate Module Train and train monitor

Environment monitoring

POCC - Examples

15

POCC - Examples

16

Multiuser Terminal operation system (MUT TOS)

17

Non roro cargo module (bulk and break bulk)

Resource and planning module

Core module reporting and administration

Multiuser Terminal operation system (MUT TOS)

18

Service Request module

Resource and planning

module

Non RoRo Cargo

handling module

MUT TOS discharging process

19

Financial department Billing System

20

Register a company or

customer

Charging fees

Releasing export and

import cargo

Paymenttracking

The Power of PowerPoint | thepopp.com2

1

Ro-Ro Stimulation

| 22 |

PCS

A COMPLETE SOLUTION FOR THE

PORT OF BAKU

Modules:

• PCS Port Community System

• RoRo TOSTerminal Operating System for RoRo

(Trucks and Rail Wagons)

• General Cargo TOS -MUTOS Terminal Operating

System for Multiuser

Terminal with

✓ WAREHOUSE Management

System

✓ CONTAINER Management

• BILLBilling Module

• CONTROL ROOMPOCCPort operational Control room

BILLCONTROL ROOMPOCC

RoRo

TOS

GENERAL CARGO MUTOS

WAREHOUSE

CONTAINER

| 23 |

PCS

A COMPLETE SOLUTION FOR THE

PORT OF BAKU

BILLCONTROL ROOMPOCC

RoRo

TOS

GENERAL CARGO MUTOS

WAREHOUSE

CONTAINER

Modules:

• PCS Port Community System

• RoRo TOSTerminal Operating System for RoRo

(Trucks and Rail Wagons)

• General Cargo TOS -MUTOS Terminal Operating

System for Multiuser

Terminal with

✓ WAREHOUSE Management

System

✓ CONTAINER Management

• BILLBilling Module

• CONTROL ROOMPOCCPort operational Control room

| 24 |

Modules:

• PCS Port Community System

• RoRo TOSTerminal Operating System for RoRo(Trucks and Rail Wagons)

• General Cargo TOS -MUTOS Terminal Operating System for Multiuser Terminal with

✓ WAREHOUSE

Management System

✓ CONTAINER Management

• BILLBilling Module

• CONTROL ROOMPOCCPort operational Control room

Discharging Process

Step 1

PLGPlanned to Ground

PLGPlanned to Ground

PLGPlanned to Ground

IARIn Arrival

| 25 |

Discharging Process

Step 2

| 26 |

YRDTruck on Yard

Discharging Process

Step 2

| 27 |

Discharging Process

Step 2

| 28 |

RTLReady to Leave

Discharging Process

Step 3

| 29 |

DPTDeparted

Discharging Process

Step 3

| 30 |

Loading

ProcessStep 1

IARIn Arrival

| 31 |

ATGAt the Gate

Loading

ProcessStep 1

| 32 |

Loading

ProcessStep 2

| 33 |

YRDTruck on Yard

Loading

ProcessStep 2

| 34 |

LDVLoaded to Vessel

Loading

ProcessStep 3

| 35 |

PCS CONNECTS PMIS WITH THE

COMMUNITY

PCS/PMIS

Vessel announcementTugboat services

Border controlGate message

Truck announcementWagon announcement

MARITIME ADMINChannel clearance,

ETA, ETD, Commission clearance

POCCGate, yard, storage, vessel

and activity messages, Berthing, ETA ETD

AGENT/FORWARDERLoad/Discharge Orders

Cargo Manifest

Customs approval, customs block

SANITARY INSPECTIONPhytosanitary/health

inspection

IARIn Arrival

Discharging Process

PLGPlanned to

Ground

YRDTruck On

Yard

RTLReady To

Leave

DPTDeparted

Loading Process

ATGAt The Gate

IARIn Arrival

YRDTruck On

Yard

LDVLoaded to

Vessel

45