Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

Post on 27-Dec-2015

216 views 3 download

Transcript of Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

Peter Sharp CERN CMS Electronics 2003 1

CMS LV Power System

CMS LV Power System

Peter Sharp

7 April 2003

Peter Sharp CERN CMS Electronics 2003 2

CMS LV Power System

Peter Sharp CERN CMS Electronics 2003 3

CMS LV Power System

Peter Sharp CERN CMS Electronics 2003 4

CMS LV Power System

Proposed System Design -1• Hard Wired Sensors – Continuous monitor (Temperature…)• If Detector ‘Safe’ switch on Control System(Low Power Dissipation)

• Control System (Tracker and ECAL use Tracker System)

• DCU provides comprehensive sensing of Detectors• If Detector ‘Safe’ prepare to switch on Low Voltage System• ‘Set-Up’ LV Regulators on Front End Electronics (ECAL)

• Sequentially bring on Low Voltage Power Systems

Peter Sharp CERN CMS Electronics 2003 5

CMS LV Power System

Proposed System Design – 2

Peter Sharp CERN CMS Electronics 2003 6

CMS LV Power System

Proposed System Design – 3

Peter Sharp CERN CMS Electronics 2003 7

CMS LV Power System

Proposed System Design – 4

Peter Sharp CERN CMS Electronics 2003 8

CMS LV Power System

Proposed Schedule• Agree Sub-Detector Requirements in May 2003 (Electronics Week)

• Define Responsibilities of CERN and Fermi Lab in May 2003• Outline Costs of System (for planning) in June 2003• Complete Prototype AC-DC Converter Tests in September 03• Sub-Detector Prototypes for System Tests in December 2003• Review System and Integration Plans in December 2003• Final Prototypes for tests with the Magnet in January 2005

Peter Sharp CERN CMS Electronics 2003 9

CMS LV Power System

Proposed Decision Schedule• Agree to Fund the Design of the CMS LV System Today• Agree Specifications of AC-DC Converters May 03• Agree ‘Planning’ Costing of System June 03• Agree System Design and Integration Plans Dec 03• Agree Final Design of AC-DC Converters March 04• Agree to Procure 2 MGSs Jan 04• Install Power Distribution System March 05