Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

9
Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System CMS LV Power System Peter Sharp 7 April 2003

Transcript of Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

Page 1: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

Peter Sharp CERN CMS Electronics 2003 1

CMS LV Power System

CMS LV Power System

Peter Sharp

7 April 2003

Page 2: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

Peter Sharp CERN CMS Electronics 2003 2

CMS LV Power System

Page 3: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

Peter Sharp CERN CMS Electronics 2003 3

CMS LV Power System

Page 4: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

Peter Sharp CERN CMS Electronics 2003 4

CMS LV Power System

Proposed System Design -1• Hard Wired Sensors – Continuous monitor (Temperature…)• If Detector ‘Safe’ switch on Control System(Low Power Dissipation)

• Control System (Tracker and ECAL use Tracker System)

• DCU provides comprehensive sensing of Detectors• If Detector ‘Safe’ prepare to switch on Low Voltage System• ‘Set-Up’ LV Regulators on Front End Electronics (ECAL)

• Sequentially bring on Low Voltage Power Systems

Page 5: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

Peter Sharp CERN CMS Electronics 2003 5

CMS LV Power System

Proposed System Design – 2

Page 6: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

Peter Sharp CERN CMS Electronics 2003 6

CMS LV Power System

Proposed System Design – 3

Page 7: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

Peter Sharp CERN CMS Electronics 2003 7

CMS LV Power System

Proposed System Design – 4

Page 8: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

Peter Sharp CERN CMS Electronics 2003 8

CMS LV Power System

Proposed Schedule• Agree Sub-Detector Requirements in May 2003 (Electronics Week)

• Define Responsibilities of CERN and Fermi Lab in May 2003• Outline Costs of System (for planning) in June 2003• Complete Prototype AC-DC Converter Tests in September 03• Sub-Detector Prototypes for System Tests in December 2003• Review System and Integration Plans in December 2003• Final Prototypes for tests with the Magnet in January 2005

Page 9: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.

Peter Sharp CERN CMS Electronics 2003 9

CMS LV Power System

Proposed Decision Schedule• Agree to Fund the Design of the CMS LV System Today• Agree Specifications of AC-DC Converters May 03• Agree ‘Planning’ Costing of System June 03• Agree System Design and Integration Plans Dec 03• Agree Final Design of AC-DC Converters March 04• Agree to Procure 2 MGSs Jan 04• Install Power Distribution System March 05