Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.
-
Upload
cathleen-blankenship -
Category
Documents
-
view
216 -
download
3
Transcript of Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.
![Page 1: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.](https://reader035.fdocuments.us/reader035/viewer/2022071807/56649e375503460f94b27916/html5/thumbnails/1.jpg)
Peter Sharp CERN CMS Electronics 2003 1
CMS LV Power System
CMS LV Power System
Peter Sharp
7 April 2003
![Page 2: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.](https://reader035.fdocuments.us/reader035/viewer/2022071807/56649e375503460f94b27916/html5/thumbnails/2.jpg)
Peter Sharp CERN CMS Electronics 2003 2
CMS LV Power System
![Page 3: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.](https://reader035.fdocuments.us/reader035/viewer/2022071807/56649e375503460f94b27916/html5/thumbnails/3.jpg)
Peter Sharp CERN CMS Electronics 2003 3
CMS LV Power System
![Page 4: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.](https://reader035.fdocuments.us/reader035/viewer/2022071807/56649e375503460f94b27916/html5/thumbnails/4.jpg)
Peter Sharp CERN CMS Electronics 2003 4
CMS LV Power System
Proposed System Design -1• Hard Wired Sensors – Continuous monitor (Temperature…)• If Detector ‘Safe’ switch on Control System(Low Power Dissipation)
• Control System (Tracker and ECAL use Tracker System)
• DCU provides comprehensive sensing of Detectors• If Detector ‘Safe’ prepare to switch on Low Voltage System• ‘Set-Up’ LV Regulators on Front End Electronics (ECAL)
• Sequentially bring on Low Voltage Power Systems
![Page 5: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.](https://reader035.fdocuments.us/reader035/viewer/2022071807/56649e375503460f94b27916/html5/thumbnails/5.jpg)
Peter Sharp CERN CMS Electronics 2003 5
CMS LV Power System
Proposed System Design – 2
![Page 6: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.](https://reader035.fdocuments.us/reader035/viewer/2022071807/56649e375503460f94b27916/html5/thumbnails/6.jpg)
Peter Sharp CERN CMS Electronics 2003 6
CMS LV Power System
Proposed System Design – 3
![Page 7: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.](https://reader035.fdocuments.us/reader035/viewer/2022071807/56649e375503460f94b27916/html5/thumbnails/7.jpg)
Peter Sharp CERN CMS Electronics 2003 7
CMS LV Power System
Proposed System Design – 4
![Page 8: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.](https://reader035.fdocuments.us/reader035/viewer/2022071807/56649e375503460f94b27916/html5/thumbnails/8.jpg)
Peter Sharp CERN CMS Electronics 2003 8
CMS LV Power System
Proposed Schedule• Agree Sub-Detector Requirements in May 2003 (Electronics Week)
• Define Responsibilities of CERN and Fermi Lab in May 2003• Outline Costs of System (for planning) in June 2003• Complete Prototype AC-DC Converter Tests in September 03• Sub-Detector Prototypes for System Tests in December 2003• Review System and Integration Plans in December 2003• Final Prototypes for tests with the Magnet in January 2005
![Page 9: Peter Sharp CERN CMS Electronics 2003 1 CMS LV Power System Peter Sharp 7 April 2003.](https://reader035.fdocuments.us/reader035/viewer/2022071807/56649e375503460f94b27916/html5/thumbnails/9.jpg)
Peter Sharp CERN CMS Electronics 2003 9
CMS LV Power System
Proposed Decision Schedule• Agree to Fund the Design of the CMS LV System Today• Agree Specifications of AC-DC Converters May 03• Agree ‘Planning’ Costing of System June 03• Agree System Design and Integration Plans Dec 03• Agree Final Design of AC-DC Converters March 04• Agree to Procure 2 MGSs Jan 04• Install Power Distribution System March 05