Permit to Work SystemPermit Orientation Training
PTWS – Permit Orientation Training
Typical work at our site
Introducing:•Sue – who has come to repair the toilet at Z Mana•Fred – who has come to install new electrical socket•Jack – who has come to install a tank for a new site•Lisa – who has come to drop off tobacco at Z Skyway
PTW System –PI Training
PTWS Requirements
At Z, we reckon everybody should work safe and
go home safe.
The PTWS is:•Risk focused•Specific to Z work activities •Specific to Z site environments •A system to ensure hazards are:
- identified, - risk assessed, - controls established and - work undertaken by competent people
PTW System –PI Training
PTWS– Other HSSE
Z policies/systems/rules for HSSE:These include:
- HSSE Management System Manual- Life Saving Rules- Working at height policy- Contractor Prequalification- Site specific rules (e.g. ChCh airport depot, Retail sites,
construction sites); Standard Operating Procedures- Permit to work system
All workers are required to comply with all regulatory requirements and Z policies/systems/rules.
PTW System – PI Training
PTWS Requirements
Authority:• All Z employees, site representatives, contractors and workers,
are authorised to stop the work if there is a HSSE concern.
• This new PTWS requirements - effective as of 1 May 2014.
• Existing requirements remains in force until then.
PTW System –PI Training
Z’s Life Saving Rules
PTW System – PI Training
PTWS Applicability
• Applies to all workers conducting work for and on behalf of Z on premises operated by Z.
• The PTWS is mandatory and applies to non- routine work being completed at workplaces under Z operational control, Retail sites, Mini Tanker Zee sites, work conducted under a Z Construction Contract, or when working on Z owned equipment at sites owned or operated by others.
• A permit is required for all permitable activities.
PTW System – PI Training
Non-routine Work
Non-routine Work - Work that is NOT performed regularly in a controlled environment with an approved Standing Operating Procedure or equivalent document.
For example non-routine work is a work activity that is, but not limited to, any of the below:•Performed infrequently •Outside of normal duties •Does not have an approved standing operating procedure •Performed in a different way from the standing operating procedure •Has never been performed before
PTW System – PI Training
Roles
Z CEO – overall owner of PTWS
HSSE Manager – PTWS custodian, responsible for the implementation of this PTWS.
PTWS Orientation Trainer – provides PTWS training.
PTWS Administrator –administering documents, records, PTWS website
Senior Permit Issuer –monitors operational performance of the PTWS
PTW System – PI Training
Roles
Permit Issuer - prepares, authorises and issues Permits to Work
Permit Holder – ensures the permit requirements are put in practice; taking all necessary steps to perform the work in a safe and environmentally sound manner
Authorised Gas Tester – tests and confirms the environmental working condition is safe to work in
Site Representative - the site staff member who confirms the site environment is safe for the contractor to work; sign contractor on and off site via the Work Clearance Form (WCF)
PTW System – PI Training
Responsibilities
Permit Issuer primary responsibility:By signing the permit the Permit Issuer agrees that they have reviewed and discussed the work scope and required documentation with the Permit Holder, and identified any hazards they are aware of in the permit
Permit Holder primary responsibility:By signing the permit the Permit Holder agrees to comply by putting in place the permit and supporting documents requirements and continuously supervising the work
PTW System – PI Training
Roles Matrix
PTW System – PI Training
Role Issue permits Self permits Appoints PI PTWS assurance
activities system Stop work if necessary
HSSE Manager X X X
Administrator X X X
Trainer X X
Senior Permit Issuer X X
Permit Issuer X X X
Permit Holder X X X X
Authorised Gas Tester
X X X X
Z Site Representative X X X X
Workers X X X X
Z Staff X X X X
Key: X = is not responsible and cannot undertake the task/role = is responsible and can undertake the task/role
Activity Risk Levels
Work activities are categorised based on risk:
Permitable (High Risk) activities
Non-permitable:•Medium Risk activities, •Low Risk activities, and •Deliveries
Each risk category has different control measure requirements
PTW System – PI Training
Permitable Activities
PTW System – PI Training
Permitable Activities - High Risk: •Hot work in hazardous area•Confined space entry•Excavations >/= 1.5 m•Live Electrical Work•Abnormal work or maintenance - overriding/disabling safety critical device•Hazardous substance exposure of high residual risk or greater•Energised high pressure system work to hydrant lines•Live Product Line Work•Work at height exceeding 1.8 metres (refer exclusions)
Permitable Activities
Permitable Activities continued - High Risk: •Shop roof construction and/or installation•Canopy construction and /or installation•Working on single skin canopy roof•Working on a non-trafficable secondary surface•Tank Removal and/or installation•Demolition – excluding soft strip out•Crane work – excluding standard stock deliveries•Any other activity that has a high or extreme residual risk•Any other activity as determined by Z senior management/permit issuer
PTW System – PI Training
Non Permitable
Medium Risk Activities:
•Restricted Space
•Excavations between 0.5 metres and 1.5 metres
•High pressure system work to a compressed air system
•Work at height 0.5 metres or greater (excluding permitable)
•Non powered hoist use involving a suspended load
•Work off site in roadways
•Work on electrical equipment and circuits
•Erection structures
PTW System – PI Training
Non Permitable
•Medium Risk Activities continued:•Pump out of product from tanks•Drilling of monitoring wells or soil borings•Hazardous substance exposure of medium residual risk•Hot work outside of the hazardous zone•Any other risk that has a medium residual risk•Any other activity as determined by Z senior management/permit issuer
PTW System – PI Training
Non Permitable
Low Risk: •Any other activity deemed low risk using Z’s risk matrix•E.g. changing the washer on the tap
Deliveries: •Delivery only services – drop off and pickup standard deliveries of stock •For example:
- Coca cola delivery to retail store or - construction material to a stock pile on site
PTW System – PI Training
DocumentationDocumentation for the PTWS is available at www.z.co.nz/ptwinfo.
• Work Clearance Form must be completed daily by all Contractors for all work prior to starting work
• Safe Work Method Statement must be completed for Permitable activities – high risk prior to obtaining the permit
• Job Safety Analysis or equivalent must be completed for Medium risk work prior to performing the work
• Permit (permit to work) must be completed by the PermitIssuer for Permitable work.
• Certificates where applicable must be used with a Permit
PTW System – PI Training
Permit Certificates
Certificates:•A – Hot Work Certificate •B – Confined Space Certificate •C - Work at Height - roofs, canopies and temporary structures •D – Excavation Certificate •E – Isolation Certificate•F – Tank Removal / Installation Certificate•G - Demolition Certificate•H - Overhead Crane Certificate
PTW System – PI Training
Work Clearance Form
Work Clearance Form:
• a process of hazard identification
• designed to stop work or trigger the need for a Permit etc
• completed by the contractor/worker performing the work in conjunction with the Z Site Representative for manned sites/offices.
PTW System – PI Training
Z Risk Assessment MatrixInsignificant Minor Moderate Major Extreme
A B C D E
90-100% probability that the event will occur in the next 12 months
Almost Certain 1
50-90% probability that the event will occur in the next 12 months Likely 2
25-50% probability that the event will occur in the next 12 months Possible 3
5-25% probability that the event will occur in the next 12 months Unlikely 4
0-5% probability that the event will occur in the next 12 months Rare 5
Injuries with severity up to first aid cases.
Medical treatment case , restricted work case, & lost work day cases resulting in up to 7 days away from work.
Lost work day cases resulting in up to 21 days away from work.
Little damage or threat to health.
Minor health effect, fully reversible in the short term
Diagnosed occupational illness case, irreversible damage to health; long-term disabilites.
Loss of containment (LOC) or loss of primary containment (LOPC) up to 5 litres (except marine oil spill which is of higher risk)
Loss of containment (LOC ) or loss of primary containment (LOPC) up to 70 litres (except marine oil spill which is of higher risk)
Loss of containment (LOC) or loss of primary containment (LOPC) above 70 litres and up to 700 litres (except marine oil spill)
Loss of containment (LOC) or loss of primary containment (LOPC) above 700 litres (except marine oil spill)
Tier 1 marine oil spill Tier 2 marine oil spill Tier 3 marine oil spillSingle exceedance of statutory environmental limits requiring remediation work of no more than 7 days.
Frequent (1 or 2 per year) exceedance of statutory environmental limits, requiring remediation work of a between 1 week and 1 month.
Multiple environmental impacts (more than 2 within 12 months) resulting in remediation work for a period of greater than 1 month and less than 3 months.
Medium/Long-term environmental impacts requiring remediation work for a period greater than 3 months.
Damage and remediation < $100K except when process safety related)
Damage and remediation $100K - $1M (except when process safety related)
Damage and remediation $1M - $10M (except when process safety related)
Damage and remediation $10M - $50M (except when process safety related)
Damage and remediation > $50M
Tier 2 process safety incident Tier 1 process safety incidentIncident results in temporary shutdown of infrastructure for less than 4 hours.
Temporary loss of local infrastructure (less than a week)
Loss of major infrastructure for period of 1 month.
Loss of major infrastructure for a period of greater than 1 month and less than 3 months.
Loss of major infrastructure for a period greater than 3 months
LIKELIHOOD
Heal
th a
nd
inju
ryEn
viro
nmen
tal i
mpa
ctDa
mag
e an
d lo
ss
Life-threatening consequences; Permanent total disability (PTD) or injury with irreversible health problems resulting from injury or occupational illness.
Fatality or multiple or widespread long-term health impacts.
CONSEQUENCES
LOWIn general risks rated as Low residual risk should be able to be accepted. Acceptable risks do not require treatment; however the controls, procedures and practices will need periodic monitoring to ensure that the level of the risk has not changed.
CRITICALFurther treatment should be considered immediately. Consider ceasing operations created by the risk or revise the strategy to increase the opportunity for treatment.Critical risks must be reported to the Executive and the CEO immediately upon its identification. C ritical risks require Z Executive Team level management review and acceptance if the risk is to continue. Monitoring of control effectiveness is critical. Risks without control shall be treated immediately.
HIGHFurther treatment should be considered. High risks must be reported to the Executive as soon as possible after it has been identified.
Requires Z Executive Team management attention and at least quarterly review. Monitoring of control effectiveness is important. Risk without control shall be treated immediately and controls put in place.
Reportingand Mitigation Actions
MEDIUMRisk is generally acceptable provided that the risk is managed. Report Medium residual risks up through the management chain to the appropriate Operational Manager. Risk mitigation actions are to be developed or introduce sufficient controls to lower risk level as soon as possible.
SWMS/JSA Hierarchy of Controls
Hierarchy of controls for determining control measures in order:
1. Eliminate the hazard e.g. by changing the work2. Substitute e.g. change material/equipment to one with
less hazards3. Isolate the hazard e.g. by providing a form of barrier4. Engineering Controls e.g. physical guards, structures,
stop buttons5. Administration Controls e.g. SWMS, Procedures,
Training6. PPE e.g. by providing protective equipment
PTW System – PI Training
Hierarchy of Fall Protection Controls
Fall Protection hierarchy of controls for determining work at height control measures in order:
1. Eliminate the work at height e.g. by changing the work2. Work from permanent guard rail3. Work from temporary guard rail or elevating working
platform (scissor lift/boom 4. Work with fall restraint means - PPE5. Work with fall arrest means - PPE
PTW System – PI Training
Permit Validity
Permit is valid for:• a specific activity, site, within a specific period of time.•only issued for a maximum of 5 consecutive calendar days.•applied for in advance of the work – ideally 10 working days•issued immediately prior to the start of the permitable work•renewed via the Work Clearance Form each day by Permit Holder•expires after 5 days regardless of the activity
Self Permits•No one is allowed to issue a Permit to themselves
PTW System – PI Training
Permit Validity
Remote PermitsA remote Permit can ONLY be issued if ALL of the following criteria is satisfied:
- The PI has knowledge of the site or has reliable drawings and site data
- The PI has a detailed knowledge of the task and activities to be permitted
- The PI has experience working with the Contractor and individual PH.
- The Z senior permit issuer or delegate confirms remote permitting is appropriate and the above criteria have been met.
PTW System – PI Training
Permit Validity
Contractor Permitting•A PI may issue a Permit to another person in the same Contractor organisation. Blanket Permits•Blanket Permits are not permitted. Derogations and standard operating procedure approval •SOP more appropriate for repetitive, routine activities. •Refer to PTWS Manual for procedure to obtain derogation approvalChanges in Conditions
•Stop work and notify Permit Issuer
PTW System – PI Training
Training and Competency
PTW System – PI Training
Permit Issuer Training
Roles Training Courses / Certification Completed
Permit Issuer Z PTWS Orientation quiz 90% pass, (can retest up to 3 times)
Permit Issuer 2 Supervised Permits and recommended as PI
Permit Issuer 4 years work experience for relevant activities they want to issue Permits for
Permit Issuer US 17590Permit Issuer - Hot Work Hot Work Certificate IssuerPermit Issuer - Confined Space Confined Space Certificate IssuerPermit Issuer - Excavation Excavation Certificate IssuerPermit Issuer - Isolation Isolation Certificate Electrical / Mechanical IssuerPermit Issuer - Work at Height Working at Height IssuerPermit Holder (Recommend) Z PTWS OrientationPermit Holder (Recommend) US 17588Key Personnel Z Z PTWS Orientation attendance (record by COD pass on to them)Key Personnel Contractors (Recommended) Z PTWS Orientation attendance Work Clearance Form - Z Site Rep/Site Manager Z PTWS site rep Litmos module (records in Litmos)
Training and Competency
Permit Type Qualification Confined Space US 3058 Gas testing in high risk industries
US 25510 Atmospheric testing US 17599 Confined Space planning US 18426 Hazard Identification
Hot Work US 3058 Gas testing in high risk industries US 25510 Atmospheric testing US 25043 Energy isolation
Work at Height US 17600 Safe work practices for working at heights
US 25045 Employ height safety equipment in the workplace
Excavation US 14611 Excavation hazards and traffic control
US 10543 Protect underground services during excavation and reinstatement
Electrical / Mechanical Isolation
US 25043 Energy isolation
Permit Issuer Training – specific activity requirements
PTW System – PI Training
PTWS Documentation Available
•www.z.co.nz/ptwinfo
Contacts
• Andy Velasquez• Andy.velasquez@z.co.nz
•Tracy – PTWS Orientation Trainer•Tracy.evans-tracy@z.co.nz
PTW System – PI Training
Transition TimelinePTWS transitional requirements timeframe :•1 May 14 - effective date for all criteria except:
- 30 Jun 14 Updated Z PTWS Orientation training completed- 1 Jul 14 SWMS template compliance by Permit Holder - 1 May 15 Updated Safetrac training completed by Z employees - 1 May 15 Updated legal documents- 1 May 15 Full Permit Issuer competency requirements compliance (plan to meet requirements and progress evidence to be submitted to the PTWS Trainer by 30 Jun 14, 1 Dec 14, 1 Mar 15- 1 May 15 Full compliance to PTWS Manual
PTW System – PI Training
Typical work at our site
Introducing:•Sue – who has come to repair the toilet at Z Mana•Fred – who has come to install new electrical socket•Jack – who has come to install a tank for a new site•Lisa – who has come to drop off tobacco at Z Skyway
PTW System –PI Training
Tank installation
Tank installation
Tank installation
Tank installation
Tank installation
Tank installation
Tank installation