Overview: Advanced Photon Source User Program · Overview: Advanced Photon Source User Program...

Post on 30-Apr-2020

8 views 0 download

Transcript of Overview: Advanced Photon Source User Program · Overview: Advanced Photon Source User Program...

Overview: Advanced Photon Source User Program

Susan Strasser Senior Advisor, APS User Program “Three-Way” Meeting Argonne National Laboratory July 31, 2013

Agenda for the Day

Facility Overviews (9:00–11:30am) Publications (11:30–Noon) Working Lunch–General Discussion of Topics Covered in the Morning (Noon–1:00pm) Databases and Data Management (1:00–2:00pm) Scientific Access: Proposal Systems (2:00–3:30pm) Special Facility Access Requirements/International & Gov’t. Review (3:15–4:15pm) User Meetings, Organizations, Workshops and Industrial Issues (4:15–5:30pm) Reception (6:00–7:30pm) No-host Dinner – To be determined

March 20, 2013

2

APS Key Information

Groundbreaking: June 4, 1990 Key operational dates:

– First light: March 26, 1995 – First user operations run: early 1996

Initial configuration and subsequent changes – All beamlines funded, built , and operated by Collaborative Access Teams (CATs) – 20 initially – Transition to APS-operated beamlines began in late 2001-early 2002 – Current (FY2013) configuration: 32 CAT beamlines, 34 APS-operated beamlines (45 ID, 21 BM)

First partially centralized proposal system for Independent Investigators: early 2000 Initiation of current central proposal system for General Users: October 1, 2002 Expansion of central proposal system to include all proposals: February 2009 Beginning of central scheduling system: May 2009

March 20, 2013

3

Statistics: APS Users by Fiscal Year (Each person is counted only once/year.)

March 20, 2013

4

766

1197

1488

1964

2283

2770 2754

3199 3253 3401

3229 3459

3642 3721

3976

0

500

1000

1500

2000

2500

3000

3500

4000

4500

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

No.

of U

sers

Fiscal Year

Statistics: APS User Visits by Fiscal Year (Each visit is counted.)

March 20, 2013

5

1998

0

2000

4000

6000

8000

10000

12000

14000

16000

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

No.

of U

ser V

isits

Fiscal Year

Statistics: APS Users by Institution and User Type

March 20, 2013

6

Foreign Academic Inst. 186

U.S. Academic Inst. 204

U.S. Industry

73

U.S. Medical School

42

Foreign Other 45

No Info. Provided 3

Foreign Industry 8

Foreign Nat’l Lab 12

U.S. Gov’t Funded Agency/Inst. 18

U.S. National Lab 16

U.S. Private Research Inst. 24

Faculty/Prof. Staff 1552

Grad Student 1477

Post-doc 1042

Retired/Self-employed 5 No Info

Provided 3 Undergraduate

207

Other 75

Fiscal Year 2012 10.1.11 through 9.30.12

Statistics: Users by Geographical Affiliation (FY 2012)

March 20, 2013

7

562 Non-US Total

Statistics: APS Experiments by Fiscal Year

March 20, 2013

8

560

944 1164

1391 1558

2011 2171

2371 2661

2934 3180

3628 3899

4415

4867

0

1000

2000

3000

4000

5000

6000

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

No.

of E

xper

imen

ts

Fiscal Year

Statistics: APS Requests for Beam Time (BTRs) vs. Allocated Beam Time

March 20, 2013

9

0

500

1000

1500

2000

2500

3000

3500

4000

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Non-PX BTRS

Non-PX Allocated BTRS

PX BTRS

PX Allocated BTRS

APS Overview: Budget ($M)

March 20, 2013

10

ARRA – American Recovery and Reinvestment Act GPP – General Plant Projects AIP – Accelerator Improvement Projects

11

APS User Office: Staffing and Functions

APS User Office Staff (10 total – 9 permanent, 1 STA)

User Office Responsibilities:

– User registration – Site an scientific access (non-US citizen

permissions, scientific proposal systems) – Training – User conference/workshop administrative

support (Annual User Meeting + others) – APS Users Organization, Partner User

Council – Support for various review committees – User electronic communications and user

Web pages – User data management – Scientific Advisory Committee – User Web applications

Publications by Calendar Year (1998-2013) (more from Rick Fenner, APS Director’s Office)

March 20, 2013

12

0

200

400

600

800

1000

1200

1400

1600

1800

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

No.

of P

ublic

atio

ns

Calendar Year

Journals Other

Use of the APS by industry: History (1998-2009)

0.0%2.0%4.0%6.0%8.0%

10.0%12.0%14.0%16.0%18.0%20.0%

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Industrial Support

Industrial Institution

May 9, 2013

Industries either built (or contributed to building) beamlines – DND-CAT (Dow, DuPont, Northwestern) – IMCA-CAT (12 big pharma companies) – IMM-CAT – IBM, McGill,MIT – MHATT-CAT – Michigan, Howard, AT&T – LRL-CAT – Eli Lilly Research Laboratory – UNI-CAT – UOP – CMC-CAG – Exxon-Mobil

Industrial User Program (2010-2012)

8892 unique users for 2010-2012; 363 (~4% from industry) Industrial Users can be General Users, Partner Users, or come in for quick

one-time measurements – some industrial work is proprietary; most is not APS recently hired Jyotsana Lal as a User Outreach Scientist to work with

industry New Industry tab on APS Home Page More information on industrial interactions in Friday’s session

March 20, 2013

14

APS Proprietary Process and Pricing

Must have a proprietary user agreement in place to cover liability, intellectual

property, and payments – Currently there are 110 proprietary user agreements in place – Must have a prefunded user account in place

Proprietary rate for FY12 is $361.58/hour Proprietary income from FY2012 was $1,966.8K (~10% of APS operating budget)

March 20, 2013

15

APS Proposals, Databases, Communication, Outreach, and More…

Still to come, APS presentations about the following later today! Publications – Rick Fenner Databases/User Portals at the APS – Connie Vanni Scientific Access – Beam Time Access Proposal System – Bev Knott Special Facility Site Access Issues – Susan White-DePace Outreach/Communication/User Meetings – Connie Vanni

March 20, 2013

16