Office Build-out / Relocation

Post on 13-Apr-2017

248 views 0 download

Transcript of Office Build-out / Relocation

`

Project NameBalfour BeattyNew Office Build-out

Project LocationAtlanta, Georgia

Project Team

Commercial Offices

Markets

Owner: Balfour Beatty

Architect: HeeryInternational, Inc.Contractor: McKenney’s, Inc.

SpecializationsDesign/Build

McKenney’s designed and installed mechanical systems for Balfour Beatty’s 15th floor office relocation in Atlanta, Georgia.

The ChallengeWith demo set to begin in less than a month following the initial kickoff meeting, Balfour Beatty needed design/build expertise tofast-track the installation of new plumbing and HVAC systems. The McKenney’s team had to work closely with the architect andnavigate frequent design and schedule changes to achieve the specific, high-finish look required.

The SolutionThe team’s design/build experience shined throughout the project, ensuring the installation met the high expectations of both thearchitect and Balfour Beatty. For example, the team reworked the medium pressure loop and relocated almost all of the terminal unitsto achieve the aesthetic vision for the space. Even with multiple design and schedule changes, McKenney’s completed the workon time.

The content of this document is not intended as an endorsement.

The ResultsBalfour Beatty was extremely pleased with the outcome as well as the team’s ability to maintain the budget—despite the high-finishjob and design requirements.

1056 Moreland Industrial BoulevardAtlanta, Georgia 30316P: 404-622-5000

sales@mckenneys.com

3601 Performance RoadCharlotte, North Carolina 28214P: 704-357-1200

Atlanta Office:

Charlotte Office:

www.mckenneys.com