Build Out Analysis

17
BUILD OUT ANALYSIS Presented By- Muhammad Salaha Uddin Lecturer, Department of Urban & Regional Planning Khulna University of Engineering and Technology

Transcript of Build Out Analysis

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 1/17

BUILD OUT ANALYSIS

Presented By-

Muhammad Salaha Uddin

Lecturer, Department of Urban & Regional Planning

Khulna University of Engineering and Technology

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 2/17

Introduction

 A build-out analysis is used to estimate and describe theamount and the location of future development that may beallowed to occur within a specified area or a givencommunity under a current development regulations.Through a series of maps and charts, the build-out analysis

provides an estimation of the total number of houses,commercial/industrial square footage, and population thatcould result if all the unprotected, buildable land within acommunity or specified area is developed, if no more landis permanently protected, and if local zoning andsubdivision regulations remain unchanged. This information

is instrumental for estimating future demands on publicinfrastructure and the environment.

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 3/17

 Applicability

It is recommended that a build-out analysisbe conducted primarily for those

communities experiencing rapid growth 

and a dwindling supply of vacant land. It isnot recommended for those communities

that have preserved large amounts of

vacant land  because the analysis couldresult in misleading representations of the

amount of buildable land available.

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 4/17

 An Example

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 5/17

Existing Simulated

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 6/17

Methodology

Build Out Analysis Consists Two-PhaseProcess:

1. Mapping and Interpretation

2. Quantitative Estimates

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 7/17

Mapping and Interpretation

1. The first step is to prepare a large base map ofyour community, Additional overlay sheets willbe added later to illustrate possible futuredevelopment scenarios for your community.

The base map should show the following:

• the boundaries of your community 

• a north arrow and map scale • existing streets 

• tax/ property parcel boundaries 

• surface water areas (lakes, rivers, streams) 

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 8/17

Mapping and Interpretation

Overlay Sheets

1. Delineate all the land area within your community that cannot

be developed due to public ownership, conservation easements

(deed restrictions), utility easements, or natural factors such as

wetlands, floodplains, and steep slopes over 25%. This informationshould already be available from your natural resources inventory

maps and your development constraints map.

2. Delineate all the undeveloped land area within your community

that could be developed in the future. This information should

already be available from your development opportunities map. It

is important when delineating this information that you include both

vacant lands and buildable lands. Buildable lands are those that

are suitable for development, i.e. free from any development

constraints.

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 9/17

Mapping and Interpretation

Overlay Sheets

3. Delineate all the land within your community that has already been

developed and contains existing buildings and structures and lot

lines. This information will be available from your existing land use

map. You do not need to show each residential, commercial, orindustrial land use type. You can combine all your developed land

together as one overlay.

4.Delineate the zoning district boundaries from your community’s 

zoning map. All you need to do here is just show the zoning districtboundary lines.

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 10/17

Ovelaying Process

When you have completed all four sheets, laythese sheets on top of your base map. Each oneof the overlay sheets represents a data layer, ifyou are using GIS. Divide your community intoequal geographical sections or regions. Withineach section, take a close look at theundeveloped but buildable land area and how itis currently zoned. Identify the tax map/Owner’s 

number of each parcel of buildable land. Withineach parcel, highlight the land area that isbuildable and calculate the acreage.

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 11/17

Buildable Land Area

For each buildable land area that is zoned residential,apply your community’s  road standards and minimum lotsize and frontage requirements, as if the land could bedeveloped to the maximum extent allowable. In other

words, estimate mathematically the number of housingunits that could be allowed on the land based on theseregulatory standards. For commercial or industrial zonedland, estimate the number of buildings or the maximumbuilding size that could fit on each parcel, keeping in mind

the possible use and your community’s  setback, parking,landscaping, building height, and other zoning standards.This should result in a floor area ratio.

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 12/17

Buildable Land Area

Depending upon the size and scale of yourbase map, you may be able to markphysically, or illustrate directly on the overlay

sheet, the number of new house lots or therelative size of the buildings that could bedeveloped. Keep a running total of thenumber of new house lots and buildings and

the acreage (the estimated futuredevelopment potential) within each sectionor geographic region.

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 13/17

Undeveloped Land

If your community has a high percentage ofundeveloped or underdeveloped land, you maywant to prepare staggered overlays showing apossible progression of growth in those areas. Forexample, the first overlay might show growth alongmajor roads and on large parcels. The next overlaycould show growth on the next most desirableparcels. The last overlay would show growth on

the least desirable parcels. In this fashion, youwould be developing and comparing possiblegrowth scenarios.

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 14/17

Stage II: Quantitative Analysis

•  After you have completed all your build-out estimates,the next step is to quantify this information.  This iswhere the use of GIS mapping layers and associateddatabases comes in handy. Under many GIS build-outmodels, the total number of potential new residential

dwellings is calculated simply by dividing the totalbuildable residentially zoned acreage by theminimum lot size  as set forth by the zoning district.Sometimes a development factor  is applied to give thisestimate a measure of reality, as it is to be expected that

design issues and required rights-of-way in a largesubdivision will often result in a smaller number of lotscreated than the maximum allowed. This approach isacceptable, but an even more realistic figure can bedetermined by estimating the number of new dwellingson a parcel-by-parcel basis, based on zoning and the

size and shape of the individual parcel.

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 15/17

Stage II: Quantitative Analysis

• If you quantify your estimates in this

fashion, you should prepare a spreadsheet

for each section or region of your

community, identifying the total acreage ofbuildable land by zoning district, the total

number of potential new dwelling units,

and the number of commercial andindustrial buildings/square footage by

zoning district.

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 16/17

Quantitative Analysis

• Using your community’s  average household size,population, and housing data, you can then project afuture population size and total number of housingunits. You can also calculate the future population andhousing density of each section or region if you know the

square mileage of each area. Density is typicallyexpressed as the number of people or housing unitsper square mile. This information is particularly helpfulas your community considers the demands that futurebuild-out growth will have on schools, water supply,

sewage, utilities, and the like. It is also helpful forevaluating your community’s overall growth potential andin shaping the future development of your communitywith a preferred development scheme and future landuse plan.

8/10/2019 Build Out Analysis

http://slidepdf.com/reader/full/build-out-analysis 17/17

Conclusion

•  After you have completed all of the overlays

depicting maximum growth potential of the area

under study, take a close look at the resulting

development patterns. Build-out analyses aremeant to promote an understanding of the

implications of current land use practices and

the consequences of existing land development

regulations. Is this how you would like to seeyour community develop in the future? Are there

alternatives? If so, what are they?