Ngauranga to Petone Cycleway/Walkway Upgrade

A component of the Hutt Corridor Plan currently out for consultation

The ‘Missing Link’ in the regional Cycle network is going to be fixed

Upgrade and complete walkway/cycleway

Ngauranga to Petone

The Great Harbour Way Coalition is thrilled

Today

When Complete

The case for the project is very strong

• It will fix the ‘missing link’ in our key cycling/walking networks

The case for the project is very strong

• It will fix the ‘missing link’ in our key cycling/walking networks

• For every dollar invested there will be a return of more than 3 dollars – NZTA

– Sole contribution to benefits -Biking to work

The case for the project is very strong

• It will fix the ‘missing link’ in our key cycling/walking networks

• For every dollar invested there will be a return of more than 3 dollars – NZTA

– Sole contribution to benefits -Biking to work

• Feeling safe and comfortable on the separated path will unlock further long term community benefits– Biking for fun

– Family outing

– Cycle tourism

The TimingScheduled for

Investigation 2012-13 Construction 2013-15

We sayBring it forward a year

Submissions close June 15

GHW will submit

We encourage other submissions

•Rotary Club of Hutt City

•Hutt River Trail

•Individuals

•Press releases

•Facebook page for supporters

•Other media