Framework for Balanced Mix DesignNCHRP 20-07/Task 406

Objectives Develop a framework that addresses alternate approaches

to devise and implement BMD procedures incorporating performance testing and criteria.

The framework shall be in the format of an AASHTO recommended practice and will provide DOTs with options on which performance tests to use and how the tests can be used in the overall mix design framework.

TasksNo. Description Status

1 Survey DOTs and industry to determine status of BMD practices

2 Literature review on asphalt mix performance testing

3 Daft AASHTO format recommended practice for BMD

4 Develop Research Problem Statements to address gaps

5 Prepare final report In progress

Identifying Gaps – Example: Thermal Cracking TestsSteps

Low-temperature

SCBDCT I-FIT IDT Creep and

StrengthTSRST and

UTSST BBR Mixture

Selected at the NCHRP 9-57 Workshop Yes Yes Yes No No No

BMD Survey Responses* 40 28 2 17 14 1

1. Develop draft test method and prototype equipment (1) (8) (16, 17, 18) (25, 26) (32, 33) (38, 39)

2. Laboratory sensitivity to materials and relationship to other lab properties (1, 2, 3, 4) (9, 10, 11,

12, 13) (13, 16, 19) (27, 28, 29, 30) (32, 34) (39)

3. Establish preliminary field performance relationship (3) (3) (15) (3, 25, 26) (32, 34, 35) (38, 40)

4. Conduct ruggedness experiment to refine its critical aspects (5) (5) (5, 20) (31) (40)

5. Develop commercial equipment specification and pooled fund purchasing (6, 7) (6) (7, 21, 22) (36, 37) (41, 42, 43, 44)

6. Conduct round-robin testing to establish precision and bias information (14) (23) (31)

7. Conduct robust validation of the test to set criteria for specifications (3) (3, 15) (15) (3, 15)

8. Conduct training (14) (24)

9. Implement into engineering practice IA, MN, MO IL