Post on 30-Dec-2015
MVP JourneySajith Kandiyil
Agenda
Intro
Expectations
Electronics/Embedded Products – Questions basket
MVP route landmark decisions
Ecosystem
Intro
How many entrepreneurs are in the room?
How many have hardware as a part of their solution?
Share a few selected examples of problems faced?
Expectations
Now that I know my audience, lets reach consensus.
KPI – BEST USE OF ALL OUR TIME
Electronics/Embedded Products – Questions basket feel free to add your own.
Should we choose to build our own hardware?
What is a MVP?
Is outsourcing as an option?
What part of my design should I out source?
MVP route landmark decisions
Keep the hardware feature list as minimum as possible.
Find out what is COTS that meets your needs.
Choosing between Arduino and Advantech – Considerations.
Focus on what you are most efficient at.
Chinese soups and hardware.
Ecosystem
Component vendors
PCB Fabricators
Assembly houses
ID/Mechanical designers
Enclosure vendors
Packing box/material vendors
Did I miss anyone?
THE END…………THANK YOU Sajith@avench.com