Monthly Safety Report 2013 08_Aug

Post on 24-Jun-2015

282 views 3 download

Tags:

Transcript of Monthly Safety Report 2013 08_Aug

C270 (HK BIODIESEL PLANT) Safety Report

C270 Monthly Safety Report – August 2013

Safety :Contribution from All Level ( Top to Shop )

SAFETY STATISTICS

Jul 2013 Aug 2013

Accumulated Man-hour 772,884 812,094

Days worked from Commencement

630 661

Accumulated Man-day Lost 1446 1539

Cumulative Accident Frequency Rate

0.78 0.74

SAFETY INSPECTION / MEETINGPhysical site safety walks

SAFETY INSPECTION / MEETING

Weekly Safety Meetings with Safety Representatives of Subcontractors

AREA NEED IMPROVEMENT

HOUSEKEEPING– Site not kept tidy and clean

PROMPT RECTIFICATION

Improvement – Construction waste cleared /

site kept tidy and clean

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

Improvement – Floor hole repaired

HOUSEKEEPING– Floor opening prone to

tripping

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

Improvement – Construction waste collection

bin cleared to accept newly cleared waste

WASTE MANAGEMENT– Construction waste collection

bin not cleared in time

SAFETY TRAINING

Site Specific Safety Induction

Current MonthAccumulate (Oct 2011 –

Jul 2013)

No. of class 10 458

No. of Attendee 25 1908

INDUCTIONTRAINING

TOOL BOX TALKTRAININGSAFETY TRAINING

Topic No. of attendee

Health Prevention of Heat Stroke 67Safety Safe Use of Ladder 67Safety Site Housekeeping 67

Health & Safety Safe Use of PPE 67

Current Month Total 268 nos.

Accumulated Total :6,992 nos.

SAFETY Promotion

8 nos. Very Hot Weather Warning

5 nos. Thunderstorm Warning

2 nos. Tropical Cyclone Warning

Safety News Sharing

13 nos.EC claim communications (HRD/subcontractors)

8 nos.Safety & Health Interface – other main contractors

9 nos.Safety & Health Advice to CHEC

subcontractors

4 nos. Safety & Health Advice - internal

7 nos. Communication with CHEC Safety

Safety Circulation