• MNAA was created in 1970 • 10-member board appointed by the Mayor

of Nashville • No local tax dollars

• 12 Airlines

• 440 daily flights

• Four runways

• More than 888,000 square-foot terminal

• 42 gates

• 4,465 acres

11,039,634

6,000,000

7,000,000

8,000,000

9,000,000

10,000,000

11,000,000

12,000,000

13,000,000

1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Peak of American Hub

American De-Hubs Terrorist Attack

Substantial Growth

Economic Downturn

Recovery and Growth (Nashville Booms)

Busiest Year in History

Rise of Southwest

12,979,803

(Fiscal Year)

EPAX Projection --- Planning + Historical Trend

3,000,000

3,500,000

4,000,000

4,500,000

5,000,000

5,500,000

6,000,000

6,500,000

7,000,000

7,500,000

8,000,000

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

20

21

20

22

Estimate

Historical

BNA Enplanements

EPAX Projection --- Planning

Internal Forecast

www.flynashville.com

BNA Vision Schedule

www.flynashville.com

BNA Vision Groundbreaking

www.flynashville.com

Parking and Transportation Center

Parking

Garage

Rental Car

Ramps

Long-Term A

Roadway

Configuration

www.flynashville.com

Parking and Transportation Center

www.flynashville.com

Parking and Transportation Center

www.flynashville.com

Parking and Transportation Center Entrance

www.flynashville.com

Commercial Ground Transportation Center Layout

www.flynashville.com

Current International Arrivals Building

www.flynashville.com

Interim International Arrivals Building

www.flynashville.com

Interim International Arrivals Building Processing Area

www.flynashville.com

Interim International Arrivals Building Connection to Bag Claim

www.flynashville.com

New D Concourse

UNDER

CONSTRUCTION

D Concourse

Expansion

RFP Date:

Construction Cost:

September 2017

$ 120,000,000

www.flynashville.com

UNDER

CONSTRUCTION

Current Ticketing Lobby

www.flynashville.com

UNDER

CONSTRUCTION

Ticketing and Baggage Claim Expansion

RFP Date:

Construction Cost:

September 2017

$ 150,000,000

www.flynashville.com

Terminal Apron and Taxilane Expansion

UNDER

CONSTRUCTION

Terminal Apron and

Taxilane Expansion

Bid Date:

Construction Cost:

January 2018

$ 23,000,000

www.flynashville.com

What’s the

Price Tag?

Funding sources:

• No local tax dollars

• Bonds

• Federal AIP and state aviation grants

• Passenger Facility Charges (PFCs)

$1.2 Billion