• MNAA was created in 1970 • 10-member board appointed by the Mayor
of Nashville • No local tax dollars
• 12 Airlines
• 440 daily flights
• Four runways
• More than 888,000 square-foot terminal
• 42 gates
• 4,465 acres
11,039,634
6,000,000
7,000,000
8,000,000
9,000,000
10,000,000
11,000,000
12,000,000
13,000,000
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Peak of American Hub
American De-Hubs Terrorist Attack
Substantial Growth
Economic Downturn
Recovery and Growth (Nashville Booms)
Busiest Year in History
Rise of Southwest
12,979,803
(Fiscal Year)
EPAX Projection --- Planning + Historical Trend
3,000,000
3,500,000
4,000,000
4,500,000
5,000,000
5,500,000
6,000,000
6,500,000
7,000,000
7,500,000
8,000,000
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
20
13
20
14
20
15
20
16
20
17
20
18
20
19
20
20
20
21
20
22
Estimate
Historical
BNA Enplanements
EPAX Projection --- Planning
Internal Forecast
www.flynashville.com
BNA Vision Schedule
www.flynashville.com
BNA Vision Groundbreaking
www.flynashville.com
Parking and Transportation Center
Parking
Garage
Rental Car
Ramps
Long-Term A
Roadway
Configuration
www.flynashville.com
Parking and Transportation Center
www.flynashville.com
Parking and Transportation Center
www.flynashville.com
Parking and Transportation Center Entrance
www.flynashville.com
Commercial Ground Transportation Center Layout
www.flynashville.com
Current International Arrivals Building
www.flynashville.com
Interim International Arrivals Building
www.flynashville.com
Interim International Arrivals Building Processing Area
www.flynashville.com
Interim International Arrivals Building Connection to Bag Claim
www.flynashville.com
New D Concourse
UNDER
CONSTRUCTION
D Concourse
Expansion
RFP Date:
Construction Cost:
September 2017
$ 120,000,000
www.flynashville.com
UNDER
CONSTRUCTION
Current Ticketing Lobby
www.flynashville.com
UNDER
CONSTRUCTION
Ticketing and Baggage Claim Expansion
RFP Date:
Construction Cost:
September 2017
$ 150,000,000
www.flynashville.com
Terminal Apron and Taxilane Expansion
UNDER
CONSTRUCTION
Terminal Apron and
Taxilane Expansion
Bid Date:
Construction Cost:
January 2018
$ 23,000,000
www.flynashville.com
What’s the
Price Tag?
Funding sources:
• No local tax dollars
• Bonds
• Federal AIP and state aviation grants
• Passenger Facility Charges (PFCs)
$1.2 Billion