PROJECT NAME CLIENT NAME PROJECT DESCRIPTION PROJECT COST YEAR
Construction of UF & RO Water Filtration Plants in
District Lodhran KSB
Excavation in foundation Cement Concrete plain Reinforced cement concrete in foundations, columns
and walls. Fabrication of mild steel reinforcement for cement
concrete Supply & filling sand under floor Providing, laying, cutting, jointing, testing UPVC pipe
line in trench Brickworks Supply & fixing of Steel grated Doors Supply & fixing of Steel grill Plaster of Walls & Columns Providing, fixing & jointing of Ceramic & Floor tiles Electrification of complete plant
59 Million 2015- To date
Supply, Installation, Testing & Commissioning of Power
Cables and Pipe
CNS Engineering (Emporium Mall
Project)
Supply, Installation, Testing & Commissioning of Power Cables of different sizes.
Supply, Installation & Testing of G.I Pipe of different sizes.
Supply & Installation of pipe fittings.
3 Million 2015- To date
Supply of Diesel Generator Sets and Diesel Hydro China Supply of 100 KVA Diesel Generator Sets
Supply of diesel at Wind project in Sindh 4.5 Million 2015- To date
Page 2 of 12
MEGA ENGINEERING & CONSTRUCTION COMPANY‐EXPERIENCE LIST Projects in Hand or Completed
Supply, Installation, Testing & Commissioning Of LED Street
Lights
Punjab University Employees
Housing Scheme (Phase-II)
Supply of LED Street Lights and Power cable Installation, testing & Commissioning of LED Street
Lights 1.7 Million 2015- To date
Supply of Substation Connectors & Transmission
Line Hardware LESCO Supply of 132KV Substation Connectors &
Transmission Line Hardware 5.3 Million 2015- To date
Supply of Transmission Line Hardware MEPCO Supply of 132 KV transmission line hardware & SF6
Gas 89 Million 2015- To date
Supply of Substation Connectors IESCO Supply of 132KV Substation Connectors & Cartridge 2.7 Million 2015- To date
Supply of Substation Connectors & Transmission
Line Hardware PESCO
Supply of 132KV Substation Connectors, Transmission line hardware, Cartridges & Control Cable.
6.2 Million 2015- To date
Supply of Termination Kits SEPCO Supply of 11 KV indoor & outdoor Termination kits. 3.9 Million 2015- To date
Supply of Substation Connectors & Transmission
Line Hardware SEPCO Supply of 132KV Substation Connectors,
Transmission line hardware and Cartridges. 7.4 Million 2015- To date
Supply of Diesel Generator Sets SEPCO Supply of 50 KVA & 5 KVA Diesel Generator Sets 2.8 Million 2015
Page 3 of 12
MEGA ENGINEERING & CONSTRUCTION COMPANY‐EXPERIENCE LIST Projects in Hand or Completed
Supply of SF6 Gas HESCO Supply of SF6 Gas 1.8 Million 2015
Ibrahim Fiber Faisalabad
Supply of 11 KV Steel Structure, Hardware & Aluminum Conductor.
Installation, Testing & Commissioning of 11 KV Transmission Lines (Total Length: 5 KM)
9.2 Million 2014-To date
Construction of Water Filtration Plants in Lahore KSB
Excavation in foundation Cement Concrete plain Reinforced cement concrete in foundations, columns
and walls. Fabrication of mild steel reinforcement for cement
concrete Supply & filling sand under floor Providing, laying, cutting, jointing, testing UPVC pipe
line in trench Brickworks Supply & fixing of Steel grated Doors Supply & fixing of Steel grill Plaster of Walls & Columns Providing, fixing & jointing of Ceramic & Floor tiles Electrification of complete plant
4.6 Million 2014- To Date
Construction of Lowari Tunnel situated in the Khyber-Pakhtunkhwa province
of Pakistan connecting Dir and Chitral Valley
Length: 8.75 km Diameter: 7.1 meters
SAMBU JV (South Korea)
Construction of Roads. Supply of complete Construction Material Supply of different Construction Machinery
115.4 Million 2009-To Date
Page 4 of 12
MEGA ENGINEERING & CONSTRUCTION COMPANY‐EXPERIENCE LIST Projects in Hand or Completed
Construction of Kabul-Kandahar highway
AFGHANISTAN
Rafique Construction
Company
Construction of Highway Supply of complete Construction Material Supply of different Construction Machinery
259.5 Million 2011- To Date
Design, Supply, Installation, Testing & Commissioning of Solar System for Tube Wells in Dera Ghazi Khan, Punjab.
Rasheed Farm House & Yousaf
Farm House
Supply, Installation, Testing and Commissioning of 40 HP Solar Submersible Pumps.
Supply, Installation, Testing and Commissioning of Solar Inverter.
Supply, Installation, Testing and Commissioning of Solar Modules.
7.2 Million 2014- To Date
External Electrification of Canal Garden Housing Society
Mohlanwal
Installation & Commissioning of 11 KV Transmission Line.
Installation & Commissioning of Switchgears, Transformers, Power Generators, Lightning system, Earthing System, Street Lights, etc
9.5 Million 2010-15
Mughal Steel Sheikhupura Road
Supply, Laying, Installation, Testing & Commissioning of Power Cables
Supply, Installation, Testing & Commissioning of Switchgears
Supply, Installation, Testing & Commissioning of material regarding 11 KV Transmission Lines
10.5 Million 2009-15
Air Force Officer Housing Society (AFOHS) (Falcon
Complex) Near Centre Point, Lahore.
PAF Supply, Installation and Commissioning of
Transmission Line including Installation, Testing & Commissioning of Transformers.
11.4 Million 2011-14
Page 5 of 12
MEGA ENGINEERING & CONSTRUCTION COMPANY‐EXPERIENCE LIST Projects in Hand or Completed
220 KV Wapda Town Grid Station Laying, Installation, Testing & Commissioning of
Power & Control Cables 3 Million 2013-14
132 KV Okara Grid Station Laying, Installation, Testing & Commissioning of
Power & Control Cables Installation & Commissioning of Termination Kits
5.7 Million 2014
132 KV Toba Tek Singh
Laying, Installation, Testing & Commissioning of Power & Control Cables
Installation & Commissioning of Termination Kits Installation, Testing & Commissioning of Control &
Relay Panels
9.8 Million 2014
MGM GT Road Faisalabad
Supply of 11 KV Steel Structure, Hardware & Aluminum Conductor.
Installation, Testing & Commissioning of 11 KV Transmission Line (Total Length: 7 KM)
11 Million 2013-14
Construction of Mazar-Khomri Highway AFGHANISTAN
Haji M. Noor Construction
Construction of Highway Supply of complete Construction Material Supply of different Construction Machinery
160 Million 2010-2014
Page 6 of 12
MEGA ENGINEERING & CONSTRUCTION COMPANY‐EXPERIENCE LIST Projects in Hand or Completed
Designing, Supply, Installation, Testing and
Commissioning of Switchgears and
Electrification of Different Halls
(Conform to IEC 60364 (Electrical Installation of Buildings) & IEC 61024 Protection of Structures
against Lightning))
DeSOM Services Club Lahore
(Supervised by Military
Engineering Services (MES))
Supply, Installation, Testing and Commissioning of Switchgears.
Supply, Installation, Testing and Commissioning of 4-Ton Cabinet (FMAC).
Supply, Installation, Testing and Commissioning of Power Cables of different sizes.
Supply, Installation, Testing and Commissioning Copper Strip for Lightning protection.
Designing of Electrification and Providing & Installation of complete electrical fixtures.
1.8 Million 2014
Supply & Installation of Various Electrical and
Mechanical Equipment and Fabrication works
Hyperstar Lahore
Supply and Installation of Switchgears. Fabrication of Cabinet and Staff Lockers.
2.3 Million 2014
Supply & Installation of 350 KVA Generator (Conform to
NFPA 110)
French Embassy Islamabad
Supply, Installation, Testing and Commissioning of 350 KVA Generator.
8.7 Million 2014
Designing, Supply, Installation, Testing and
Commissioning of Switchgears, Power Cables
and Electrification (Conform to IEC 60364 (Electrical Installation of Buildings) & IEC 60439-1
(Low voltage Switchgear and controlgear assemblies)
Intelligent Metering Systems
(Pvt) Ltd.
Supply, Installation, Testing and Commissioning of Switchgears.
Supply, Installation, Testing and Commissioning of Power Cables of different sizes.
Electrification and Installation of complete electrical fixtures.
1.9 Million 2014
Page 7 of 12
MEGA ENGINEERING & CONSTRUCTION COMPANY‐EXPERIENCE LIST Projects in Hand or Completed
Interloop GT Road Faisalabad
Supply, Installation, Testing & Commissioning of material regarding 7 KM 11 KV Transmission Lines
Supply, Laying, Installation, Testing & Commissioning of Power Cables
Supply, Installation, Testing & Commissioning of Switchgears
, Installation, Testing & Commissioning of 2 MVA Power Transformer
6 Million 2013-14
Supply & Installation of LT Panels and 200 KVA
Generator
Bar B.Q Tonight Lahore
Supply, Installation, Testing and Commissioning of LT Panels.
Supply, Installation, Testing and Commissioning of 200 KVA Generator.
5.6 Million 2013-14
Electrification, Supply and laying of Power Cables (Conform to IEC 60364 (Electrical Installation of Buildings) & IEC 60268
(Sound System Equipment))
Quality Switchgear Ferozpur Road,
Lahore.
Electrification and Electrical Fixtures installation of complete factory.
Supply, Laying and Testing of Power Cables. Supply and installation of CCTV. Supply and installation of Public Address System.
7 Million 2013-14
Preparation of Construction Claims and Drafting of letters
Harbin Electric International (HEI
China)
Preparation of EOT & Cost Claims for 560 MW Combined Cycle Power Plant, Bin Qasim, Karachi.
Preparation of EOT & Cost Claims for 747 MW Combined Cycle Power Plant, Guddu, Sindh.
9.5 Million 2012-14
Page 8 of 12
MEGA ENGINEERING & CONSTRUCTION COMPANY‐EXPERIENCE LIST Projects in Hand or Completed
Pakistan Medical Housing Society (PMHS), Sunder State,
Raiwind Road, Lahore.
Pakistan Medical Association (PMA)
(Supervised by LESCO)
Installation & commissioning of Underground Electrical Distribution System.
Installation & commissioning of RMUs, Switchgears, Transformers, Power Generators.
Installation & commissioning of Lightning system, Earthing System, Street Lights, etc
4.6 million 2011-13
Construction of Kandahar Airport AFGHANISTAN
Jannat Gull Company & Randi
Comapny
Construction of Runways Construction of Building Supply of Construction Material
415 Million 2010-13
Construction of Shurab Airport AFGHANISTAN
Eid Gull Construction
Company
Construction of Runways Construction of Building Supply of Construction Material Supply of different Construction Machinery
534 Million 2010-13
PEL Transformer Unit-02 PEL
Installation, Testing & Commissioning of Substation, Switchgears, Transformers, Power Generators.
Installation & Commissioning of Internal & External Electrification (Overhead & Underground Electrical Distribution System).
Installation & Commissioning of Electrical Wiring & Light Fixtures, Lightning system & Earthing System.
Installation & Commissioning of Public Address System & Fire Alarm System.
90.6 Million 2009-13
Supply of CTs LESCO Supply of 132KV CTs (Supplier Nanfang, China) 32 Million 2013
Page 9 of 12
MEGA ENGINEERING & CONSTRUCTION COMPANY‐EXPERIENCE LIST Projects in Hand or Completed
Supply of CTs FESCO Supply of 132KV CTs (Supplier Nanfang, China) 53 Million 2013
Supply of Distribution Transformer IESCO Supply of 100 & 200 KVA Distribution Transformer
(Supplier SEC China) 1.7 Million 2013
Designing, Installation, Testing & Commissioning of
132 KV Grid Station.
Gharibwal Cement Limited
Designing of complete 132 KV Grid Station. Installation of 132/66KV dual input, 46MVA Power
Transformer. Design and develop the connections diagrams /
terminations for all Grid equipment along with cable schedules, sizes and routing.
Design and develop Protection and control scheme design and diagrams.
Design calculation / setting calculations for relays as per WAPDA / IESCO requirement.
Setting of the relays at site and its testing. Review of design and calculations and incorporate /
address any comments received from Utility for approval.
102 Million 2013
500 KV Grid Station Yousaf Wala Sahiwal, 132 KV Diplpur Grid Station, 132 Sadiqqbad
Grid Station & 220 KV Daharki Grid Station
Installation, Testing & Commissioning of PLC Panels Termination of Control Cables
23 Million 2013
Page 10 of 12
MEGA ENGINEERING & CONSTRUCTION COMPANY‐EXPERIENCE LIST Projects in Hand or Completed
Pearl Continental Hotel
Muzaffar Abad A.J.K
P.S.L Providing & Installation of complete electrical fixtures, Lightning protection system and earthing.
78 Million 2012
Construction of Highway Logar-Kabul AFGHANISTAN
Engr. Mahmood Construction
Company
Construction of Highway Supply of complete Construction Material Supply of different Construction Machinery
213 Milion 2009-12
Sufi City Housing Scheme (SCHS), Mandi bahudin.
Malik Ali Amir (Supervised by
GEPCO)
Installation & Commissioning of 11 KV Transmission Line.
Installation, Testing & Commissioning of Switchgears, Transformers, Power Generators, Lightning system, Earthing System, Street Lights, etc
112 Million 2010-11
Al Rehman Garden Housing Schem (ARGHS) Near
Sharqpur Road, Sheikhupura.
Haji M. Ikhlaq (Supervised by
LESCO)
Installation & Commissioning of Transmission Line. Installation & Commissioning of Switchgears. Installation & Commissioning of Transformers &
Power Generators. Installation & Commissioning of Lightning system,
Earthing System & Street Lights, etc.
5.9 Million 2009-11
Page 11 of 12
MEGA ENGINEERING & CONSTRUCTION COMPANY‐EXPERIENCE LIST Projects in Hand or Completed
Army Welfare Trust Housing Scheme Raiwind Road,
Lahore. Army welfare Trust
Installation & Commissioning of Transmission Line. Installation & Commissioning of Switchgears,
Transformers, Power Generators. Installation & Commissioning of Lightning system,
Earthing System, Street Lights, etc in Sector # 01, 02 & 03.
3.4 Million 2002-11
Construction of Road from Pasni to Quetta, Balochistan,
Pakistan FWO
Construction of Road Supply of complete Construction Material Supply of different Construction Machinery
267 Million 2005-07
Construction of CRBC Canal at Taunsa, Punjab, Pakistan
Taxcer Turkish Company &
Ghulam Rasool and Company
(Pvt.) Ltd.
Excavation works and supply of crush etc. 202 Million 2001-07
Construction of Jalalabad-Torkham Highway
AFGHANISTAN FWO
Construction of Highway Supply of complete Construction Material Supply of different Construction Machinery
523 million 2003-06
Construction of Moro-Nosero feroz Road, Sindh, Pakistan
Hasnain Construction
Company
Construction of Road Supply of complete Construction Material
208 Million 2005
Construction of Renala Khurd Bypass, Punjab, Pakistan
Hasnain Construction
Company
Construction of Road Supply of complete Construction Material Supply of different Construction Machinery
113 Million 2004
Construction of National Highway from Okara to
Sahiwal, Punjab, Pakistan LAC Construction of Highway
Supply of complete Construction Material 189 Million 1998
Page 12 of 12
MEGA ENGINEERING & CONSTRUCTION COMPANY‐EXPERIENCE LIST Projects in Hand or Completed
Construction of Indus Highway from Karachi to Peshawar,
Pakistan China Petroleum Supply of complete Construction Material
Supply of different Construction Machinery 178 Million 1980-88