Post on 15-May-2020
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 1 of 16
MAHARASHTRA POLLUTION CONTROL BOARD
Minutes of 6thConsent Appraisal Committee Meeting of 2018-2019 (1st sitting) held on 28.11.2018 at 11.00 a.m. in the chamber of Hon’ble Chairman, 3rd Floor,
Maharashtra Pollution Control Board, Kalpataru Point, Sion, Mumbai, Maharashtra.
……….
Following members of the Consent Appraisal Committee were present:
1. Shri Sudhir Shrivastava, Chairman
Chairperson, MPCB, Mumbai.
2. Shri. P.P. Nandusekhar Member
Technical Advisor, MIDC
3. Shri. P. K. Mirashe Member Convener
Assistant Secretary (Technical), MPC Board, Mumbai
Following Officer of MPCB were present for the meeting:
1. Shri. A. S. Supate, Principal Scientific Officer, MPCB, Mumbai Special Invitee
2. Shri. V. M. Motghare, JD(APC), MPCB, Mumbai Special Invitee
3. Shri. Y. B. Sontakke, JD(WPC), MPCB, Mumbai Special Invitee
Additional Chief Secretary, Home (Transport) Dept., Mumbai could not attend the meeting. Leave of absence was granted to them.
Following Officer of MPCB were present for the meeting:
Chairperson of the committee welcomed the members of the committee and allowed proceeding of the meeting to start.
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 2 of 16
The meeting thereafter deliberated on the fresh agenda items (Booklet No. 11) placed before the committee and following decisions were taken:
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
Booklet No. 11
Consent to Operate/Renewal 1 MPCB-
CONSENT-
0000011461
Wadhwa Residency
Pvt. Ltd., Tower A
Wing 1, 2 & Tower C
of Village Vikhroli, at
L.B.S. Road,
Ghatkopar (W),
Mumbai.
APPROVED
1st Operate to
Operate (part-III)
Up to
30.11.2020
It was decided to grant Consent to 1st Operate (part) for
residential buildings of Tower A Wing 1, 2 & Tower C on
total plot area 71,804.30 sq.mtrs. for construction BUA of
60,302.79 sq.mtrs. out of Total BUA of 4,38,849.32 sq.m.
as per amended EC dtd. 11/12/2015 by imposing the
following condition(s);
1. PP shall submit undertaking in Board’s prescribed
format within 15 days towards compliance of conditions
of Environmental Clearance (EC) and Consent to
Establish conditions.
2. PP shall submit the undertaking within 15 days in the
prescribed format towards the part of the built up area/
building for which application for 1st Consent to
Operate (Part) is made and that the same is included in
the Environmental Clearance accorded.
3. PP shall achieve the treated domestic effluent standard
for the parameter BOD- 10 mg/lit.
4. The treated effluent shall be 60% recycled for secondary
purposes such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and remaining
shall be utilized on land for gardening.
5. PP shall submit BG of Rs. 25 Lakhs towards O&M of
pollution control system and compliance of consent
conditions.
6. PP shall operate organic waste digester along with composting facility and compost obtained shall be used as manure in their own garden/ plantation.
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 3 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
7. PP will be responsible for proper operation &
maintenance of pollution control systems for initial
period of five years after Society formation and
afterward handover the facility to the Society for its
further operation in good and working conditions.
8. This consent is issued subject to the order passed or as
may be passed by the Hon’ble Supreme Court of India
in special leave petition (Civil No. D23708/2017).
Consent shall be issued after:
a) Obtaining Architect Certificate towards completion of
construction of BUA for which they have applied for 1st
Consent to Operate (Part-III).
b) Obtaining verification report of SRO towards
installation of online monitoring system for the
parameters flow, BOD, TSS at the outlet of STP and its
connectivity to the MPCB Server.
Consent shall be issued after obtaining additional Consent
fees, if any.
2 MPCB-
CONSENT-
0000019504
Godrej & Boyce Mfg.
Co. Ltd., Vikhroli,
APPROVED
Amendment in
consent to
operate for
increased
production
quantity and
addition of one
new product
Up to
30.04.2020
Committee noted that personal hearing was extended to the
PP on 26.07.2018. Industry submitted that,
1. Increase in production quantity by capacity utilization
of existing unit and there will not be increase in water
consumption, effluent generation.
2. Industry has provided separate primary treatment for
Cyanide (Alkaline bleach) and Chrome (using ferrous
sulphate) treatment system further treated in common
effluent treatment system having capacity 1200 CMD
for treatment of effluent generated from all the
manufacturing processes.
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 4 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
3. Industry has provided scrubber, dust collector, water
curtains, bag filters, cyclones as an air pollution control
system.
4. Industry has provided 03 Nos. of STP of capacity - 750
CMD, 550 CMD and 900 CMD for the treatment of
sewage generated from industrial area, residential area
and hospital respectively.
Committee also noted that industry has provided adequate
capacity of effluent and sewage treatment plant.
In view of above, it was decided to grant amendment in the
existing Consent to Operate for increased production
quantity of 6 existing consented products and addition of
one new product of programmable Logic Controller
retrofitting and assembly.
Consent shall be issued after obtaining additional Consent
fees, if any.
3
MPCB-
CONSENT-
0000024529
SRJ PEETY STEELS
Private Limited, Plot
No. D-51/1,D-51/2, D-
50/1, D-52/1, E-8/9
and E-8/10, Additional
MIDC, Jalna
APPROVED
1st consent to
operate for
expansion with
Renewal of
existing consent
and their
amalgamation
Up to
31.05.2022
Committee noted that as per earlier decision , hearing was
extended to the industry before JD(APC) and AS(T) on
dated 26.07.2018. In this hearing it was decided to
recommend the case for 1st consent to operate with renewal
as the installed fume extraction system by industry seems
to be adequate.
In view of above it was decided to grant Consent to 1st
Operate for expansion to manufacture MS Ingots/ Billets-
20,520 MT/M (684 MT/D) and MS round and Twisted
Bars-15,000 MT/M (500 MT/D) by amalgamation with
existing consent by imposing the following conditions;
1. SRO shall assess the performance of the fume extraction
system by carrying out stack and ambient air quality
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 5 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
monitoring twice in a week for next three month and
submit the report to CAC cell.
2. Industry shall extend existing BGs towards O&M of
pollution control systems and towards compliance of
the Consent conditions.
Consent shall be issued after obtaining additional Consent
fees, if any.
4 MPCB-
CONSENT-
0000026074
Ajanta Enterprises,
Kharadi, Pune.
APPROVED
Consent to 1st
Operate
Up to
30/06/2020
It was decided to grant of Consent to 1st Operate for
residential construction project 'Forest Country' with C.I. of
Rs. 295.3 Crs. on total plot area 69,955.27 sq.m. for total
construction BUA 1,47,698.84 sq.m. by imposing the
following condition(s);
1. PP shall submit undertaking in Board’s prescribed
format within 15 days towards compliance of conditions
of Environmental Clearance (EC) and Consent to
Establish conditions.
2. PP shall submit the undertaking within 15 days in the
prescribed format towards the part of the built up area/
building for which application for 1st Consent to
Operate (Part) is made and that the same is included in
the Environmental Clearance accorded.
3. PP shall achieve the treated domestic effluent standard
for the parameter BOD- 10 mg/lit.
4. The treated effluent shall be 60% recycled for secondary
purposes such as toilet flushing, air conditioning,
cooling tower make up, firefighting etc. and remaining
shall be utilized on land for gardening.
5. PP shall submit BG of Rs. 25 Lakhs towards O&M of
pollution control system and compliance of consent
conditions.
6. PP shall operate organic waste digester along with composting facility and compost obtained shall be used as manure in their own garden/ plantation.
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 6 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
7. PP will be responsible for proper operation &
maintenance of pollution control systems for initial
period of five years after Society formation and
afterward handover the facility to the Society for its
further operation in good and working conditions.
8. This consent is issued subject to the order passed or as
may be passed by the Hon’ble Supreme Court of India
in special leave petition (Civil No. D23708/2017).
Consent shall be issued after:
a) Obtaining Architect Certificate towards completion of
construction of BUA for which they have applied for 1st
Consent to Operate.
b) Obtaining verification report of SRO towards
installation of online monitoring system for the
parameters flow, BOD, TSS at the outlet of STP and its
connectivity to the MPCB Server.
Consent shall be issued after obtaining additional Consent
fees, if any. 5 MPCB-
CONSENT-
0000027470
Valvoline Cummins
Private Limited,
Additional Ambernath
Industrial Area,
Anandnagar, Dist.
Thane
APPROVED
Consent to 1st
Operate
Up to
31/08/2020
Committee noted that for proposed expansion to
manufacture Aqueous Urea Solution (AUS 32). To reduce
TDS of raw water from TDS 200 mg/l to 15 mg/l, RO Plants
(3 nos.) is used and filtered/ clear water will be used for
mixing & blending with Technical Grade Urea for mfg. of
final product AUS 32 which will be used in Vehicles as
Diesel Exhaust Fluid (DEF). RO reject will be sent to Waste
Heat Evaporator and after evaporation filtrate is sent to
crystallizer unit and Salts generated will be disposed off at
CHWTSDF. Thus, there will be no generation of industrial
effluent and 100% Zero Liquid Discharge will be achieved.
As reported, ROs & WHE are established and ready for
commission.
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 7 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
In view of above, it was decided to grant Consent to 1st
Operate for proposed expansion to manufacture Aqueous
Urea Solution (AUS 32) and amalgamation with existing
Consent to Operate by imposing the following conditions;
1. Industry shall operate ETP and 100% recycle/ reuse
treated trade effluent so as to achieve ZLD from
proposed expansion.
2. Industry shall extend existing BGs towards O&M of
pollution control systems and towards compliance of the
Consent conditions.
Consent shall be issued after obtaining additional Consent
fees, if any.
6 MPCB-
CONSENT-
0000027894
Frigorifico Allana
Private Limited,
Khopoli, Dist. Raigad.
Approved in CAC meeting held on 06.11.2018.
7 MPCB-
CONSENT-
0000028759
Malu Paper Mills Ltd.
(Unit- III), Saoner
Industrial Area, MIDC,
Village – Hetisurla, Tal.
Saoner, Dist. Nagpur.
Approved in CAC meeting held on 06.11.2018.
8 MPCB-
CONSENT-
0000033089
Lavino Kapur Cottons
Pvt. Ltd., MIDC
Tarapur, Dist. Palghar.
APPROVED
Renewal of
Consent to
Operate
Up to
30.11.2023
Committee noted that in respect to SCN dtd. 12.09.2018,
industry has submitted reply vide letter dated 19.09.2018
stating that-
1. There is no change in the production qty. Earlier CI of
industry was 124.25 Crs. Now they have applied for
renewal with CI Rs.121.04 Crs.
2. They are having hydrogen peroxide bleaching process.
They have upgraded existing ETP by providing sand
and carbon filters. Also they have plugged and
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 8 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
disconnected permanently by pass arrangement. The
ETP is operated at all times.
3. They have submitted BG of Rs.5.0 Lakhs on
29.06.2017.
4. Installation work of online flow meter, pH meter and
linkage to CETP has been implemented in Feb’2017
and BOD and COD on line meter will be implemented
within 60 days.
5.
In view of above, it was decided to grant renewal of
Consent to Operate by imposing the following conditions;
1. Industry shall make provision of STP within 3 months
and furnish BG of Rs.5.0 Lakh towards compliance of
this condition within 15 days.
2. Industry shall make provision of online CMS for COD
and BOD parameters within 2 months and furnish BG
of Rs.5.0 Lakh towards compliance of this condition
within 15 days.
3. B.G. of Rs.5.0 Lakh is forfeited and industry shall
submit top up B.G. with double the amount i.e. BG of
Rs. 10 Lakh towards O & M and compliances of consent
and restart direction conditions.
4. Industry shall comply the restart direction issued by the
Board vide letter dated 24.08.2018.
Consent shall be issued after obtaining additional Consent
fees, if any.
9
MPCB-
CONSENT-
0000036779
Chalet Hotels Private
Limited, Plot No. 39/1,
39/6 to 39/15, Sector-
30 A, Vashi, Navi
Mumbai- 400701
NOT APPROVED
Renewal of
consent for Hotel
activity
-- Committee noted that PP had submitted application for
renewal of Consent to Operate for Hotel activity including
Lodging & Boarding activity swimming Pool & food items
– having 85 rooms, 8 suites & 29 apartments.
Committee also noted that Hotel is located in the premises
of M/s. Inorbit Malls (India) Ltd., Vashi and PIL No. 131
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 9 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
of 2003 filed in the Hon’ble High Court of Judicature at
Bombay.
Also, Hon’ble Supreme Court of India w.r.t. Petitions for
Special Leave Appeal (C) Nos. 698-699/2015 filed by K.
Raheja Corp. Pvt. Ltd.
Further Committee noted that Law Officer has given
opinion that at the present the MPCB is nowhere party to
the proceedings neither at the High Court nor at the Hon'ble
Supreme Court by virtue of the powers conferred under
Water (Prevention & Control of Pollution) Act, 1974 and
Air (Prevention and Control of Pollution) Act, 1981, it is
mandatory to obtained consent of MPCB for functioning of
the Chalet hotels.
In view of above, it was decided to defer the case and call
PP for presentation along with latest updated status of SLP
in Hon’ble Supreme Court.
10
MPCB-
CONSENT-
0000037169
Nisarg Nirman
Developers, B- Cabin
Road, Nr Navre Nagar
Ambernath (E), Dist.
Thane.
NOT APPROVED
1st Consent to
Operate(Part-I)
-- Committee noted that PP has not obtained Consent to
Operate from Board for RMC Plant.
Committee also noted that PP has given possession of 40
nos. flats without obtaining Consent to Operate from Board
and further possession is in progress.
Further Committee noted that PP has not submitted details
of sewage generation, STP flow diagram and operation of
STP. Non-provision of OWC for treatment of wet garbage
etc.
It was decided to defer the case and call PP for presentation
along with explanation for above lapses.
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 10 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
11 MPCB-
CONSENT-
0000040067
Loma IT Park
Developers Pvt. Ltd.,
TTC Industrial Area,
Navi-Mumbai.
APPROVED
Renewal of
Consent to
Operate (Part)
Up to
31.12.2021
It was decided to grant renewal of Consent to Operate (Part-
I) for IT Park on total plot area 1,21,405 Sq. Mtrs. and
construction BUA 23,028.27 Sq. Mtrs. out of total
construction BUA 1,47,427.21 Sq. Mtrs. by imposing the
following conditions;
1. PP shall extend existing the BG of Rs. 10 lakh towards
O&M of pollution control system.
2. PP shall achieve the treated domestic effluent standard
for the parameter BOD- 10 mg/lit.
3. The treated domestic effluent shall be 60% recycled for
secondary purposes such as toilet, flushing, air
conditioning, cooling tower make up, fire-fighting etc.
and remaining shall be utilized on land for gardening and
connected to the sewerage system provided by local
body.
4. PP shall install online CMS for parameters Flow, BOD
& TSS at the outlet of STP and connect online
monitoring data to MPCB Server within 3 months.
5. PP shall operate organic waste digester along with composting facility and compost obtained shall be used as manure in their own garden/ plantation.
12 MPCB-
CONSENT-
0000040280
Western Coalfields
Limited, Kolar Pimpri,
Village Aheri Open
Cast Mine,
Chandrapur.
NOT APPROVED
Renewal of
consent to operate
with increase in CI
--
Committee noted that industry has applied for grant of
renewal of Consent to Operate for the same products and
capacity with increase in Capital investment by Rs. 93.68
Crs due to land acquisition & inclusion of Mine closure
cost.
Committee also noted that industry has not provided STP
for the treatment of domestic effluent 100 CMD, non-
provision of rain guns at Railway siding & non-provision of
water sprinkles at coal storage and road.
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 11 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
Further Committee noted that industry has not submitted
BG as per Consent condition No. 11, not provided CAAQM
Station, not provided Coal washery.
It was decided to defer the case and call the PP for
presentation along with explanation for above lapses.
13 MPCB-
CONSENT-
0000041616
Balkrishna Industries
Ltd., MIDC Waluj,
Aurangabad.
APPROVED
Renewal of
Consent with
increase in CI
Up to
31.03.2023
Committee noted that PP has provided ETP and treated
effluent is 100% recycled into process. Also, noted that, PP
has provided STP for the treatment of 70 CMD sewage.
Also provided required APCS to the Boiler.
In view of above, it was decided to grant renewal of
Consent to Operate with increase in C.I. by imposing the
following conditions;
1. BG of Rs. 1 Lakh is forfeited due to exceeding stack
result TPM-181 mg/Nm3 dtd. 04.10.2017 and obtain
top-up BG of Rs. 2 Lakh towards compliance of the
same.
2. The industry shall carry out study towards adequacy of
APC with respect to TPM and SO2 emission and a
suitable action plan for improvement shall be submitted
within six months"
14 MPCB-
CONSENT-
0000043712
ADM Agro Industries
Latur & Vizag Pvt.
Ltd.
15 MPCB-
CONSENT-
0000043695
Oaisis Alcohol Ltd.,
Adrishya Kadsidha
Nagar, A/P. -
Pangarkhel
APPROVED
Renewal of
Consent to
Operate
Up to
31.10.2019
Committee noted that industry was not in operation since
10/06/2015 due to certain modification & up-gradation of
plant and machinery. Also, noted that industry has provided
feed tank, multi effect evaporator (MEE), Incineration
boiler for the treatment & disposal of spent wash.
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 12 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
Further Committee noted that industry has provided
modified Mechanical Dust Collector and bag filter to Coal
fired boiler & spent wash incinerator.
In view of above, it was decided to grant renewal of
Consent to Operate for distillery unit of 45 KLPD by
imposing the following conditions;
1. Industry shall submit Bank Guarantee of Rs. 5 lakh
towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after receipt of verification report
from SRO regarding operational status of pollution control
equipments.
16 MPCB-
CONSENT-
0000044134
Nowrosjee Wadia
Maternity Hospital,
Acharya Donde Marg,
Parel, Mumbai-400 012.
APPROVED
Renewal of
Combined
Consent & BMW
Authorization
Up to
30.11.2019
Committee noted that the hospital authority has submitted
application for grant of renewal of combined Consent to
Operate and BMW Authorization.
Committee also noted that the hospital authority has
provided STP which is not in operation and not provided
ETP for the treatment of Laundry effluent.
Further Committee noted that the authority has submitted
letter dated 20.04.2018 stating that the hospital building
comes under Heritage structure and as per the DCR 67
(Heritage Regulations) they are not supposed to make any
changes in the structure or build any new structure in the
premises without obtaining NOC from Municipal
Corporation of Greater Mumbai and Heritage Committee.
Also submitted structural stability Certificate which shows
non feasibility of STP and ETP plant in the premises.
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 13 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
In view of above, it was decided to grant renewal of renewal
of combined Consent to Operate and BMW Authorization
for one year by imposing the following conditions;
1. The matter may be referred to Heritage Committee for
exploring the possibility of making provision for ETP for
the treatment of Laundry effluent.
2. The hospital authority shall operate STP so as to achieve
standards for parameter BOD 10 mg/l.
3. The hospital authority shall furnish BG of Rs. 10 Lakh
towards compliance of the Consent conditions.
17 MPCB-
CONSENT-
0000045415
Jotun India Pvt Ltd,
MIDC Ranjangoan,
Tal. Shirur, Dist. Pune.
APPROVED
Renewal of
Consent to
Operate with
increase in C.I.
Up to
31.03.2021
It was decided to grant renewal of Consent for mfg. of
Marine paints – 8 milion Liters/A, Protective paints – 12
Milion Litters/A, Decorative paints – 26 Milion Liters/A,
and Coating Powder – 12,000 MT/M with increase in C.I.
by Rs. 30.18 Crs on account of infrastructure development
and facility improvement by imposing the following
conditions;
1. Industry shall monitor VOC emissions monthly from
Approved Labs and submit the monitoring report.
2. Industry shall extend existing BG of Rs. 5 Lakh towards
O&M of STP and compliance of the Consent conditions.
Also, it was decided to refer the case to the Board's
Categorization Committee to decide the category of the
industry.
18 MPCB-
CONSENT-
0000046105
Jai Bhavani S S K,
158, 159, 161, 179,
Shivaji Nagar, Tal.
Georai, Jalna,
Aurangabad.
NOT APPROVED
Renewal of
Consent to Operate
-- Committee noted that industry has applied for grant of
Consent to Establish for expansion to manufacture product
Ethanol - 30,000 KL/D.
Committee also noted that the industry is not in operation
since last three years, provided Re-boiler followed by Bio-
Composting for the treatment of spent wash, provided 30
days coal spent wash storage lagoon of capacity 7,200 m3
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 14 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
& two nos. of one day storage tank and not submitted BG
of Rs. 5.0 Lakhs towards O & M.
In view of above, it was decided to defer the case and call
the PP for presentation along with operational status of ETP
& APCS.
19 MPCB-
CONSENT-
0000047092
Valsad District Co-
Operative Milk
Producers' Union Ltd.
(Vasudhara Dairy),
MIDC Tarapur, Dist.
Palghar.
APPROVED
Renewal of
Consent to
Operate with
increase in C.I.
Up to
30.04.2021
It was decided to grant renewal of Consent to Operate for
mfg. of dairy products with increase in C.I. by Rs. 33.11
Crs due to increase in land cost, up-gradation of plant,
machinery and ETP by imposing the following conditions;
1. Industry shall submit BG of Rs. 5 Lakh towards O & M
of pollution control systems.
Consent shall be issued after obtaining additional Consent
fees, if any.
20 MPCB-
CONSENT-
0000048133
Jaya Hind Industries
Ltd., Gat No. 350 &
Others, Urse, Tal.
Maval, Dist. Pune 410
506.
NOT APPROVED
Renewal of
Consent to Operate
with increase in CI
-- Committee noted that industry has applied for grant of
renewal of Consent to Operate with increase in C.I. by Rs.
101.18 Crs.
Committee also noted that-
1. Industry has increased C.I. by Rs. 101.18 Crs. and
installed one additional melting furnace of capacity 2
TPH without obtaining Consent to Establish from the
Board.
2. The JVS results of ETP outlet dtd. 18.01.2017 &
29.05.2017 exceeds the Consented standards.
3. Industry is receiving 70 CMD sewage of M/s Jay Hind
Mountopet Pvt. Ltd., Gat No.-351, Urse, Tal. Maval,
Dist. Pune for treatment in their STP without Board's
permission.
In view of above, it was decided to defer the case and call
the PP for presentation along with explanation for above
non-compliances.
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 15 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
1 MPCB-
CONSENT-
0000052119
Bridge Data Centres
(Mumbai) LLP, Plot
No. 13, Kalwa
Industrial Area, TTC
MIDC, Digha, Thane-
Belapur Road, Navi-
Mumbai-400 708.
APPROVED
Consent to
Establish
Up to
Commissioni
ng of unit or
5 years
whichever is
earlier
It was decided to grant Consent to Establish for construction
of IT & ITES Park on total plot area 16,240 sq.mtrs. for
total construction BUA 40,179.91 sq.mtrs. by imposing the
following conditions;
1. PP shall not take effective steps without obtaining EC
from the Competent Authority.
2. PP shall provide STP of adequate capacity for the
treatment of domestic effluent so as to achieve BOD
standards 10 mg/l.
3. The treated effluent shall be 60% recycled for secondary
purposes such as toilet flushing, air conditioning, cooling
tower make up, fire-fighting etc. and remaining shall be
utilized on land for gardening into process, cooling
tower and treated domestic effluent shall be applied on
land for gardening within premise.
4. The applicant shall provide online CMS for parameters
Flow, TSS & BOD at the outlet of STP and connect to
MPCB Server.
5. PP shall install organic waste digester along with
composting facility/ bio-digester (biogas) with
composting facility for the treatment of wet garbage.
6. Industry shall submit BG of Rs. 25 Lakh towards
compliance of the Consent conditions.
2 MPCB-
CONSENT-
0000057866
Carrier Midea India
Pvt. Ltd., Plot No. 5,
Supa-Parner Industrial
Park, Near Mhasane
Phata, Parner,
Ahmednagar
APPROVED
Consent to
Establish
Up to
Commissioni
ng of unit or
5 years
whichever is
earlier
It was decided to grant Consent to Establish for mfg. of air
conditioners by imposing the following conditions;
1. The industry shall provide ETP & STP of adequate
capacity for the treatment of industrial & domestic
effluent respectively.
2. Treated trade effluent shall be 100% recycled/ reused
into process, cooling tower. Treated domestic effluent
shall be 60% recycled for secondary purposes such as
toilet flushing, air conditioning, cooling tower make up,
6th CAC meeting of 2018-19 (Booklet No. 11 of Consent to Operate/ Renewal) dtd. 28.11.2018 Page 16 of 16
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
fire-fighting etc. and remaining shall be utilized on land
for gardening.
3. The applicant shall provide online CMS for parameters
Flow, TSS & BOD at the outlet of STP and connect to
MPCB Server.
4. Industry shall submit BG of Rs. 5 Lakh towards
compliance of the Consent conditions.
--------0000---------