DECISION OF 3667 th HELD ON 29 JULY 2015 COUNCIL MEETING 232. CLS03: Public Art Trail - Development Consent Granted Report of Martin Ellis, Director, Community and Library Services The North Sydney Public Art Trail received Development Consent on 3 July 2015. This is the basis of not only the 20 sites that make up the walk but the 7 proposed new sculptures. Constructions certificates will be required for each work as Council progresses this project. There is now a delay over implementing Site 16 (the Former First Methodist site) and it is recommended that sufficient funds be brought forward from 2016/17 to commence Site 8 Victoria Cross Forecourt. Sufficient funds are available in the adopted Delivery Plan for Arts projects to complete Site 8 and Site 16 within the same year, if Council so resolves and site constraints for the latter are resolved. Funding for the project is appropriate Recommending: 1. THAT $100,000 is brought forward from 2016/17 to allow a second site (Site 18) to proceed in 2015/16. The Motion was moved by Councillor Reymond and seconded by Councillor Baker. Voting was as follows: For/Against 10/0 Councillor Yes No Councillor Yes No Gibson Y Beregi Y Reymond Y Barbour Y Clare Y Morris Y Baker Y Marchandeau Y Carr Y Bevan Y Note: CLS02 and CLS03 (Minute Nos. 230 to 231) were voted on “en globo”)

Transcript of CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range...

Page 1: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

DECISION OF 3667th

HELD ON 29 JULY 2015 COUNCIL MEETING

232. CLS03: Public Art Trail - Development Consent Granted Report of Martin Ellis, Director, Community and Library Services The North Sydney Public Art Trail received Development Consent on 3 July 2015. This is the basis of not only the 20 sites that make up the walk but the 7 proposed new sculptures. Constructions certificates will be required for each work as Council progresses this project. There is now a delay over implementing Site 16 (the Former First Methodist site) and it is recommended that sufficient funds be brought forward from 2016/17 to commence Site 8 Victoria Cross Forecourt. Sufficient funds are available in the adopted Delivery Plan for Arts projects to complete Site 8 and Site 16 within the same year, if Council so resolves and site constraints for the latter are resolved. Funding for the project is appropriate Recommending: 1. THAT $100,000 is brought forward from 2016/17 to allow a second site (Site 18) to proceed in 2015/16.

The Motion was moved by Councillor Reymond and seconded by Councillor Baker. Voting was as follows: For/Against 10/0

Councillor Yes No Councillor Yes No Gibson Y Beregi Y Reymond Y Barbour Y Clare Y Morris Y Baker Y Marchandeau Y Carr Y Bevan Y

Note: CLS02 and CLS03 (Minute Nos. 230 to 231) were voted on “en globo”)

Page 2: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

  ITEM CLS03 REPORTS 20/07/15  

N O R T H S Y D N E Y C O U N C I L R E P O R T S

 

I:\# Governance Section\Council Meetings\Word Council\2015\3667_150720\CLS03 Public art Trail - Development Consent Granted.docx

Report to General Manager Attachments:

1. North Sydney Public Art Trail July 2015 SUBJECT: Public Art Trail - Development Consent Granted AUTHOR: Martin Ellis, Director, Community and Library Services ENDORSED BY: Warwick Winn, General Manager EXECUTIVE SUMMARY: The North Sydney Public Art Trail received Development Consent on 3 July 2015. This is the basis of not only the 20 sites that make up the walk but the 7 proposed new sculptures. Constructions certificates will be required for each work as Council progresses this project. There is now a delay over implementing Site 16 (the Former First Methodist site) and it is recommended that sufficient funds be brought forward from 2016/17 to commence Site 8 Victoria Cross Forecourt. FINANCIAL IMPLICATIONS: Sufficient funds are available in the adopted Delivery Plan for Arts projects to complete Site 8 and Site 16 within the same year, if Council so resolves and site constraints for the latter are resolved. Comment by Responsible Accounting Officer: Funding for the project is appropriate RECOMMENDATION: 1. THAT $100,000 is brought forward from 2016/17 to allow a second site (Site 18) to proceed in 2015/16

Page 3: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

Report of Martin Ellis, Director, Community and Library Services Re: Public Art Trail - Development Consent Granted

(2)

I:\# Governance Section\Council Meetings\Word Council\2015\3667_150720\CLS03 Public art Trail - Development Consent Granted.docx

LINK TO DELIVERY PROGRAM The relationship with the Delivery Program is as follows: Direction: 4. Our Social Vitality Outcome: 4.3 Enhanced arts and cultural programs and facilities BACKGROUND Following a report in September 2014 and Councillor briefings in October 2014 and March 2015 a Development Application was submitted under advice from Council’s Planning Advisor. CONSULTATION REQUIREMENTS Community engagement will be undertaken in accordance with Council’s Community Engagement Protocol. SUSTAINABILITY STATEMENT The following table provides a summary of the key sustainability implications: QBL Pillar Implications Environment The Development Application process will apply strict guidelines in this areaSocial Council’s Public Art Policy gives guidance on engaging with the community Economic Council’s current Delivery Plan covers sufficient funding for 3 of the

proposed seven sculptures Governance Council’s tender process has demonstrated its robustness in developing the

contract documents and selection procedures DETAIL Owners’ consent had been received from all sites that are private property, excepting only one the three properties facing Wheeler Lane (Site 11). Consent was granted on 3 July 2015. A procedure for commissioning the works has been established and Council’s first project is now completed up to the concept approval stage, following a Council briefing on 2 June 2015 which supported the evaluation committee’s selection. Site 8 Victoria Cross Forecourt (intersection of Miller and Mount Streets) This site was previously identified in the North Sydney Centre Urban Design Project by McGregor and partners in 2005. The Art Trail report costs this project in the range $180,000 to $250,000 and recommends the EOI be open to Australian and International Artists.

Page 4: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

Report of Martin Ellis, Director, Community and Library Services Re: Public Art Trail - Development Consent Granted

(3)

I:\# Governance Section\Council Meetings\Word Council\2015\3667_150720\CLS03 Public art Trail - Development Consent Granted.docx

Funds available 2015/16 2016/17 Public Art Trail $150,000 $150,000 Art Trail App $6,000 Primrose Park Arts Complex

$30,000 $230,000

Page 5: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

NORTH SYDNEY Public ART TRAil

Final Report - July 2015

ATTACHMENT TO CLS03 - 20/07/15 Page 4

Page 6: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

Creative Road Art Projects Pty LtdABN: 88 169 519 402

Contact:

Rebecca [email protected] 087 443

www.creativeroad.com.au

ATTACHMENT TO CLS03 - 20/07/15 Page 5

Page 7: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

PART ONE: REVIEW

Background 5

Approach 6

Methodology 7

SWOT Analysis 8

Proposed Trail Map 9

PART TWO:TRAIL SITES

Sites #1 - 20 11

PART THREE:RECOMMENDATIONS

Summary 41

Key Elements 42

Creative Themes 43

Proposed Artworks 45

PART FOUR:IMPLEMENTATION

Project Staging 49

Accessibility 49

Proposed Artwork Budget 50

Trail Signage 51

Digital Engagement 52

PART FIVE:APPENDIX

cONTENTS

ATTACHMENT TO CLS03 - 20/07/15 Page 6

Page 8: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

REviEw

PART ONE

ATTACHMENT TO CLS03 - 20/07/15 Page 7

Page 9: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 5

The North Sydney Public Art Trail (NSPAT) has been initiated by North Sydney Council (NSC) as part of their vision to shape a progressive, vibrant and diverse North Sydney community.

NSC is currently revising its Public Art Guide publication (2012) which includes both Council-created public art and privately commissioned artwork. In 2012 Council renamed Mount Street Plaza, Brett Whiteley Place and a new design is being developed for this central urban space. Council intends that public art will be central to the newly developed plaza.

The NSPAT is intended to be a subset of the public art experience throughout the LGA, as a more intense experience, achieved in a comfortable walk with opportunities for rest and refreshment. A draft trail map with 14 locations was originally proposed by NSC with the understanding that the project had significant gaps and required a professional review and recommendations.

Creative Road Art Projects was engaged to offer expertise in reviewing the NSPAT, recognising the different integrated layers and requirements of the project; heritage interpretation, placemaking, wayfinding, cultural development, cultural tourism and economic development.

North Sydney:

Progressive, vibrant, Diverse

The North Sydney Local Government Area is located on the northern side of Sydney Harbour, it is both urban and green in character, comprising two Central Business Districts, smaller suburban centres, residential areas, parks and open spaces as well as harbour frontage.

The North Sydney Centre, the location for the NSPAT, is Sydney’s second largest central business district, home to a diverse range of commercial activities, including service, property, communications and financial organisations. It is also home to a rapidly expanding residential population.

Forecasts predict that by 2016 there will be over 70,000 people living in the North Sydney local government area, including over 7,000 residents in the CBD. In addition, there are over 17,000 students and 66,000 workers in the local area. These figures will be boosted by the arrival of approximately 3,000 workers at 177 Pacific Highway, which is scheduled for completion in 2016. People of all ages are attracted to North Sydney for its stunning harbour setting, its proximity to employment and entertainment options and its variety of open spaces, all of which are accessible via a comprehensive public transport system of trains, buses and ferries.

Policy Framework

Relevant statutory and planning requirements to this engagement are:

• North Sydney Planning Controls: Development Control Plan 2002 (DCP 2002)

• Relevant accessibility standards

• Relevant Australian Building and Construction Standards

• North Sydney Public Domain Manual

• North Sydney Centre - Public Domain Strategy

• North Sydney Public Art Policy

Public Art Policy context

NSC’s Public Art Policy aims to foster the creation of high quality public art in North Sydney, ensuring a commitment to excellence, innovation and diversity, enhancing and enriching the visual appearance, sense of civic identity and liveability of North Sydney and its environs. It is designed to promote, emphasise and complement the desirable aspects, intrinsically unique qualities and ambient sense of place of North Sydney’s public spaces. The policy encourages the inclusion of art and artists as a valuable and implicit part of North Sydney’s civic planning, design and development processes, and those of its commercial and business sector.

NSC have commissioned a number of public art projects in the past and they form the basis for a continuing but more sophisticated approach to developing public art for the CBD.

Public art, not why, but how: the changing context of public support

Local government is at the forefront of public art in Australia and has been so for two decades. Understandably, its practice has developed and matured over that time, where now some of the most impressive public art is commissioned by local councils.

Most local councils now have public art policies and public art is recognized as a critical placemaking tool in urban design. No longer confined to a simplistic social development and community arts agenda, public art has rightfully become recognized for its significant contribution in areas such as urban design, tourism, heritage and in economic development.

This is in line with a sweeping change of attitude across Australia towards the importance of high quality public art. It sits firmly within arts and cultural policy frameworks at all levels of government.

Objectives

This report aims to provide the first step towards a high quality public art trail for North Sydney, one which is distinct from other places in Australia and which celebrates the diversity and uniqueness of the locality.

Key objectives for the trail include:

1. The creation of a nationally recognised cultural attraction

2. A multi-layered trail experience - incorporating art, architecture, gardens and views

3. Activation of Milsons Point Foreshore, Brett Whiteley Place and the Education Precinct

bAcKGROuND

ATTACHMENT TO CLS03 - 20/07/15 Page 8

Page 10: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 6

Informed by research and consultation this report reviews existing trail elements and provides a rationale for additional elements for the project’s future development. It recommends a range of initiatives, with a focus on strategies which are practical and achievable within a 5 year period.

The review has been guided by:

1. Cultural tourism objectives;

2. Prioritising and revitalising the CBD’s urban spaces;

3. A requirement for permanent and temporary public art;

4. A need to visually link all elements of the trail; and

5. Successful public art trail benchmarks

Our approach in reviewing the NSPAT is best described by the application of the following principles:

innovative

A successful art trail is really a place making strategy that excites and inspires people through forward thinking and using innovative ideas from around the world.

value Adding

Our recommendations for NSPAT are designed to add value to design, architecture, place making and wayfinding. Not art for arts sake but art for all people. It will value add to capital works programmes, cultural planning strategies, tourism and economic development objectives.

integrated

The integration of public art into existing plans of management and strategic programmes, focussing on ideas for streets, parks, buildings, infrastructure, capital works and environmental programs, architecture, amenity and sense of place.

Diverse

Sourcing the right art for its audience and context. The mix of art ideas ranges from the temporary to the permanent, the bold, the subtle, the designed and the finely crafted. Our recommendations expand the range of interfaces between art and the wider community.

consultative

The success of the project should be based on thorough stakeholder engagement, providing the community with a strong sense of ownership and excitement around its implementation.

identity Enhancing

A successful art trail should enhance identity and sense of place. The stories, histories and future development of North Sydney will inform the development of artistic concepts which resonate with the area’s cultural identity.

APPROAcH

ATTACHMENT TO CLS03 - 20/07/15 Page 9

Page 11: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 7

The following tasks and stages outline the project’s methodology:

• Explore a range of potential artwork sites within the built and natural environment, taking into consideration iconic views and architecture

• Documentation of potential key public art sites

• Consider the diverse range of visual art forms now applied to public settings, including new media and new technologies

• Recommend a range of artworks from the temporary to the permanent, as well as a strategic approach to implementing projects in the short, medium and long term

• Consider industry standards and be benchmarked against other similar projects

As identified in the project brief, specific tasks include:

Stage 1: Project Review and Site inspections

Review all documentation provided by Council on the draft art trail, existing art works located on this trail or nearby (as part of the trail), proposed sites, public domain manual, public art policy and relevant public art guidelines.

Stage 2: consultation

Consult with relevant stakeholders to update, engage and elicit feedback about the NSPAT. Such consultation will be undertaken in the form of meetings and include the project control group, councillors and appropriate private building owners.

Stage 3: Draft Report

Incorporating the project elements of the brief, project research, detailed site investigation and feedback from internal (and relevant external) consultation, prepare a recommended and revised public art trail.

Stage 4: Final Report

Incorporating the project elements of the brief, project research, detailed site investigation and feedback from internal (and relevant external) consultation, delivery of a final report detailing a recommended and revised trail.

mETHODOlOGY

ATTACHMENT TO CLS03 - 20/07/15 Page 10

Page 12: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 8

Conservation/maintenance of existingartworksFunds allocation for proposed artworksPartial take up of recommended trailcomponentsCompeting interests for tourist time

Temporary art to activate CBDPartnering with business to deliver budgetsand commissioned artworksIntegrated and new media artworksPartnership with State RailIncreasing cultural tourism

Number of public artworksLack of contemporary/high profile artworksAccessibility/mobility issues in some areas ofthe trailComplimentary landscape treatment forexisting artworksCouncil public artwork procurement processrequires updating to meet industry standards

S T R E N G T H S W E A K N E S S E S

O P P O R T U N I T I E S T H R E A T S

SwOT ANAlYSiS

ATTACHMENT TO CLS03 - 20/07/15 Page 11

Page 13: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 9

1 Luna Park Entrance Face2 Coney Island3 Comic Walk4 Lavender Bay (Quibaree Park)5 Clark Park Sculptures6 Royal Art Society 7 Saint Pete7 Saint Peter’s Park 8 Victoria Cross Forecourt9 Lines of Communication by Hany Armanious & Mary Teague & Lissadell by Freddie Timms10 Mary McKillop Place Statue11 Wheeler Lane Building Facade12 12 Australian Catholic University 13 Mutidjula: Wanambi (The Serpent) by Lawrence Beck14 Harbour Cycles by Richard Byrnes 15 Brett Whiteley Place16 Former 1st Methodist Church Site17 17 Foxie by Clary Akon18 Bradfield Park North19 Former North Sydney Gateway20 Australian Angel by Bernard Luginbuhl

Architectural Site

Proposed Sculpture Site

Existing Artwork

Public Art Trail

Open Space

LEGEND

North Sydney Public Art Trail

0 50 100 150

Approximate Scale

Art Trail walking Times

The North Sydney Public Art Trail has been configured in an approximate loop. The overall trail comprises a length of approximately 4km.

Given the undulating nature of the North Syd-ney location it is expected that the overall trail would be completed between 2.5 to 3.5 hours allowing for stops of varying lengths at each of the sites. The layout of the trail readily permits walking just a short section or completing one of the smaller loops contained in the whole.

All Abilities Access

North Sydney’s local topography provides some challenges to all ability access. While the trail cannot be completed in an entire loop, due to a large flight of stairs between sites 4 and 5, the layout does permit for access to all existing and proposed art sites using alterna-tive entry points.

While the sites are numbered there is no need to undertake the walk in a specific numerical order. The proposed artwork site located in Wheeler Lane (Site 11) will required the con-struction of a new pedestrian/pram crossing to replace an existing up-stand kerb that makes some forms of all ability access difficult.

The Final Trail Map (A3 size) is provided in Appendix.

PROPOSED TRAil mAP

ATTACHMENT TO CLS03 - 20/07/15 Page 12

Page 14: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

TRAil SiTES

PART TWO

ATTACHMENT TO CLS03 - 20/07/15 Page 13

Page 15: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 11

LOCATION Site # 1: luna Park Entrance Face

Milsons Point to Lavender Bay Promenade

ExISTING ART ELEMENT Entrance face to Luna Park where patrons are required to enter through the mouth. The face is flanked on each side by Art Deco towers modelled on the Empire State Building.

DESCRIPTION The Luna Park Face was originally based on existing designs at Luna Park Melbourne and Steeplechase Park in the United States. There have been eight distinct faces since the original was installed in 1935. The current face completed in 1994 is based on Arthur Barton’s 1950 Old King Cole’ version.

LANDSCAPE TREATMENT Building facade with appropriate and maintained pavement area on foreground. No landscape treatment is required.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Owners consent will be required. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Existing

ExiSTiNG ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 14

Page 16: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 12

LOCATION Site # 2: coney island

Milson’s Point to Lavender Bay Promenade

1 Olympic Drive, Milsons Point

ExISTING ART ELEMENT Coney island facade treatment with strong Art-Deco design influences.

DESCRIPTION First constructed in 1935, Coney Island - Funnyland is the only operating example of a 1930s funhouse left in the world. It is a large single-cell double-storey height utilitarian structure ingeniously decorated as Moorish Extravaganza. Entrance façade dominated by elaborate twin pylons with ensemble of arches and signs. Dominated by large Russian ‘Onion’ Dome at southern end. Assertive Pseudo-Moorish theme continues on West (harbour) façade and part of south, with minarets, grilles etc.

LANDSCAPE TREATMENT No landscape required. Existing boardwalk.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Owners consent will be required. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Existing

ARcHiTEcTuRAl SiTE

ATTACHMENT TO CLS03 - 20/07/15 Page 15

Page 17: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 13

LOCATION Site # 3: comic walk

Foreshore Walk Lavender Bay

ExISTING ART ELEMENT Series of small scale sculptures located in garden beds adjacent to the promenade walk. While the sculpture designs are by various artists, they have been made by long time Lavender Bay resident Peter Kingston.

DESCRIPTION Drawing on Australia’s golden age of comic strips, miniature sculptures of popular comic characters such as Blinky Bill, Splodge and the Magic Pudding are placed along the fore-shore walk to be discovered by visitors. The Michael Leunig artwork, A Cup of Tea is homage to victims of the Ghost Train Fire at Luna Park in 1979.

NOTES & IDEAS A detailed review of all comic walk sculptures should be undertaken in consultation with the artist to determine which artworks require conservation or replacement.

LANDSCAPE TREATMENT Due to overgrown branches and leaves, some sculptures are partially hidden. Greater periodic landscape maintenance is required to ensure the sculptures and identifying text are fully visible.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Owners consent will be required. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Existing

ExiSTiNG ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 16

Page 18: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 14

LOCATION Site # 4: lavender bay (Quibaree Park)

Lawn area located between the amenities block and con-crete boat ramp.

PROPOSED ART ELEMENT Proposed new art site, potentially 3D sculptural work in open space nearby to amenity block. Seating/shade element could be included.

NOTIONAL BUDGET $100,000 - $150,000

DESCRIPTION Acts as a bookend to comic walk and marker to guide trail walkers up the stairs to Clark Park and Wendy Whiteley’s Secret Garden.

NOTES & IDEAS Lavender Bay is rich with historical and cultural meaning, providing significant material for a new artwork. The proposed site has links to boat building activity as well as one of the first swimming schools for children.

LANDSCAPE TREATMENT Landscape treatment required to ensure artwork is integrated into the site. Quirabee Park is currently being renovated. Opportunity exists for modification to current draft plans to integrate the artwork with landscaping.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Medium Term (2-3 years)

PROPOSED ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 17

Page 19: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 15

ATTACHMENT TO CLS03 - 20/07/15 Page 18

Page 20: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 16

LOCATION Site # 5: clark Park Sculptures

(Wendy Whiteley’s Secret Garden adjacent to Railcorp Land)

ExISTING ART ELEMENT A collection of formal sculptures set within the SW corner of Clark Park. Immediately adjacent is the Secret Garden of Wendy Whiteley, located on land that is leased from Railcorp. The gardens although private, are open to the public and make a substantial contribution to the overall Clark Park aesthetic. In addition to the formal sculptures many pieces of found objects are displayed or incorporated into the garden design.

DESCRIPTION Tucked away in the western corner of Clark Park are the Clark Park Sculptures, including a marble sculpture by du Bourg, installed in 1981, a bronze teapot entitled ‘A Nite to Remember’ by Edward Randall Moss and cast by Peter Kingston, 1987, and a bronze sculpture entitled ‘Head’ by Joe Allenberg, 1974.

LANDSCAPE TREATMENT Existing landscape treatment in place for Clark Park and the adjacent Wendy Whiteley Secret Garden locations. No further landscape works required.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Existing

ExiSTiNG ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 19

Page 21: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 17

LOCATION Site # 6: Royal Art Society

25/27 Walker Street, Lavender Bay

ExISTING ART ELEMENT The site of the Royal Art Society of NSW was established in 1880. The site is home to the Royal Art Society of NSW and continues to serve its members and operate as a gallery space.

DESCRIPTION The Royal Art Society of NSW building has played an important role in the promotion and development of artists within NSW.

LANDSCAPE TREATMENT No landscape work required. Existing streetscape setting.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Existing

ARcHiTEcTuRAl SiTE

ATTACHMENT TO CLS03 - 20/07/15 Page 20

Page 22: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 18

LOCATION Site # 7: Saint Peter’s Park

Saint Peter’s Park (small urban park linking Mackenzie Street to Miller Street) - forms part of Miller Street.

PROPOSED ART ELEMENT Potential site for new public artwork in a landscape setting. Location would capture visitation/ experience by commuters from North Sydney Train Station and Blue Street bus stops walking south.

NOTIONAL BUDGET $100,000 - $120,000

DESCRIPTION Small reserve/green space connecting MacKenzie Street to Miller Street provides significant opportunity for a new artwork. The site has significant vegetation, but is looking tired and dated.

NOTES & IDEAS Opportunity exists for an overall upgrade of the landscape treatment associated with the placement of a public art element. Possibility of integrated art/street furniture as a rest spot for commuters and trail walkers.

LANDSCAPE TREATMENT Remodelling of the overall reserve to provide an appropriate urban landscape setting for proposed public art elements and seating / rest areas.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Medium Term (2-3 years)

PROPOSED ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 21

Page 23: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 19

ATTACHMENT TO CLS03 - 20/07/15 Page 22

Page 24: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 20

LOCATION Site # 8: victoria cross Forecourt

60 Miller St, North Sydney at intersection with Mount Street

PROPOSED ART ELEMENT Proposed new major artwork as landmark statement at key CBD intersection. Recommend EOI process open to Australian and international artists.

NOTIONAL BUDGET $180,000 - $250,000

DESCRIPTION The site was previously identified in the North Sydney Centre Urban Design Project, by McGregor + Partners in 2005. It would provide a significant addition to the proposed Brett Whiteley Plaza located on the opposite side of the street, marking the area as a key urban place within the CBD.

NOTES & IDEAS Consideration by Council should be given to the future of Mount Street in the immediate location to determine broader urban design options.

LANDSCAPE TREATMENT Extensive landscape design will be required to ensure an integrated outcome with the surrounding urban fabric. Detailed urban landscape design should form part of any proposal.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Long Term (4-5 years)

PROPOSED ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 23

Page 25: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 21

ATTACHMENT TO CLS03 - 20/07/15 Page 24

Page 26: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 22

LOCATION Site # 9: Lines of Communication - Hany Armanious & Lissadell - Freddie Timms

Forecourt (ceiling) and foyer artworks 40 Mount Street, North Sydney

ExISTING ART ELEMENT Freddie Timms painting - Lissadell is applied to the ceiling of the forecourt / building overhang. A second sculpture - Lines of Communication by artists Hany Armanious and Mary Teague is displayed in the Mount Street foyer.

DESCRIPTION The ceiling of the building forecourt displays one of the largest aboriginal paintings ever completed. It is a depiction of Lissadell Station where artist Freddie Timms spent much of his early life growing up and as a stockman. The second art element, a collaboration by artists, Hany Armanious and Mary Teague references the sites former use as the North Sydney telephone exchange.

LANDSCAPE TREATMENT No landscape treatment required.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Existing

ExiSTiNG ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 25

Page 27: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 23

LOCATION Site # 10: mary macKillop Place Statue

7/11 Mount Street, North Sydney

ExISTING ART ELEMENT Formal religious sculpture, bronze cast of Sister Mary MacKillop located in the garden forecourt of Mary MacKillop Place.

DESCRIPTION Bronze formal sculpture by artist, Judith Rolevink. Located in the forecourt of the Mary MacKillop Chapel, it was un-veiled on 17 October 2011.

LANDSCAPE TREATMENT Periodic landscape maintenance by the building owners to ensure the sculpture and identifying text are fully visible.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Existing

ExiSTiNG ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 26

Page 28: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 24

LOCATION Site # 11: wheeler lane building facade

12 Mount Street, North Sydney

PROPOSED ART ELEMENT Large scale contemporary artwork to be located on building facade facing onto Wheeler Lane and possibly extending to connecting walkway at the northern end of Wheeler Lane.

NOTIONAL BUDGET $100,000 - $150,000

DESCRIPTION The Wheeler Lane facade surface of 12 Mount Street presents a significant canvas for a large scale artwork.

NOTES & IDEAS Opportunity to draw from current role as a commercial hub. Digital media, lighting and other technologies could form the basis of an artist brief.

LANDSCAPE TREATMENT No landscape work would be required as the proposed artwork would be attached to the building wall. Installation of a pram crossing is required at the end of Wheeler Lane to assist with all abilities access.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Long Term (4-5 years)

PROPOSED ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 27

Page 29: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 25

ATTACHMENT TO CLS03 - 20/07/15 Page 28

Page 30: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 26

LOCATION Site # 12: Australian catholic university

The Chapel, Australian Catholic University - 40 Edward Street, North Sydney

ExISTING ART ELEMENT Designed reflective space inclusive of baptismal font, seating, landscape and planting.

DESCRIPTION Enclosed forecourt entry to campus chapel and nearby sculptures in lawns fronting Edward Street. Works include those by Terrance Plowright and Linda Klarfield.

LANDSCAPE TREATMENT No landscape treatment is required.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Existing

ARcHiTEcTuRAl SiTE

ATTACHMENT TO CLS03 - 20/07/15 Page 29

Page 31: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 27

LOCATION Site # 13: Mutidjula: Wanambi (The Serpent) - lawrence beck

Cnr Pacific Hwy & Berry Streets

ExISTING ART ELEMENT Large scale concrete sculptures sit within the building perimeter landscape, representing a Pitjantjantjara theology.

DESCRIPTION Echoing the massive forms that dominate the North Sydney CBD are sculptures by Lawrence Beck, cast in concrete, relieved by swirling shapes scooped powerfully from the concrete block.

LANDSCAPE TREATMENT Periodic landscape maintenance by the building owners to ensure the sculptures and identifying text are fully visible.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Existing

ExiSTiNG ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 30

Page 32: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 28

LOCATION Site # 14: Harbour Cycles - Richard byrnes

Cnr Miller and Berry Streets

ExISTING ART ELEMENT Harbour Cycles was commissioned by North Sydney Council in 2008. The cast aluminium sculpture reflects the maritime imagery of North Sydney.

DESCRIPTION The sculpture is a response to the ambition, city landscape and architecture of North Sydney. The component sectors of the circle reference the diverse imagery of the area; portholes, water turbulence, rivets and struts of the Harbour Bridge, maritime machinery, boat hulls, office windows, buoys, flags and architectural construction.

LANDSCAPE TREATMENT Possible extended planter/seating element around artwork to improve amenity and better integrate the sculpture into the site.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Existing

ExiSTiNG ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 31

Page 33: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 29

LOCATION Site # 15: brett whiteley Place

Mount Street, North Sydney

PROPOSED ART ELEMENT Brett Whiteley sculpture (exact design to be confirmed)

NOTIONAL BUDGET To be advised

DESCRIPTION The proposed redesigned Brett Whiteley Place recommends the installation of a permanent sculptural element associated with the event space (Denison Street intersection).

On this spot currently stands a column, formerly part of the Sydney GPO. The space also features three sculptural water features designed by Robert (Bob) Woodward in 1985.

NOTES & IDEAS Wendy Whiteley has advised some modifications to the construction materials to any current totem are required to improve longevity and reduce potential ongoing maintenance.

LANDSCAPE TREATMENT Landscape will be addressed as part of the overall Brett Whiteley Plaza redevelopment.

RECOMMENDATIONS DA not required in this report as will form part of Brett Whiteley Place Design and DA process. Appropriate artwork attribution/trail signage required in accordance with the public art trail recommendations. Additional artwork will be selected as guided by the Brett Whiteley Place Concept Plan (Oculus, 2015).

STAGING PRIORITY Short Term (1-2 years).

Example of similar Brett Whiteley sculpture to be installed in Mount St

PROPOSED ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 32

Page 34: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 30

ATTACHMENT TO CLS03 - 20/07/15 Page 33

Page 35: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 31

ATTACHMENT TO CLS03 - 20/07/15 Page 34

Page 36: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 32

LOCATION Site # 16: Former 1st methodist church Site

Cnr Blue Street and Pacific Highway, North Sydney

PROPOSED ART ELEMENT Proposed new major entrance artwork element as gateway statement to North Sydney CBD area from Cahill Expressway.

CONFIRMED BUDGET $150,000

DESCRIPTION The site marks North Sydney’s first Methodist Church, constructed in 1865 and demolished in 1931 as part of associated works with the Sydney Harbour Bridge. The site is currently a small traffic island comprising tree planting, paths and gravel surfacing. In 2015 RMS commenced negotiation with Council regarding a bicycle lane along the eastern boundary of the site. This will determine the dimensions of the artwork.

NOTES & IDEAS The site will become part of the gateway marker experience into North Sydney. The artwork will need to be of sufficient scale to act as a significant landmark. The site will form the termination point of the North Sydney Gateway currently under design.

LANDSCAPE TREATMENT Extensive landscape design will be required to ensure an integrated outcome with the surrounding urban fabric. Detail urban landscape design should form part of any proposal. It is likely trees will need to be removed/relocated to ensure sufficient space is available for the artwork.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Short Term (1-2 years)

PROPOSED ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 35

Page 37: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 33

ATTACHMENT TO CLS03 - 20/07/15 Page 36

Page 38: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 34

ATTACHMENT TO CLS03 - 20/07/15 Page 37

Page 39: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 35

LOCATION Site # 17: Foxie - clary Akon

Alfred Street South, North Sydney

ExISTING ART ELEMENT Bronze sculpture on the pedestal of drinking fountain.

DESCRIPTION From a donation of money by Ms Jessie Broomfield, a large scale drinking fountain was built by North Sydney Coun-cil in 1953. To many it seemed a logical extension that a canine sculpture should adorn the pedestal to celebrate the “Jessie Broomfield Memorial Dog Drinking Fountain”. The bronze sculpture by artist Clary Akon was commissioned in 2006.

LANDSCAPE TREATMENT No landscape treatment required.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Existing

ExiSTiNG ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 38

Page 40: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 36

LOCATION Site # 18: bradfield Park North

Alfred Street South, Milsons Point

PROPOSED ART ELEMENT Proposed new art installation as possible free standing piece located near the entrance to Milsons Point Railway Station.

NOTIONAL BUDGET $120,000 - $150,000

DESCRIPTION Forming part of the larger Bradfield Park, the site provides a high profile location for a gateway entry artwork into North Sydney.

NOTES & IDEAS Extensive colonial history associated with the construction of the Sydney Harbour Bridge is available as a possible source of inspiration.

LANDSCAPE TREATMENT REQUIRED

Extensive landscape design will be required to ensure an integrated outcome with the surrounding urban fabric. Detail urban landscape design should form part of any proposal.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Long Term (4-5 years)

PROPOSED ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 39

Page 41: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 37

ATTACHMENT TO CLS03 - 20/07/15 Page 40

Page 42: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 38

LOCATION Site # 19: Former North Sydney Gateway Alfred Street South, Milsons Point

PROPOSED ART ELEMENT Renovation/refurbishment of former gateway structure located on Alfred Street

NOTIONAL BUDGET N/A

DESCRIPTION Historic gateway structure marking entrance to North Sydney.

NOTES & IDEAS Art-deco pillars remain of the original structure that has been dismantled due to safety concerns.

LANDSCAPE TREATMENT Structure located across road. Minor landscape treatment on each side to the structure where it sits in small garden beds.

RECOMMENDATIONS DA approval obtained in November 2014. Former gateway structure to be refurbished in accordance with existing documentation and project timelines.

STAGING PRIORITY Short Term (1-2 years)

PROPOSED ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 41

Page 43: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 39

LOCATION Site # 20: Australian Angel - bernard luginbühl

Olympic Drive Foreshore, Milsons Point

ExISTING ART ELEMENT Australian Angel is made of discarded steel objects from industry and references its place at the entry to Sydney Harbour.

DESCRIPTION Australian Angel was created specially for a major exhibi-tion of sculpture and graphic art by the Luginbühl family of five artists - sculpted by Bernard Luginbühl. The exhibition was the Swiss cultural contribution to the Sydney 2000 Olympic and Paralympic Games.

LANDSCAPE TREATMENT Possible extended planter/seating element around artwork to improve amenity and artwork integration into site.

RECOMMENDATIONS Undertake DA application for inclusion as part of the North Sydney Public Art Trail. Appropriate artwork attribution/trail signage required.

STAGING PRIORITY Existing

ExiSTiNG ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 42

Page 44: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

REcOmmENDATiONS

PART THREE

ATTACHMENT TO CLS03 - 20/07/15 Page 43

Page 45: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 41

The following initiatives are recommended to meet the project’s objectives:

1. Public Art Commissioning Program delivering 7 artworks over 5 years

2. Establishment of an ongoing temporary art program

3. Conservation/replacement of some existing artworks on Comic Walk

4. Marketing strategy and plan for implementation

5. Installation of artist attribution/trail signage to aid wayfinding

Recommendations specific to the commissioning of new artworks include:

• Greater diversity in the range of visual art forms now applied to public settings

• Integrating public art into capital works and private developments

• Creative partnerships to facilitate the implementation of public art

• A strategic approach to implementing projects in the short, medium and long term

• Adequate resources dedicated by Council to manage art commissioning and maintenance program

SummARY OF REcOmmENDATiONS

ATTACHMENT TO CLS03 - 20/07/15 Page 44

Page 46: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 42

REcOmmENDATiONS: KEY ElEmENTS

Marketing Attractions

ATTACHMENT TO CLS03 - 20/07/15 Page 45

Page 47: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 43

The best public art around the world is essen-tially interpretive. It has the power to make the invisible visible, bringing to life the stories and narratives of places in ways that express local history and help build and bind communities.

The long term success of public art rests on its ability to interpret identity - the flavour and character of its place context and then to cre-atively to integrate elements into the physical-ity and form of a site.

The aim should be to create both sophisticat-ed and playful opportunities for engagement and interactivity. Art that invites responses and carry themes which are historic, poetic, emo-tional and informative, accessible to people of all ages and sensibilities.

A range of artwork themes have been pro-posed which celebrate North Sydney’s history and future development.

Suggested creative themes provide a starting point for the preparation of artist briefs and a curatorial approach for commissioning public artworks in North Sydney.

Rather than be prescriptive, creative themes should inspire and encourage artists to research and propose their own ideas and concepts.

cREATivE THEmES

ATTACHMENT TO CLS03 - 20/07/15 Page 46

Page 48: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 44

New Media

UrbanInfomatics

Advertising& Finance

Aboriginal &Torres Strait

Islander

Industry

Events

People

Schools

Learning

OlympicPool

Luna Park

HarbourBridge

Botanical

Wendy'sGarden

SydneyHarbour

PeterKingston

ConradMartins

Brett &WendyWhitely

North SydneyPublic Art Trail

Creative Themes

Nature

History

North SydneyIcons

Artists ofNorth Sydney Education

Business &Technology

cREATivE THEmES

ATTACHMENT TO CLS03 - 20/07/15 Page 47

Page 49: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 45

New artworks commissioned should be low maintenance, cost effective artistic solutions, designed specifically for their individual contexts and addressing the scale, context and design language of the area.

CBD wide concepts, such as trail signage and heritage pavement inlays are proposed to link and integrate the diverse spaces and create a continuous stimulating experience. Specific spaces are proposed as canvases for street art and temporary photography exhibitions, to provide a contemporary urban feel for the growing number of young people living and working in North Sydney.

A number of “must see” landmark sculptures will create destinations, stimulating a wide audience of regular uses, visitors and cultural tourists.

A range of procurement and commissioning models can be used to engage professional artists (local, national and international) in the delivery of high calibre artworks which enhance the personality and sense of place of specific areas.

A guide to different commissioning models is shown in the Appendix.

As a whole proposed artworks should aim to:

• Provide a visual attraction for pedestrians and motor vehicles

• Visually communicate and celebrate stories of North Sydney

• Be innovative and create a unique aesthetic signature to each area

• Contribute to social sustainability and CBD activation

Proposed wall Artwork Site: Wheeler Lane

PROPOSED ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 48

Page 50: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 46

2. urban Street Art

Street art is proposed for CBD spaces visible from the NSPAT. Locations should be diverse - clever and curious places, ideally selected by artists in collaboration with Council.

Street art adds an important contemporary, youthful aesthetic to the project and leverages Australia’s and the worlds increasing interest in this art form. Street art can help develop and build on each individual precinct’s culture and uniqueness.

In addition to small scale artistic street art elements, large scale art walls offer a relatively inexpensive way to dramatically enliven the CBD, improve amenity and contribute to anti-vandalism objectives. A recent example (pictured below) was executed in St. Leonards:

http://www.smh.com.au/entertainment/art-and-design/street-artist-fintan-creates-threestorey-artwork-in-sydney-20141119-11m2zw.html

For the large scale walls in particular, it is recommended experienced urban artists are engaged to ensure a high aesthetic outcome.

Contemporary urban artworks are proposed rather than traditional murals. Artworks should be integrated within existing architectural elements where possible.

Professional development opportunities exist for emerging artists to be mentored and trained by experienced artists.

Key Features:

• Activates CBD and spaces between trail sites

• Large and small scale opportunities

• Contributes to street life and CBD beautification and vibrancy

• Cost effective way to uplift CBD and cover a large footprint

• Range of themes and artistic styles can be used

• Short to medium term lifespan - artworks can be easily refreshed over time

• Sense of surprise and discovery, humorous, quirky, eye catching, youthful

• Adaptable - room for variation in content and size to suit specific sites, range of themes and artistic styles can be used

1. Heritage Pavement inlays

Artist created pavement inlays are recommended to contribute to CBD activation, wayfinding and tourism objectives. These artwork elements should improve the visibility of the NSPAT in the CBD by linking each trail map location, using a common design language in terms of form, materials and scale.

Artwork content should ideally be distinct and unique to each location - designed as historically relevant interpretive markers for the enjoyment of locals and visitors.

History

Artists can draw inspiration from symbols of the locality, poetry, quotes, local characters and interesting facts about North Sydney.

Key Features:

• Activates ground plane and aids wayfinding

• Contributes to street life and CBD beautification

• Cost effective

• Adaptable - room for variation in content and size to suit specific sites

• Visually links trail stops, providing added interest in-between sites

• Strong and long lasting materials, low maintenance

• Heritage value

PROPOSED ADDiTiONAl ARTwORKS

ATTACHMENT TO CLS03 - 20/07/15 Page 49

Page 51: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 47

3. banner Art

Banner art can be installed in the CBD using existing banner poles at key locations on the NSPAT. Consultation and collaboration with relevant government agencies may be required.

Rotated at bi-annual intervals or according to timing of special events, banner flags will feature visual artwork by Sydney artists. A call for artist submissions may result in sufficient material to produce an ongoing temporary “exhibition” of banners year round. While advertising banners are in use, art banners can be stored and re-exhibited at another time or in other locations within the North Sydney LGA.

Key Features:

• Decorative, colourful, eye catching

• Visually links streets within trail

• Promotes a festive atmosphere

• Re-usable and cost effective

4. Photographic Exhibitions

Large format photographic artworks can be exhibited on existing walls on the NSPAT. Consultation and collaboration with relevant building owners will be required.

An example which is attracting public attention and local government praise is the Elizabeth Street Gallery in Sydney CBD.

http://www.elizabethstgallery.com.au/about/

http://www.smh.com.au/entertainment/art-and-design/unofficial-street-gallery-wins-lord-mayors-support-20121112-297zv.html\

Key Features:

• Engagement with emerging artists

• Potential to involve educational institutions

• Large and small scale opportunities

• Inclusion of photography as an art form within the trail mix

TEmPORARY ART

ATTACHMENT TO CLS03 - 20/07/15 Page 50

Page 52: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

imPlEmENTATiON

PART FOUR

ATTACHMENT TO CLS03 - 20/07/15 Page 51

Page 53: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 49

The landform of North Sydney presents a number of challenges for all abilities access continuously along the NSPAT. The trail has been configured in a manner which would permit all abilities access to each and every art location but not necessarily in a linear manner.

The trail has been configured in a manner of a figure eight that would allow users to enter the trail experience at any point.

The use of a digital app that permits trail users to undertake all, part or just sections of the trail permits greater flexibility in all abilities access.

Once fully developed, the app can also suggest alternative routes between certain sites to assist with all abilities navigation.

A proportion of the elements for the NSPAT are in existence. Where new artworks are recommended, project staging has been suggested to assist with the orderly development of art elements to ensure appropriate resources are available.

Three distinct stages of implementation are recommended:

Short Term (1 – 2 years)

These projects are either shovel ready; relatively simple in their configuration and role out and have budget funding available.

• Site 15: Brett Whiteley Place

• Site 16: Former 1st Methodist Church Site

• Site 19: Former North Sydney Gateway

medium Term (2 – 3 years)

These projects have already been considered and some initial planning has already been undertaken. They still require detail design and/or resolution. They may have been budgeted for in longer term estimates, but funding may not yet be available. Further community or site owner consultation may also be required.

• Site 4: Lavender Bay (Quibaree Park)

• Site 7: Saint Peter’s Park

long Term (4 - 5 years)

These projects are still in their very early stages and may only have been identified as part of the current trail review. Significant work is still required including initial budgeting, community and site owner consultation.

• Site 8: Victoria Cross Forecourt

• Site 11: Wheeler Lane

• Site 18: Bradfield Park North

AccESSibiliTYPROJEcT STAGiNG

ATTACHMENT TO CLS03 - 20/07/15 Page 52

Page 54: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 50

Indicative budget ranges have been provided for each of the proposed artworks - final budgets will depend on the type of artwork being commissioned and whether emerging or experienced public artists are desired for the project.

The lower range is a suggested minimum spend to deliver a base level outcome whereas the higher range is considered more aspirational - it is worth considering increasing budgets by a further 20-40% to deliver even better outcomes in terms of scale and quality. Larger public art budgets attract high calibre experienced artists who will help position NSPAT as an important cultural destination.

Note the proposed artwork for Site #16 the former 1st Methodist Church has a confirmed budget of $150,000. An artist expression of Interest and shortlisting process is currently being undertaken with artwork due for completion in 2016.

NSC will need to commit sufficient financial and human resources to implement report recommendations and deliver a successful NSPAT.

UNA by Wolfgang Buttress, commissioned for the Australian National University in 2013 for $300,000.

The Bay by Jade Oakley, commissioned for Woollahra Munici-pal Council in 2014 for $200,000.

Fruition by Matthew Harding, commissioned by Melbourne City Council in 2013 for $150,000.

Artwork Site Low Range Aspirational

Site #4: Lavender Bay (Quirabee Park) $100,000 $150,000Site #7: Saint Peter's Park $100,000 $120,000Site #8: Victoria Cross Forecourt $180,000 $250,000Site #11: Wheeler Lane Building Façade $100,000 $150,000Site #18: Bradfield Park North $120,000 $150,000

Totals: $600,000 $820,000

PROPOSED ARTwORK buDGETS

ATTACHMENT TO CLS03 - 20/07/15 Page 53

Page 55: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 51

The use of appropriate sculptural signage will assist in the further enhancement and clear recognition of the NSPAT locations and route.

Installation of sculptural signage elements to announce arrival at trail destination points, signage to incorporate artist/artwork attribution details and trail location to aid way finding.

Consistency in materials and form should be used to visually link all trail stops.

Key Features:

• Sculptural, eye catching, easily identifiable

• Draw from elements in the North Sydney Urban Design Style Manual

• Complements existing CBD features & provides a contemporary look for the future

• Materials - strong and long lasting, low maintenance, vandal proof

• Adaptable - room for variation in configuration and size to suit individual sites

• Designed to be noticed but not intrusive, informative and visually attractive.

An example of a simple sign/marker concept is shown.

Art piece name/identification

1800mm high recycled timber (dressed) post (150 x 150mm nominal) with recessed panels for signage information

Artist name

Laser cut stainless steel lettering sheet recessed into timber post 10mm

Tamper proof stainless steel fixings to secure lettering sheet to post

PUBLIC ART TRAIL MARKER CONCEPT

LISSADELL

TRAil SiGNAGE

ATTACHMENT TO CLS03 - 20/07/15 Page 54

Page 56: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 52

New technologies offer Councils numerous creative and cost effective ways to promote their cultural programs to the widest possible audience.

The creation of Smartphone apps and Quick Response (QR) codes on artwork signage can link viewers directly to online information about the artist, the artwork making story and process and promote other artworks and attractions in the area.

Online social media tools can be used to promote the project and connect with users at low cost. They also enable customer feedback, can be used to announce special events and easily updated in real time.

An Enhanced Experience

The rich and diverse history and the future development of North Sydney lends itself to extended forms of discovery and interpretation. Complementing the public art components of the trail, the following initiatives are recommended:

Quick Response codes

By incorporating a QR code into artwork signage a whole new dimension in interpretive messaging is opened up to enhance the visitor experience.

Digital App

Housing huge amounts of extra information; a visitor can find themselves listening to audio stories, watching video clips, reading interesting facts, looking at now and then photos etc

A draft brief for the supply, design and hosting of a digital app to complement the NSPAT has been provided in the Appendix.

Key marketing Tools

• Promotion of the art trail through NSC website, app and printed and downloadable brochure QR codes located on signage links to information on website

• Social Media platforms (i.e. Facebook, Twitter, Instagram) updated regularly to promote temporary art program and cultural events

• Media coverage should be sought throughout the different stages of the commissioning process - artist selection, work in progress, installation and launch

DiGiTAl ENGAGEmENT

ATTACHMENT TO CLS03 - 20/07/15 Page 55

Page 57: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

North Sydney Public Art Trail - Final Report July 2015 53

1. NSPAT Map (A3)

2. Artwork Commissioning Models

3. Draft Supplier Brief: NSPAT App Design

APPENDix

PART FIVE

ATTACHMENT TO CLS03 - 20/07/15 Page 56

Page 58: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

1 Luna Park Entrance Face2 Coney Island3 Comic Walk4 Lavender Bay (Quibaree Park)5 Clark Park Sculptures6 Royal Art Society 7 Saint Pete7 Saint Peter’s Park 8 Victoria Cross Forecourt9 Lines of Communication by Hany Armanious & Mary Teague & Lissadell by Freddie Timms10 Mary McKillop Place Statue11 Wheeler Lane Building Facade12 12 Australian Catholic University 13 Mutidjula: Wanambi (The Serpent) by Lawrence Beck14 Harbour Cycles by Richard Byrnes 15 Brett Whiteley Place16 Former 1st Methodist Church Site17 17 Foxie by Clary Akon18 Bradfield Park North19 Former North Sydney Gateway20 Australian Angel by Bernard Luginbuhl

Architectural Site

Proposed Sculpture Site

Existing Artwork

Public Art Trail

Open Space

LEGEND

North Sydney Public Art Trail

0 50 100 150

Approximate Scale

ATTACHMENT TO CLS03 - 20/07/15 Page 57

Page 59: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

Public Art Commissioning Models

Model Type Artist Selection Artist Deliverables Suitability Costs Advantages Disadvantages

1 Direct CommissionArtist/artist teams selected by Art Consultant in

collaboration with design team based on suitability for specific site/project. Artists invited to develop artwork

concept in response to project specific design brief.

Detailed drawings, written concept, architectural renders, timeline, budget and ideally a maquette.

Artist to present concept to design team where possible.

Commercial projects with tight timeframes. Where a specific artist and/or aesthetic quality is deemed

critical.

One off artist concept development fee (range from $1500-$8,000

depending on project scale)

Efficient administrative process/minimal cost. Engagement of high profile artists who may not

submit concepts through other models.

Limited artwork options and risk of artwork concept being

unsatisfactory. Lack of public consultation could effect public ownership and appreciation of

artwork.

2 Limited TenderLimited number of artists (i.e. 3-5) selected by Art

Consultant in collaboration with design team and invited to develop and submit concept proposals in response to

project specific design brief.

Detailed drawings, written concept, architectural renders, timeline, budget and ideally a maquette.

Artist to present concept to design team where possible.

Commercial and public sector projects with tight timeframes and limited budgets. Where the project demands a particular type of artist

and aesthetic quality.

One off artist concept development fees (range from $1500-$5,000

depending on project). More costly than model #1 but less than model

#3.

Greater control over artist selection and final outcomes. With more

artists, the risk of artwork concepts being unsatisfactory is reduced.

Lack of public consultation could effect public ownership and

appreciation of artwork.

3 Public EOI

Publicly advertised invitation for suitably experienced artists/artist teams to submit an expression of interest

(EOI) proposal in response to project specific brief. Selection panel to review and select limited number of

artists (i.e. 3-5) to develop and submit concept proposals in response to project specific design brief.

Artist CV, 5-10 images showing previous relevant projects. Detailed concept proposal not required

however a concept sketch/one page written approach may be requested.

High profile public sector projects where transparency is critical.

Projects with significant art budgets and will benefit from casting a wide net (may be open to international

artists).

Artists are not paid a fee for EOI proposals. A number of artists/artist

teams selected and paid a fee to develop a concept. Administration

costs can be high depending on number of artist submissions

received.

Potential large pool of artists, publicly transparent process. PR

opportunities.

No control over quality of artist submissions. Some artists will not

enter public EOI competitions preferring direct or limited tender

processes.

4 Artist as DesignerArtist/artist teams selected for design/concept phase only.

Artist to work with design team and respond to project specific design brief.

Detailed drawings, written concept, architectural renders. Commercial fabrication options explored

by Art Consultant. Fabrication forms part of architectural, landscape and other relevant

contractor's delivery program.

Where integrated art is a high priority and visibility of the "artist

hand" is not an aesthetic requirement.

Artist design fee paid for concept development and license for use of

design. Artist fees will vary depending on complexity and scale

of project.

Artist designed functional elements (furniture, signage, lighting) means

fabrication budgets can be absorbed by other cost centres.

Artist design interventions may be too subtle and not viewed as public

art.

5 Artist in ResidenceArtist/artist teams selected by Art Consultant to work with community group in creation of concept proposals. Artists

should have teaching experience and/or experience working on collaborative public art projects.

Detailed drawings, written concept, architectural renders, timeline, budget and ideally a maquette. Community members to fabricate artwork under

direction of artist.

Where process and community engagement are deemed high priorities for the success of the

project.

Artist paid a fee to work with community members, fee will vary depending on complexity and scale

of project.

Community ownership and pride in artwork. PR opportunities.

Aesthetic outcomes may be jeapordised despite a successful

community "process"

ATTACHMENT TO CLS03 - 20/07/15 Page 58

Page 60: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

BRIEF: Digital Walking Tour Application North Sydney Public Art Trail

1

Introduction

The following brief outlines the creation of a digital walking tour experience for mobile phone users that will compliment the proposed North Sydney Public Art Trail. The mobile application will be available to use on both iOS and Android devices, and allow the audience to access additional information about artworks that may not fit on physical signage, or be digital in nature such as video and audio recordings.

The app will let visitors access a rich and diverse amount of background information about the artworks on the trail and their creation, function, and form. It can also add value to the Public Art Trail, in terms of highlighting the North Sydney location, architecture, views, and vistas.

Project Objectives

• Creation of a mobile walking tour app that provides access to multi dimensional additional information about artworks on the North Sydney Public Art Trail.

• Branded mobile application in both the Apple itunes store and the Android Marketplace.

• An integrated interactive map encompassing each stop on the North Sydney Public Art Trail also providing digital wayfaring.

• Access to an easy-to-use web based "back end" for content creation and editing which will allow for additional sites to be added and temporary works to be added in the future by North Sydney Council staff.

• Access to statistics on app usage metrics. • Ability to advertise the app by use of QR codes placed on outdoor

signage.

ATTACHMENT TO CLS03 - 20/07/15 Page 59

Page 61: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

BRIEF: Digital Walking Tour Application North Sydney Public Art Trail

2

Main content components

Theme

Examples

Content considerations

Public Artworks

Existing artworks and new commissions

Tour to include existing artworks on the North Sydney Public Art Trail but the flexibility to add new artworks as they are commissioned. The application to have the ability to include photographs, video and audio of artworks and their creation. This may include interviews with the artists, video of the creation of artwork, or written history of the artwork.

Temporary Artworks

Banners, Street Art

Tour app to have the ability to include artworks of a temporary nature such as street art. Application could also provide a link to websites that feature up-to-date information about temporary artworks such as street art.

Icons of North Sydney Gardens, architecture, views

Tour to include non artwork related content such as the highlighting of significant view points, gardens, and content related to stand-out North Sydney architecture. Content could include "then and now" photography using historical images and the written history of the area of North Sydney.

Rests Public toilets and physical rest stops

The tour must include the location of public toilet facilities and rest stops, such as park benches.

Refreshments Food and Beverage outlets

The tour can include the location of outlets where food and beverage can be purchased. There may also be a function to offer business partnership opportunities between North Sydney Council and local businesses. This can take the form of "in-app" advertising including special deals and offers.

ATTACHMENT TO CLS03 - 20/07/15 Page 60

Page 62: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

BRIEF: Digital Walking Tour Application North Sydney Public Art Trail

3

Specific audience considerations

Families with children Access to information such as toilet facilities, food and beverage outlet locations, possibly content aimed at young children.

Cultural Tourists Clear GPS mapping possibly providing information such as public transport locations. Availability to download the map offline so overseas visitors can avoid high data charges on mobile phones.

Vision impaired Access to audio version of written content.

Hearing impaired Access to captioned video content. Any audio content to also be reproduced as written content.

Other creative content considerations

• Content to be provided by North Sydney Council, Creative Road Art Projects or direct from Artists. This includes photographs, written work, video, audio and similar.

• Branding for use in the app to be provided by North Sydney Council. This includes all logos.

• Appropriate copyright licenses to be in place to allow for the use of all content.

• Written, oral, and map content to provide clear wayfaring between stops on the North Sydney Public Art Trail.

• Written history of certain tour sites can be provided by Council Historian.

ATTACHMENT TO CLS03 - 20/07/15 Page 61

Page 63: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

BRIEF: Digital Walking Tour Application North Sydney Public Art Trail

4

Schedule and Budget

Schedule:

The schedule for the completion of the app is to be discussed in conjunction with consultants Creative Road and North Sydney Council. The initial app setup with initial content can be created in approximately 12-16 weeks, with additional stops being able to be added as necessary into the future.

Budget

The following is an estimated budget based on content being provided by North Sydney Council, Creative Road, or direct from artists:

App setup using existing commercial framework* and publishing to iTunes app store and Android market place.

$2500 5 Weeks

Content editing / upload

15hrs x $150 per hour

$2250 4 Weeks

User testing 1st iteration and resulting edits

8hrs x $150 per hour

$1200 2 Weeks

Training for North Sydney Council staff for ongoing app management

2hrs x $150 per hour

$300 1 Week

Estimated total budget

$6250 12 Weeks

*such as My Tours app or similar

Optional but recommended

* A professional copywriter would ensure all written content presents in a singular 'voice' giving a contemporary and polished feel to the app's content.

Professional Copywriter*

15hrs x $150 per hour

$2250 4 Weeks

ATTACHMENT TO CLS03 - 20/07/15 Page 62

Page 64: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

BRIEF: Digital Walking Tour Application North Sydney Public Art Trail

5

Additional ongoing costs

Ongoing hosting and technical support *

Approx $1500 per year

ongoing

*Ongoing hosting in the App store and Android Marketplace, technical maintenance and support costs are essential. This will need to be budgeted into the ongoing life of the project.

ATTACHMENT TO CLS03 - 20/07/15 Page 63

Page 65: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

BRIEF: Digital Walking Tour Application North Sydney Public Art Trail

6

Resources

Comparative walking tour apps using similar design methodology:

• The Powerhouse Museum: http://www.powerhousemuseum.com/walkingtours/

• State Library of South Australia Walking Tours http://guides.slsa.sa.gov.au/walkingtoursapp

ATTACHMENT TO CLS03 - 20/07/15 Page 64

Page 66: CLS03 Public art Trail - Development Consent Granted · business district, home to a diverse range of commercial activities, including service, property, communications and financial

BRIEF: Digital Walking Tour Application North Sydney Public Art Trail

7

Suggested Suppliers

The following three suppliers are experts in creative digital projects and have experience creating walking tour applications for large cultural institutions.

1. Erika Taylor Consulting, digital curator. Email: [email protected]

2. Luke Dearnley, web consultant and developer. Email: [email protected]

3. Leonie Jones, digital media consultant. Website: http://leoniejones.squarespace.com/

ATTACHMENT TO CLS03 - 20/07/15 Page 65