M. Gilchriese
Glued Fittings
October 5, 2005
M. Gilchriese2
Samples and Prep
• Three samples using Hysol 9396• Seven samples using Hysol 9394• Surface prep tubes
– Sandpaper(600) with alcohol– Wash with alcohol– Wash with acetone
• Surface prep fitting– Brass wire brush with alcohol– Wash with alcohol– Wash with acetone
• Irradiate to about 25 MRad (exact value TBD)• He leak -> P to 15.5 bar -> He leak -> irradiate -> P to 15.5 bar
-> He leak
M. Gilchriese3
Samples After Irradiation• Note that epoxy turns blue-like color. No evidence of epoxy running.
M. Gilchriese4
Before/After Comparison
• Small weight gain
• Note that did not try to control electrical contact between fittings and pipe. Resistance after. Did not measure before.
• Change in leak rate not significant. Small change from setup on different days.
SampleWeight Before
Weight After(10/4) After-Before
Resistance After
Leak Before Leak After
96A 1.9813 1.9838 0.0025 Open 1.10E-09 1.30E-0996B 1.9788 1.982 0.0032 Open 1.10E-09 1.30E-0996C 1.97 1.9735 0.0035 0 1.20E-09 1.30E-0994A 1.8542 1.8579 0.0037 Open 1.10E-09 1.40E-0994B 2.0056 2.0073 0.0017 Open 1.10E-09 1.20E-0994C 1.8837 1.8855 0.0018 0 1.10E-09 1.30E-0994D 1.7724 1.7748 0.0024 Open 1.20E-09 1.60E-0994E 1.7756 1.7778 0.0022 0 1.10E-09 1.50E-0994F 1.7809 1.7833 0.0024 0 1.00E-09 1.10E-0994G 1.9228 1.9256 0.0028 Open 1.30E-09 1.50E-09
M. Gilchriese5
9396 Pictures
M. Gilchriese6
9394 Pictures
M. Gilchriese7
Cross Section 9396
9396
Tube in aboutCorrect Longitudinalposition
M. Gilchriese8
Cross Section 9394
9394
Tube notFullyInserted
Big void
Glue film
M. Gilchriese9
First Conclusion
• Promising but need more testing
• Thermal cycling about to start
• Will do pressure cycling also
• Mechanical strength tests to follow, need to define protocol
• Need more tests in C3F8 not irradiated and irradiated to understand penetration into epoxy. Bulk epoxy samples
• Assuming all is OK, better control of glue application and assembly. These samples were done in a hurry.