M. Gilchriese Glued Fittings October 26, 2005. M. Gilchriese 2 Samples and Prep Three samples using...
Transcript of M. Gilchriese Glued Fittings October 26, 2005. M. Gilchriese 2 Samples and Prep Three samples using...
M. Gilchriese
Glued Fittings
October 26, 2005
M. Gilchriese2
Samples and Prep
• Three samples using Hysol 9396• Seven samples using Hysol 9394• Surface prep tubes
– Sandpaper(600) with alcohol– Wash with alcohol– Wash with acetone
• Surface prep fitting– Brass wire brush with alcohol– Wash with alcohol– Wash with acetone
• Irradiate to about 25 MRad• He leak -> P to 15.5 bar -> He leak -> irradiate -> P to 15.5 bar
-> He leak. Vacuum inside part.
M. Gilchriese3
Samples After Irradiation• Note that epoxy turns blue-like color. No evidence of epoxy running.
M. Gilchriese4
Before/After Comparison
• Small weight gain.
• Note that did not try to control electrical contact between fittings and pipe. Resistance after. Did not measure before.
• Change in leak rate not significant. Small change from setup on different days. Fine after about 100 thermal cycles.
• Next step is high pressure He test. Making setup.
SampleWeight Before
Weight After(10/4) After-Before
Resistance After
Leak Before Leak After
After Thermal Cycle
96A 1.9813 1.9838 0.0025 Open 1.10E-09 1.30E-09 Sectioned96B 1.9788 1.982 0.0032 Open 1.10E-09 1.30E-09 1.20E-0996C 1.97 1.9735 0.0035 0 1.20E-09 1.30E-09 1.20E-0994A 1.8542 1.8579 0.0037 Open 1.10E-09 1.40E-09 Sectioned94B 2.0056 2.0073 0.0017 Open 1.10E-09 1.20E-09 1.40E-0994C 1.8837 1.8855 0.0018 0 1.10E-09 1.30E-09 1.30E-0994D 1.7724 1.7748 0.0024 Open 1.20E-09 1.60E-09 1.30E-0994E 1.7756 1.7778 0.0022 0 1.10E-09 1.50E-09 1.10E-0994F 1.7809 1.7833 0.0024 0 1.00E-09 1.10E-09 1.20E-0994G 1.9228 1.9256 0.0028 Open 1.30E-09 1.50E-09 1.20E-09
M. Gilchriese5
9396 Pictures
M. Gilchriese6
9394 Pictures
M. Gilchriese7
Cross Section 9396
9396
Tube in aboutCorrect Longitudinalposition
M. Gilchriese8
Cross Section 9394
9394
Tube notFullyInserted
Big void
Glue film
M. Gilchriese9
First Conclusion
• Promising but need more testing.• Simple mechanical test completed(9394B) by constraining tube
and applying torque to fitting. Tube deformed first, glue joint did not break. Stopped and leak checked OK.
• In process of setting up shear tests that will compare irradiated to non-irradiated. And 9394 to 9396.
• Need more tests in C3F8 not irradiated and irradiated to understand penetration into epoxy. Bulk epoxy samples.
• Assuming all is OK, better control of glue application and assembly. These samples were done in a hurry.
• Need to understand importance of guaranteed electrical contact. Believe can make contact (by tube contact with fitting at end), which could be checked during assembly. Long term?
M. Gilchriese10
Capillaries
• Six samples made with Hysol 9394
• All pass He leak -> P to 20 bar -> He leak, Vacuum in part.
• Setting up to irradiate 4 in C3F8. Will keep other two at 20 bar in the meantime.
SampleWeight Before
Weight After Rad
Weight After-Before
Leak Before* Leak After
After Thermal Cycle
A 1.8613 <1e-9B 1.8619 <1e-9C 1.8612 <1e-9D 1.8472 <1e-9E 1.8539 <1e-9F 1.8638 <1e-9
* after pressurization to 300 lb gauge
M. Gilchriese11
Capillary Samples