National LUP workshop 4.10-5.10.12, Vientiane, Lao PDR TABI LUP Progress and Activities: Achievements, Current and Planned

Transcript of Lupws session 1 progress a_TABI_eng

13.04.2023

1

Session 1: LUP Progress and Activities:

Achievements, Current and Planned

TABIthe AgroBioDiversity Initiative

13.04.2023

2

1: Introducion to TABI2: Target Villages3: Process’s developed4: Tools developed5: Plans for 2012-13

Contents of Presentation

13.04.2023

3

GOAL: to raise the status/role of AgroBioDiversity and AgroEcoSystems in the development process and for poverty reduction.

1: TABI: The AgroBioDiversity Initiative

HOW ? Supporting and facilitating initiatives and projects related to ABD in agriculture, forest and aquatic ecosystems.

FALUP: Supports/facilitates LUP which:1: includes indigenous agriculture and village forest management.2: Is realistic, practical and will actually be used by the villages.

Target Areas: Currently : Luang Prabang and Xieng Khouang Provinces

13.04.2023

404/13/2023

Link to FALUP Platform > Location MAP

www.flupplatform.la

13.04.2023

5

2: Target Villlage undertaken to date (last 2 dry seasons)

Province DistrictGoomban/Cluster

No. village

Luang Prabang PonsaiSopJia 7DoneKham 5ChomChieng 5

Xieng Khouang

PhoukodtKheung Longhang 6Tai 7Long Khan 3

2 Provinces 2 .istricts 6 Village Clusters 33 villages

13.04.2023

6

Completed in 8 Kumban of 3 districts and 3 Provinces.

Location No. village

No. Household Area (ha)

Phonexay district, LPB 18 1,644 69,949

1Sobchia GB 8 636 21,507

2Donekham GB 5 488 12,193

3 Chomchieng GB 5 520 36,249

Phoukoud district, XKH 17 1,532 107,749

1Kheng-Longhanf GB 7 427 38,667

2Longkhan GB 3 486 38,074

3Tai GB 7 619 31,008

Hom district, VTE 2 434 24,569

1Phalaveak GB 2 434 24,569

Total 7 GB 37 3,610 202,267

13.04.2023

7

Details of TABI progress to date

13.04.2023

8

Details of TABI progress to date

13.04.2023

9

Details of TABI progress to date

13.04.2023

10

Details of TABI progress to date

13.04.2023

11

Details of TABI progress to date

13.04.2023

12

Details of TABI progress to date

13.04.2023

13

Land use planning process of TABILand use planning process developed by TABI

i: Preparation of SIM and 2.5 D Topo

1: Development of Village Base-Geo Map

2: Village Boundary Mapping

3: Data Collection: socio-economic, NR

4: Current Land/forest use Mapping

5: Village-District review-strategy meeting

6: Land Management Zonation Mapping

Timing - Scheduling ?

1: do not conduct all tasks in 1 village first, then move to all task in next village, etc

2: Do some tasks in all villages, then next tasks in all villages, etc

> Example: 8 village Goomban: Task1&2=1.35 mth, Task 3 &4=1.5 mth, Task 6 = 2 mth = 5 months for full Goomban.

During wet season

4 day/1 village = 1 mth for 8 villages

6 day/1 village = 1.5 mth for 8 villages

6 day/1 village = 1.5 mth for 8 villages

Preparation: 1 week, meeting: 1 day

13.04.2023

14

3: Development of vFALUP Process

Initially (2009-2010) followed the green PLUP manual

Then saw that this was unsatisfactory for various reasons and started to develop improved process.

Key aspects of improved process:

• Work in all villages of a Goomban

• Start village networking from the beginning

• Make repeated missions to village - each mission focus on 2

aspects of LUP

• Ensure focus on current land use and forest cover

13.04.2023

15

Process of the Village Forest and Agriculture Land Use Planning

( FALUP)

Mission 1: Village Base-Geo Mapping, and Village Boundary Mapping ans Agreemtn

Mission 2: ABD and SE Data collection, current land use and forest assessment/ mapping

Workshop: (i) review CLU, and developed strategy for (ii)land use planning and zoning.

Mission 3: Forest and Agriculture Land Management Zonation and Planning

Workshop: (i) Review/discuss on FALUP, (ii) Accept the result of FALUP

13.04.2023

16

FALUP mission3

Process: FALUP Works in all villages in a Goomban in Parrallel – multiple mission

FALUP mission1

Data collection, current land use and forest assessment/ mapping

Village Base-Geo&Village Boundary Mapping

Forest and Agriculture and management Zones and Plan

village 1 village 2

village 6

village 3

village 4village 5

village 1 village 2

village 6

village 3

village 4village 5

village 1 village 2

village 6

village 3

village 4village 5

FALUP mission2

13.04.2023

17

Time take to implement FALUPi: Prepare SIM and 2.5 D Topo

1: Village Base Geo Mapping

2: Village Boundary Mapping

3: ABD and SE data collection,

4: current land use+ forest assessment and mapping

5: Workshop: (i) review CLU, and developed strategy for (ii)land use planning and zoning

6: Mission 3: Forest and Agriculture and management Zones and Plan

Note:

1: Do not do all FALUP work in 1 village and move to the next village

2: Example: 8 villages in a GB: Task 1 & 2 ~ 1 month, Task 3 & 4 ~ 1.5 month,

Task 6 ~ 1.5 months = total of 4 +months to complete in 1 GB

Raining season

4 days1 village = 1 mont 8 villages

6 days/1 village = 1.5 mont for 8

villages

6 days1 village = 1.5 monts for 8

villages

Prepare: 1 week, meeting: 1day

13.04.2023

18

Development of FALUP Tools

13.04.2023

19

FALUP Mission 1

Village Base-Geo&Village Boundary Mapping

village 1

village 2

village 6

village 3

village 4

village 5

Used FALUP toolkit:

Tool 2.1: Introduce FALUP work to the villagers and FALUP-VC establishment.

Tool 2.2: Village Base Geo Mapping .

Tool 2.3: Discussion, negotiation, survey and delineate of village boundary

4: Development of vFALUP Tools

13.04.2023

20

Data collection, current land use and forest assessment/ mapping

FALUP mission2 village 1

village 2

village 6

village 3

village 4

village 5

Tool 3.1: Review, survey and mapping of current land use and management, land tenure, forest cover.

Tool 3.2: data collection: ABD, agriculture, forest, nature resources and socio economic (PRA/group and HH level).

Tool 3.3: Identification and analysis of problem of forest, agriculture and land, and ID of priority for village development

13.04.2023

21

Forest and Agriculture and management Zones and Plan

FALUP mission 3 village 1

village 2

village 6

village

3village

4village

5

Tool 5.1 Zoning agricultural and forest (improve/future) land use

Tool 5.2: Development of regulation relating to each zone and regulation not relate to zone

Tool 5.3: Compilation of the village FALUP report and plan.

13.04.2023

2204/13/2023

13.04.2023

23

4: TABI Plans for 2012/2013

Ponsai District:• Complete the 3 Goombans• Assist other projects to

(a)Standardize GIS and mapping(b)Adopt the same LUP methods – or some

Phoukot District:•Complete the 3 Goombans •FALUP around the Phoukodt Park•FALUP around Phun Sun•Assist other projects doing LUP: standardize methods

Pilot CLR•1 GB in Ponsai•1 GB in Phoukodt

Assist develop FALUP linked to UXO programs

Continue in Palavaek Specila Zone