Session 1: LUP Progress and Activities:
Achievements, Current and Planned
TABIthe AgroBioDiversity Initiative
13.04.2023
2
1: Introducion to TABI2: Target Villages3: Process’s developed4: Tools developed5: Plans for 2012-13
Contents of Presentation
13.04.2023
3
GOAL: to raise the status/role of AgroBioDiversity and AgroEcoSystems in the development process and for poverty reduction.
1: TABI: The AgroBioDiversity Initiative
HOW ? Supporting and facilitating initiatives and projects related to ABD in agriculture, forest and aquatic ecosystems.
FALUP: Supports/facilitates LUP which:1: includes indigenous agriculture and village forest management.2: Is realistic, practical and will actually be used by the villages.
Target Areas: Currently : Luang Prabang and Xieng Khouang Provinces
13.04.2023
404/13/2023
Link to FALUP Platform > Location MAP
www.flupplatform.la
13.04.2023
5
2: Target Villlage undertaken to date (last 2 dry seasons)
Province DistrictGoomban/Cluster
No. village
Luang Prabang PonsaiSopJia 7DoneKham 5ChomChieng 5
Xieng Khouang
PhoukodtKheung Longhang 6Tai 7Long Khan 3
2 Provinces 2 .istricts 6 Village Clusters 33 villages
13.04.2023
6
Completed in 8 Kumban of 3 districts and 3 Provinces.
Location No. village
No. Household Area (ha)
Phonexay district, LPB 18 1,644 69,949
1Sobchia GB 8 636 21,507
2Donekham GB 5 488 12,193
3 Chomchieng GB 5 520 36,249
Phoukoud district, XKH 17 1,532 107,749
1Kheng-Longhanf GB 7 427 38,667
2Longkhan GB 3 486 38,074
3Tai GB 7 619 31,008
Hom district, VTE 2 434 24,569
1Phalaveak GB 2 434 24,569
Total 7 GB 37 3,610 202,267
13.04.2023
7
Details of TABI progress to date
13.04.2023
8
Details of TABI progress to date
13.04.2023
9
Details of TABI progress to date
13.04.2023
10
Details of TABI progress to date
13.04.2023
11
Details of TABI progress to date
13.04.2023
12
Details of TABI progress to date
13.04.2023
13
Land use planning process of TABILand use planning process developed by TABI
i: Preparation of SIM and 2.5 D Topo
1: Development of Village Base-Geo Map
2: Village Boundary Mapping
3: Data Collection: socio-economic, NR
4: Current Land/forest use Mapping
5: Village-District review-strategy meeting
6: Land Management Zonation Mapping
Timing - Scheduling ?
1: do not conduct all tasks in 1 village first, then move to all task in next village, etc
2: Do some tasks in all villages, then next tasks in all villages, etc
> Example: 8 village Goomban: Task1&2=1.35 mth, Task 3 &4=1.5 mth, Task 6 = 2 mth = 5 months for full Goomban.
During wet season
4 day/1 village = 1 mth for 8 villages
6 day/1 village = 1.5 mth for 8 villages
6 day/1 village = 1.5 mth for 8 villages
Preparation: 1 week, meeting: 1 day
13.04.2023
14
3: Development of vFALUP Process
Initially (2009-2010) followed the green PLUP manual
Then saw that this was unsatisfactory for various reasons and started to develop improved process.
Key aspects of improved process:
• Work in all villages of a Goomban
• Start village networking from the beginning
• Make repeated missions to village - each mission focus on 2
aspects of LUP
• Ensure focus on current land use and forest cover
13.04.2023
15
Process of the Village Forest and Agriculture Land Use Planning
( FALUP)
Mission 1: Village Base-Geo Mapping, and Village Boundary Mapping ans Agreemtn
Mission 2: ABD and SE Data collection, current land use and forest assessment/ mapping
Workshop: (i) review CLU, and developed strategy for (ii)land use planning and zoning.
Mission 3: Forest and Agriculture Land Management Zonation and Planning
Workshop: (i) Review/discuss on FALUP, (ii) Accept the result of FALUP
13.04.2023
16
FALUP mission3
Process: FALUP Works in all villages in a Goomban in Parrallel – multiple mission
FALUP mission1
Data collection, current land use and forest assessment/ mapping
Village Base-Geo&Village Boundary Mapping
Forest and Agriculture and management Zones and Plan
village 1 village 2
village 6
village 3
village 4village 5
village 1 village 2
village 6
village 3
village 4village 5
village 1 village 2
village 6
village 3
village 4village 5
FALUP mission2
13.04.2023
17
Time take to implement FALUPi: Prepare SIM and 2.5 D Topo
1: Village Base Geo Mapping
2: Village Boundary Mapping
3: ABD and SE data collection,
4: current land use+ forest assessment and mapping
5: Workshop: (i) review CLU, and developed strategy for (ii)land use planning and zoning
6: Mission 3: Forest and Agriculture and management Zones and Plan
Note:
1: Do not do all FALUP work in 1 village and move to the next village
2: Example: 8 villages in a GB: Task 1 & 2 ~ 1 month, Task 3 & 4 ~ 1.5 month,
Task 6 ~ 1.5 months = total of 4 +months to complete in 1 GB
Raining season
4 days1 village = 1 mont 8 villages
6 days/1 village = 1.5 mont for 8
villages
6 days1 village = 1.5 monts for 8
villages
Prepare: 1 week, meeting: 1day
13.04.2023
18
Development of FALUP Tools
13.04.2023
19
FALUP Mission 1
Village Base-Geo&Village Boundary Mapping
village 1
village 2
village 6
village 3
village 4
village 5
Used FALUP toolkit:
Tool 2.1: Introduce FALUP work to the villagers and FALUP-VC establishment.
Tool 2.2: Village Base Geo Mapping .
Tool 2.3: Discussion, negotiation, survey and delineate of village boundary
4: Development of vFALUP Tools
13.04.2023
20
Data collection, current land use and forest assessment/ mapping
FALUP mission2 village 1
village 2
village 6
village 3
village 4
village 5
Tool 3.1: Review, survey and mapping of current land use and management, land tenure, forest cover.
Tool 3.2: data collection: ABD, agriculture, forest, nature resources and socio economic (PRA/group and HH level).
Tool 3.3: Identification and analysis of problem of forest, agriculture and land, and ID of priority for village development
13.04.2023
21
Forest and Agriculture and management Zones and Plan
FALUP mission 3 village 1
village 2
village 6
village
3village
4village
5
Tool 5.1 Zoning agricultural and forest (improve/future) land use
Tool 5.2: Development of regulation relating to each zone and regulation not relate to zone
Tool 5.3: Compilation of the village FALUP report and plan.
13.04.2023
2204/13/2023
13.04.2023
23
4: TABI Plans for 2012/2013
Ponsai District:• Complete the 3 Goombans• Assist other projects to
(a)Standardize GIS and mapping(b)Adopt the same LUP methods – or some
Phoukot District:•Complete the 3 Goombans •FALUP around the Phoukodt Park•FALUP around Phun Sun•Assist other projects doing LUP: standardize methods
Pilot CLR•1 GB in Ponsai•1 GB in Phoukodt
Assist develop FALUP linked to UXO programs