15.06.2022 1 Session 1: LUP Progress and Activities: Achievements, Current and Planned TABI the AgroBioDiversity Initiative

description

National LUP workshop 4.10-5.10.12, Vientiane, Lao PDR TABI LUP Progress and Activities: Achievements, Current and Planned

Transcript of Lupws session 1 progress a_TABI_eng

Page 1: Lupws session 1 progress a_TABI_eng

13.04.2023

1

Session 1: LUP Progress and Activities:

Achievements, Current and Planned

TABIthe AgroBioDiversity Initiative

Page 2: Lupws session 1 progress a_TABI_eng

13.04.2023

2

1: Introducion to TABI2: Target Villages3: Process’s developed4: Tools developed5: Plans for 2012-13

Contents of Presentation

Page 3: Lupws session 1 progress a_TABI_eng

13.04.2023

3

GOAL: to raise the status/role of AgroBioDiversity and AgroEcoSystems in the development process and for poverty reduction.

1: TABI: The AgroBioDiversity Initiative

HOW ? Supporting and facilitating initiatives and projects related to ABD in agriculture, forest and aquatic ecosystems.

FALUP: Supports/facilitates LUP which:1: includes indigenous agriculture and village forest management.2: Is realistic, practical and will actually be used by the villages.

Target Areas: Currently : Luang Prabang and Xieng Khouang Provinces

Page 4: Lupws session 1 progress a_TABI_eng

13.04.2023

404/13/2023

Link to FALUP Platform > Location MAP

www.flupplatform.la

Page 5: Lupws session 1 progress a_TABI_eng

13.04.2023

5

2: Target Villlage undertaken to date (last 2 dry seasons)

Province DistrictGoomban/Cluster

No. village

Luang Prabang PonsaiSopJia 7DoneKham 5ChomChieng 5

Xieng Khouang

PhoukodtKheung Longhang 6Tai 7Long Khan 3

2 Provinces 2 .istricts 6 Village Clusters 33 villages

Page 6: Lupws session 1 progress a_TABI_eng

13.04.2023

6

Completed in 8 Kumban of 3 districts and 3 Provinces.

Location No. village

No. Household Area (ha)

Phonexay district, LPB 18 1,644 69,949

1Sobchia GB 8 636 21,507

2Donekham GB 5 488 12,193

3 Chomchieng GB 5 520 36,249

Phoukoud district, XKH 17 1,532 107,749

1Kheng-Longhanf GB 7 427 38,667

2Longkhan GB 3 486 38,074

3Tai GB 7 619 31,008

Hom district, VTE 2 434 24,569

1Phalaveak GB 2 434 24,569

Total 7 GB 37 3,610 202,267

Page 7: Lupws session 1 progress a_TABI_eng

13.04.2023

7

Details of TABI progress to date

Page 8: Lupws session 1 progress a_TABI_eng

13.04.2023

8

Details of TABI progress to date

Page 9: Lupws session 1 progress a_TABI_eng

13.04.2023

9

Details of TABI progress to date

Page 10: Lupws session 1 progress a_TABI_eng

13.04.2023

10

Details of TABI progress to date

Page 11: Lupws session 1 progress a_TABI_eng

13.04.2023

11

Details of TABI progress to date

Page 12: Lupws session 1 progress a_TABI_eng

13.04.2023

12

Details of TABI progress to date

Page 13: Lupws session 1 progress a_TABI_eng

13.04.2023

13

Land use planning process of TABILand use planning process developed by TABI

i: Preparation of SIM and 2.5 D Topo

1: Development of Village Base-Geo Map

2: Village Boundary Mapping

3: Data Collection: socio-economic, NR

4: Current Land/forest use Mapping

5: Village-District review-strategy meeting

6: Land Management Zonation Mapping

Timing - Scheduling ?

1: do not conduct all tasks in 1 village first, then move to all task in next village, etc

2: Do some tasks in all villages, then next tasks in all villages, etc

> Example: 8 village Goomban: Task1&2=1.35 mth, Task 3 &4=1.5 mth, Task 6 = 2 mth = 5 months for full Goomban.

During wet season

4 day/1 village = 1 mth for 8 villages

6 day/1 village = 1.5 mth for 8 villages

6 day/1 village = 1.5 mth for 8 villages

Preparation: 1 week, meeting: 1 day

Page 14: Lupws session 1 progress a_TABI_eng

13.04.2023

14

3: Development of vFALUP Process

Initially (2009-2010) followed the green PLUP manual

Then saw that this was unsatisfactory for various reasons and started to develop improved process.

Key aspects of improved process:

• Work in all villages of a Goomban

• Start village networking from the beginning

• Make repeated missions to village - each mission focus on 2

aspects of LUP

• Ensure focus on current land use and forest cover

Page 15: Lupws session 1 progress a_TABI_eng

13.04.2023

15

Process of the Village Forest and Agriculture Land Use Planning

( FALUP)

Mission 1: Village Base-Geo Mapping, and Village Boundary Mapping ans Agreemtn

Mission 2: ABD and SE Data collection, current land use and forest assessment/ mapping

Workshop: (i) review CLU, and developed strategy for (ii)land use planning and zoning.

Mission 3: Forest and Agriculture Land Management Zonation and Planning

Workshop: (i) Review/discuss on FALUP, (ii) Accept the result of FALUP

Page 16: Lupws session 1 progress a_TABI_eng

13.04.2023

16

FALUP mission3

Process: FALUP Works in all villages in a Goomban in Parrallel – multiple mission

FALUP mission1

Data collection, current land use and forest assessment/ mapping

Village Base-Geo&Village Boundary Mapping

Forest and Agriculture and management Zones and Plan

village 1 village 2

village 6

village 3

village 4village 5

village 1 village 2

village 6

village 3

village 4village 5

village 1 village 2

village 6

village 3

village 4village 5

FALUP mission2

Page 17: Lupws session 1 progress a_TABI_eng

13.04.2023

17

Time take to implement FALUPi: Prepare SIM and 2.5 D Topo

1: Village Base Geo Mapping

2: Village Boundary Mapping

3: ABD and SE data collection,

4: current land use+ forest assessment and mapping

5: Workshop: (i) review CLU, and developed strategy for (ii)land use planning and zoning

6: Mission 3: Forest and Agriculture and management Zones and Plan

Note:

1: Do not do all FALUP work in 1 village and move to the next village

2: Example: 8 villages in a GB: Task 1 & 2 ~ 1 month, Task 3 & 4 ~ 1.5 month,

Task 6 ~ 1.5 months = total of 4 +months to complete in 1 GB

Raining season

4 days1 village = 1 mont 8 villages

6 days/1 village = 1.5 mont for 8

villages

6 days1 village = 1.5 monts for 8

villages

Prepare: 1 week, meeting: 1day

Page 18: Lupws session 1 progress a_TABI_eng

13.04.2023

18

Development of FALUP Tools

Page 19: Lupws session 1 progress a_TABI_eng

13.04.2023

19

FALUP Mission 1

Village Base-Geo&Village Boundary Mapping

village 1

village 2

village 6

village 3

village 4

village 5

Used FALUP toolkit:

Tool 2.1: Introduce FALUP work to the villagers and FALUP-VC establishment.

Tool 2.2: Village Base Geo Mapping .

Tool 2.3: Discussion, negotiation, survey and delineate of village boundary

4: Development of vFALUP Tools

Page 20: Lupws session 1 progress a_TABI_eng

13.04.2023

20

Data collection, current land use and forest assessment/ mapping

FALUP mission2 village 1

village 2

village 6

village 3

village 4

village 5

Tool 3.1: Review, survey and mapping of current land use and management, land tenure, forest cover.

Tool 3.2: data collection: ABD, agriculture, forest, nature resources and socio economic (PRA/group and HH level).

Tool 3.3: Identification and analysis of problem of forest, agriculture and land, and ID of priority for village development

Page 21: Lupws session 1 progress a_TABI_eng

13.04.2023

21

Forest and Agriculture and management Zones and Plan

FALUP mission 3 village 1

village 2

village 6

village

3village

4village

5

Tool 5.1 Zoning agricultural and forest (improve/future) land use

Tool 5.2: Development of regulation relating to each zone and regulation not relate to zone

Tool 5.3: Compilation of the village FALUP report and plan.

Page 22: Lupws session 1 progress a_TABI_eng

13.04.2023

2204/13/2023

Page 23: Lupws session 1 progress a_TABI_eng

13.04.2023

23

4: TABI Plans for 2012/2013

Ponsai District:• Complete the 3 Goombans• Assist other projects to

(a)Standardize GIS and mapping(b)Adopt the same LUP methods – or some

Phoukot District:•Complete the 3 Goombans •FALUP around the Phoukodt Park•FALUP around Phun Sun•Assist other projects doing LUP: standardize methods

Pilot CLR•1 GB in Ponsai•1 GB in Phoukodt

Assist develop FALUP linked to UXO programs

Continue in Palavaek Specila Zone