N OLUTIONSOIZ S LLCAn EnergySolutions Company
DecommissioningStatus Update August 2013
Zion Community Advisory PanelPatrick Daly
ZionSolutions General Manager
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCAgenda
• Status update – Financial update Patrick Daly
• Dry Fuel Storage Status Brian Wood
2
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCSafety Status
• 4 recordable injuries this year– 2 slips on ice– 2 pinched fingers
3
Segmenting Equipment, Aux Bldg
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLC2013 Major Work Activity
• Complete Construction of the ISFSI• Accept fuel transfer equipment• Commence fuel transfer operations• Complete U-2 reactor internals segmentation• Package GTTC waste from U-2• U-1 reactor internals segmentation• Continue equipment removal from Aux building• Continue radiological release of balance of plant• LTP development & site characterization• Shipment of B&C waste to WCS • Rail shipments of LLW to Clive (40 cars)
4
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCReactor Vessel Internals Segmentation
• U-2 completing work on lower internals, will follow with GTTC waste
• Work continues with the BMT
• Preparing for Rx Vsl segmentation early 2014
5
Cutting on Lower internalsUnit 1
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCInternals Segmentation
6
Thermal Shield cuttingUnit 2
C-HORCE
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCAux Building Equipment Removal
7
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCBrokk use in the Aux Bldg
8
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCWaste Operations 2013
9
15 railcars, ~2.6M pounds, ~ 60,000 ft34 casks, ~54,000 pounds, ~12,000 ft3WCS1 cask shipment, ~ 11,100 pounds, ~ 120 ft3
15 railcars, ~2.6M pounds, ~ 60,000 ft34 casks, ~54,000 pounds, ~12,000 ft3WCS1 cask shipment, ~ 11,100 pounds, ~ 120 ft3.
15 railcars, ~2.6M pounds, ~ 60,000 ft34 casks, ~54,000 pounds, ~12,000 ft3WCS1 cask shipment, ~ 11,100 pounds, ~ 120 ft3.
Class A waste disposal for 2013Is ~ 72,000 lbs
B&C disposal, 1 cask
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCISFSI Construction
10
VBS
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCProperty Characterization Non-Impacted(NI) Area Surveys
238 Acres to be evaluated outside the security fence to verify they are radiologically clean.
963,000 m2 (10 Million ft2)
Why : NRC requires data to confirm the areas to be considered non-impacted.
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCSample Methodology
ISOCS measurements (In-Situ Object Counting
System)Measurements with hand-
held instruments
Walkover Survey
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCDisbursements and Balances
ZionSolutions Nuclear Decommissioning Trust Balance Roll Forward – Cash Basis
As of June 30, 2013
ZionSolutions Nuclear Decommissioning Trust Balance Roll Forward – Cash Basis
As of June 30, 2013
ZionSolutions Nuclear Decommissioning Trust Balance Roll Forward – Cash Basis
As of June 30, 2013
ZionSolutions Nuclear Decommissioning Trust Balance Roll Forward – Cash Basis
As of June 30, 2013
ZionSolutions Nuclear Decommissioning Trust Balance Roll Forward – Cash Basis
As of June 30, 2013 ($ millions) ($ millions)
Beginning Balance Beginning Balance Beginning Balance $ 801.4 $ 801.4
Earnings - Net of Taxes & FeesEarnings - Net of Taxes & FeesEarnings - Net of Taxes & Fees 77.8 77.8
DisbursementsDisbursementsDisbursementsDisbursements (369.2)
Ending Balance Ending Balance Ending Balance Ending Balance $ 510.0
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLC
ZionSolutionsMajority of Expense Incurred
As of June 30, 2013
ZionSolutionsMajority of Expense Incurred
As of June 30, 2013Project Management
Procurement of Casks & Canisters for Dry Fuel Storage
Planning & Preparation for Spent Fuel Storage
ISFSI Pad Design & Construction
Waste Disposal
Asbestos Remediation
Reactor Internals Segmentation Preparation
Major Expense Categories
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLC
ZionSolutionsMajority of Expense Incurred
As of June 30, 2013
ZionSolutionsMajority of Expense Incurred
As of June 30, 2013Plant Maintenance & Security
Unit 1 & 2 Containment Preparation & Support
Unit 1 & 2 Reactor Vessel
Large Components
Rail Improvements
Establish Temporary Utilities
Site Characterization
Major Expense Categories (cont.)
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCQuestions?
16
Thursday, July 31, 14
N OLUTIONSOIZ S LLCAn EnergySolutions Company
Fuel Transfer Preparations
Brian Wood
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCFuel Transfer Preparations
• All 2,226 used fuel assemblies have been inspected and repaired, if necessary.
• Received 23 of 61 transportable storage canisters on-site• Training & NRC required dry runs scheduled or completed
– Canister processing Completed July 10– Stack-up and transport scheduled Sep 9– Canister welding scheduled Sep 9– Mock fuel loading and unloading Oct 3
18
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCRobotic Welder during mock up training
19
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCFuel Transfer Preparations
• Fuel Transfer Operations (FTO) craft and supervision undergoing classroom, OJT, and mock-up training
• 4-10 person crews working 4 days on - 4 days off• Once FTO commences, 24 hours, 7 days per week• 54 week campaign with maintenance and weather
contingencies• Roughly 1 canister every 5 days• First fuel movements scheduled on or about November 15th
subject to NRC final inspection
20
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCCanister Overpack - VCC
21
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCFuel Transfer Operations
• Day 1 Prepare canister for over-pack and locate into fuel handling building
• Day 2 Load fuel into the canister• Day 3 Weld the canister• Day 4 Vacuum dry and backfill the canister with
helium• Day 5 Stack-up and transport the canister to the
independent spent fuel storage installation (ISFSI)
22
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCVCC Transport to ISFSI
23
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCFuel transfer preparations
24
Animation Fuel Transfer Operations
Thursday, July 31, 14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCQuestions?
25
Thursday, July 31, 14