Post on 13-Jun-2020
SITE BOUNDARY OF
SWHSTW SITE FOR
FURTHER EXPANSION
SITE BOUNDARY OF
EXISTING SWHSTW
FACILITIES NEWLY
CONSTRUCTED IN
PHASE 1 & PHASE 2
LEGEND
S5
A4
W4
W4
W4
W4
W4
A1W5
W5 W5
W5 W5
W5 W5
W5W5
A1
A1S2
W1
A1
A1
W2 W2
W2
W2
W2
W2W2
A2
A6
A10
A7
A8
A9
A13
A11
A12
W2
A5
A2W1
W2
W4
W5
S1
S2
S3
S4
S5
S6
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13
W3
A3A3
S1
S1
W3
W3
S3 S4 S4
S4S4
S6
S3
S3
S3
S3
S3
A14
A14
A1
Figure 6.8
-
LM 04/13
- -
1:1250 ON A1
1:2500 ON A3
Layout Plan of the ProposedSewage Treatment WorksExtension in FLN NDA
EXISTING FACILITIES
TO BE RETROFITTED
AND E&M EQUIPED
Drawn
Scale
Checked Approved
Date
Rev Description Date
Drawing Title Drawing No.Job Title
˝`˜¾„⁄‡Ì˝ØÕ„˚ð
CIVIL ENGINEERING
AND DEVELOPMENT
DEPARTMENT
Agreement No. CE 61/2007 (CE)
North East New Territories New Development Areas
Planning and Engineering Study - Investigation