Kenya Electricity Generating Company Limited
KGN-HYD-13-2018
TENDER FOR SUPPLY, INSTALLATION, TESTING AND
COMMISSIONING OF INDUSTRIAL UNINTERRUPTIBLE POWER
SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE &
TURKWEL POWER STATIONS
ADDENDUM NO. 1
Kenya Electricity Generating Company Limited,
Stima Plaza Phase III, Kolobot Road, Parklands,
P.O. Box 47936,
Nairobi, Kenya.
www.kengen.co.ke
April 2018
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 2 of 42
AMENDED CLAUSES
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 3 of 42
AMENDED CLAUSES
APPENDIX TO INSTRUCTIONS TO TENDERERS
TDS clauses 1 (1.1-page 12), clause 3. (3.2- page 13) and clause 5 (5.1 page14-
17) have been amended as per table below
TDS
Ref.
No
ITT
Clause
No
Amendments of, and Supplements to, Clauses in the Instruction to Tenderers
A. INTRODUCTION
1.1 Date and Time for submission is:
Date: 10th May 2018
Time: 2.00 p.m. (14:00 hrs)
C. PREPARATION OF TENDERS
3.2 Bidder shall submit their offer with all the following documents below
arranged as per the order given below
1) The Form of Tender;
2) Price Schedules (the three schedules)
3) Copy of certificate of incorporation /Registration.
4) Copy of AGPO certificate for youth
5) Copy of NCA registration and practicing certificate (NCA 8 and
above)
6) Copy of ERC registration certificate (class C and above)
7) Tender securing declaration form
8) Mandatory confidential business questionnaire
9) Manufacturer’s authorization forms for each of the following
(i) Industrial UPS system
(ii) Industrial VRLA long life batteries
10) Duly completed and signed Mandatory site visit certificate
11) Copy of Valid Tax Compliance Certificate
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 4 of 42
TDS
Ref.
No
ITT
Clause
No
Amendments of, and Supplements to, Clauses in the Instruction to Tenderers
12) Signed CV of personnel proposed for installation work
13) Signed Warranty and after sales support from manufacturer or
manufacturer representative/ local agent
14) Signed clarifications and addendums
15) Copy of Type test reports & certificates certified by
EU/USA/Canadian National Standards and Testing Authority (NSTA)
or by a third party (not manufacturer or manufacturer subsidiary)
Reputable Testing Authority accredited by EU/USA/Canadian
National Standards and Testing Authority (NSTA) for:
(i) Battery performance type test in accordance to IEC 60896 –
21/22
(ii) UPS performance type tests in accordance to IEC/EN
62040-3
16) Bidders technical offer composed of the following
(i) Duly filled schedule of requirements (two schedules)
(ii) Proposed UPS single line diagram
(iii) Proposed UPS and battery cabinets layout diagram
(iv) Method statement
(v) Programme of works
(vi) UPS manufacturer technical manuals, datasheets, catalogues
and drawings
(vii) Batteries manufacturer technical manuals, datasheets,
catalogues and drawings
5 5.1 Evaluation Criteria
A) Preliminary/Mandatory Evaluation
1) The following documents shall be examined. Each document below
MUST be submitted, duly filled, signed & stamped, authentic and valid
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 5 of 42
TDS
Ref.
No
ITT
Clause
No
Amendments of, and Supplements to, Clauses in the Instruction to Tenderers
for tender submission to be responsive.
a) Duly completed Bill of Quantities, Signed, and Stamped with
date on every page.
b) Duly completed Tender Forms, Signed and stamped with date.
c) Copy of certificate of incorporation /Registration.
d) Copy of AGPO certificate for youth
e) Copy of NCA registration and practicing certificate (NCA 8 and
above)
f) Copy of ERC registration certificate (class C and above)
g) Duly filled and signed mandatory confidential business
questionnaires provided
h) Valid manufacturer authorisation duly filled and signed by
manufacturer for each of the following
(i) Industrial UPS system
(ii) Industrial VRLA long life batteries
i) Duly completed and signed Mandatory site visit certificate
j) Copy of Valid Tax Compliance Certificate
k) Duly filled and signed Tender Securing Declaration form
l) Signed Warranty and after sales support from manufacturer or
manufacturer representative/ local agent
m) Duly filled schedule of requirements (two schedules)
n) Type test reports & certificates certified by EU/USA/Canadian
National Standards and Testing Authority (NSTA) or by a third
party (not manufacturer or manufacturer subsidiary)
Reputable Testing Authority accredited by EU/USA/Canadian
National Standards and Testing Authority (NSTA) for:
(i) Battery performance type test in accordance to IEC 60896 –
21/22
(ii) UPS performance in accordance to IEC/EN 62040-3
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 6 of 42
TDS
Ref.
No
ITT
Clause
No
Amendments of, and Supplements to, Clauses in the Instruction to Tenderers
o) Proposed UPS single line diagram
p) Proposed UPS and battery cabinet layout diagrams
2) Bid offer shall also be examined to ensure:
a) The Tender has been signed by the person lawfully authorized
to do so;
b) Completeness of Tender – submission of the required number
of copies,
c) sequential organization of the bid document
d) Pagination/serialization of all pages of the bid document
Note:
Only tenders which meet the preliminary requirements shall be subjected to
technical evaluation and shall not subsequently be made responsive by the
tenderer correcting the nonconformity
(B) Technical Evaluation
I
t
e
m
Description Requirement Bidder
complianc
e (yes/no)
1 Compliance
to
Specification
All UPS equipment and Battery
banks offered shall comply fully
with the tender specifications.
All entries in the schedule of
requirements TENDERER’S OFFER
column have been filled
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 7 of 42
TDS
Ref.
No
ITT
Clause
No
Amendments of, and Supplements to, Clauses in the Instruction to Tenderers
Any empty cell/entry shall lead to
rejection of the bid.
All items in the schedules of
requirements have been supported
by manufacturer technical
datasheets, catalogues, manuals,
drawings or test reports
Bidder meets or exceeds all the
employer requirements in the
schedules of requirements
All items in the price schedule have
been quoted for
The offered UPS shall be Industrial
designed for industrial environment
of: temperature 5°C - 40°C
continuous, humidity ≥90%,
altitude ≥1000m without derating
and vibration 0.2g. standards
3 Evidence of
after sales
support and
warranty
services
Attach manufacturers’ statement of
commitment to extend warranty for
the equipment to be supplied.
4 Method
statement
and
programme
of works
Bidder shall submit comprehensive
method statement on how the works
will be implemented and a complete
program of works. The method
statement shall cover: -
• Preliminary works
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 8 of 42
TDS
Ref.
No
ITT
Clause
No
Amendments of, and Supplements to, Clauses in the Instruction to Tenderers
• UPS and Battery banks
installation works.
• Test and Commissioning
procedures.
• Safety arrangement
• Waste management
Submitted programme of works is
complete, covers all items of the
requirements and fits the offered
delivery time
The method statements are
comprehensive and pragmatic
Delivery time does not exceed nine
months
5 Qualified
full time
Technical
Staff.
1. project Manager with
Degree /Higher National Diploma
and minimum 5 years’ experience
in similar works
2. Site supervisor with Diploma
Certificate and at least 5 years’
experience in similar works.
CVs should be signed by authorized
representative of the bidder. The
CVs should include mobile
telephone and email contacts of the
staff. KenGen will verify
information given.
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 9 of 42
TDS
Ref.
No
ITT
Clause
No
Amendments of, and Supplements to, Clauses in the Instruction to Tenderers
7 Manufacture
r
Authorisatio
n
Valid, authentic and signed
manufacturer authorisation has
been provided for the following
1. Complete Industrial UPS
system
2. VRLA industrial type long life
batteries
8 Warranty 1-year warranty from date of
commissioning.
9 Preliminary
drawings
submitted
The UPS SLD clearly shows the
offered UPS components and meets
requirements
The offered cabinets shall fit the
available space
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 10 of 42
SPECIFICATIONS AND BILLS OF QUANTITIES
GENERAL REQUIREMENTS
2. SCOPE OF WORK.
Scope of work clause (g) (page 38) have been annulled and replaced with the
clause below
f) ……..
g) Decommissioning and buy back of all battery banks that shall be
replaced during the installation works for Gitaru, Kindaruma,
Kiambere, Masinga, Kamburu and Turkwel. The tenderer shall
quote buy back price along with the offer for the old battery banks
as per the existing system with the following specifications:
Station Number
of
batteries
Battery rating
AH
Battery Type
Masinga 72 57.2
Kamburu 108 90
Gitaru 72 74 YUASA, UK SWL1850
Turkwel 72 74 YUASA, UK SWL1850
Kiambere 72 74 YUASA, UK SWL1850
Kindaruma 72 75 HIGH POWER SERIES
Total 468 - -
• Some of Masinga batteries are in Kindaruma
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 11 of 42
TECHNICAL SPECIFICATIONS OF UPS SYSTEMS
5.12. Battery specification
The first six paragraphs of clause 5.12 in the tender (page 49-50) have been annulled and replaced
with the clauses below
5.12.0. Battery system general requirements
h) The battery voltage and capacity shall be such as to fulfil the
inverter input power requirements when the inverter is delivering
its rated output (VA), for an autonomy time of 4hours.
i) The battery system shall consist of two battery banks each with its
own battery cabinet. Each battery bank shall consist of valve
regulated, lead acid batteries (VLRA), with each battery rated at
12V. Batteries shall be connected in series to form a batteries string
one or more parallel battery strings shall be connected to form a
battery bank of a high DC voltage suitable for the UPS rating.
j) Each battery bank shall offer an autonomy of two hours at rated
UPS output giving a total of 4 hours for both battery banks. The
nominal ampere-hour (Ah) capacity of the battery system supplied
with the UPSs shall be for 4hr autonomy at full load The Nominal
Ampere-hour capacity of the battery shall be calculated in line
with a battery manufacturer’s approved battery sizing tool and
shall include all necessary allowances as specified in the datasheet,
required to compensate ageing effects that result in the progressive
loss of capacity
k) Each battery bank shall have a fused isolator for connecting the
battery bank to the UPS.
l) A cable shall be provided for connecting each battery bank to the
UPS. Cable shall be armoured and rated for 120% of maximum
battery bank current.
m) Estimated battery bank cable length is 25m for Masinga and 50m
for Kamburu
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 12 of 42
TECHNICAL SPECIFICATIONS FOR BATTERIES
.
The technical specifications for batteries in the tender (page 60-61) have been
annulled and replaced with clauses below
1.1 General requirements
1.1.1 The contractor shall supply batteries to Kiambere, Gitaru, Kindaruma and
Turkwel. These batteries shall be installed to operate the UPS’es already
installed in these stations.
1.1.2 The contractor shall also buy all the existing UPS batteries in Kiambere,
Gitaru, Kindaruma, Kamburu, Masinga and Turkwel.
1.1.3 The existing batteries are housed in two cabinets for each station other
than Kamburu which has four cabinets.
1.1.4 The contractor shall collect (buy back) all the existing batteries in all the
six stations if awarded the tender.
1.1.5 The existing battery cabinets shall be re used to house the new batteries
to be supplied in Kiambere, Gitaru, Kindaruma and Turkwel.
1.1.6 For Kaburu and Masinga the battery cabinets shall be removed and new
battery cabinets for the new UPS’es installed. The removed battery cabinet
shall be property of the employer and are not available for buy back.
1.2 Existing Batteries
1.2.1 General battery condition
1.2.1.1 The existing UPS systems at Gitaru, Kindaruma, Kiambere and
Turkwel are each rated at 15kVA. The UPSs are configured to
operate with VRLA maintenance free batteries.
1.2.1.2 The cells are housed in existing cubicles with tray dimensions of
L×W×H = 285 x 165 x 300mm
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 13 of 42
1.2.1.3 Condition of the Batteries in Masinga and Kamburu was shown to
bidders during site visit
1.2.1.4 Battery quantities
Station Number of
batteries
Battery rating
AH
Battery age
Years
Masinga 72 57.2 11
Kamburu 108 90 11
Gitaru 72 74 11
Turkwel 72 74 11
Kiambere 72 74 11
Kindaruma 72 75 11
• Some of Masinga batteries are in Kindaruma
1.2.2 Gitaru batteries rating and condition are as follows
1.2.2.1 Battery AH rating is 74AH
1.2.2.2 Battery manufacturer and model: YUASA UK, SWL1850
1.2.2.3 Battery age: ~11 years 1.2.2.4 Battery condition
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 14 of 42
1.2.2.5 Battery Cabinet
1.2.3 Kiambere batteries rating and condition are as follows
1.2.3.1 Battery AH rating is 74AH
1.2.3.2 Battery manufacturer and model: YUASA UK, SWL1850 1.2.3.3 Battery age: ~11 years
1.2.3.4 Battery condition
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 15 of 42
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 16 of 42
1.2.3.5 Battery Cabinet
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 17 of 42
1.2.4 Kindaruma batteries rating and condition are as follows
1.2.4.1 Battery AH rating is 75AH
1.2.4.2 Battery manufacturer and model: High power series 1.2.4.3 Battery age: ~11 years
1.2.4.4 Battery condition
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 18 of 42
1.2.4.5 Masinga batteries currently in Kindaruma
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 19 of 42
1.2.4.6 Battery cabinet
(a) Kindaruma battery cabinets are similar to what was shown in
Masinga
1.2.5 Turkwel batteries rating and condition are as follows
1.2.5.1 Battery AH rating is 74AH
1.2.5.2 Battery manufacturer and model: YUASA UK, SWL1850 1.2.5.3 Battery age: ~11 years
1.2.5.4 Battery condition
1.2.5.5 Battery cabinet
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 20 of 42
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 21 of 42
1.3 New Batteries Requirements
1.3.1 Specifications for batteries that follow are applicable to batteries to be supplied to Kiambere, Gitaru, Kindaruma and Turkwel that are to operate with already existing UPS’ es in these stations.
1.3.2 The cells shall be housed in existing cubicles with tray dimensions of
L×W×H = 285 x 165 x 300mm
1.3.3 The battery shall be valve regulated, lead acid batteries (VLRA).
1.3.4 The new batteries shall be sized (physical dimensions) to fit the existing
battery cabinets
1.3.5 Batteries shall meet the requirements below
BATTERY CELL UNIT SPECIFICATION
Battery capacity: C10 @ 20°C Ah 74
Nominal voltage V 12
Optimum battery temperature °C 20
Design life @ 20°C years >10
Operating temperature
Charge °C -15 to 50
Discharge °C -20 to 60
CELL casing material ABS
Terminal type Lead post with brass
insert C
Approx. Internal Resistance mΩ 6
Maximum Short Duration Discharge Current
(1min)
A 600
Percentage charge retention at 20°C
1month % 97
3 months % 91
6 months % 85
Battery type VRLA
Number of cells
Kiambere Pcs 75
Gitaru Pcs 75
Kindaruma Pcs 75
Turkwel Pcs 75
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 22 of 42
TOTAL Pcs 300
Charging
Recharge voltage V 13.6
Floating voltage V 12
Recharge current A 10
1.3.6 The batteries shall be industrial type from reputable manufacturers
meeting the following Standards
Subject Standard Reference Standard Title
Environment
& Safety IEC/EN 60068-2-32
Basic Environmental Testing procedures – Part
2
IEC 60695-11-10 Fire Hazard Testing – Part 11-10
Performance IEC 60896 - 22 Stationary Lead Acid Batteries – Part 22: Valve
Regulated types - Requirements
Testing IEC 60896 - 21
Stationary Lead Acid Batteries – Part 22: Valve
Regulated types – Methods of tests
IEC 61056-1 Shock Test (Drop Test) and Vibration Test
1.3.7 Type test reports & certificates certified by EU/USA/Canadian National
Standards and Testing Authority (NSTA) or by a third party (not
manufacturer or manufacturer subsidiary) Reputable Testing Authority
accredited by EU/USA/Canadian National Standards and Testing
Authority (NSTA) shall be provided for battery performance type test in
accordance to IEC 60896 – 21/22
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 23 of 42
SCHEDULE OF REQUIREMENTS
The Schedule of requirements in the tender (page 62-68) have been annulled
and replaced with schedules and clauses below
1.1 CONDITIONS FOR FILLING THE SCHEDULES
1.1.1 All entries in the TENDERER’S OFFER column MUST be filled, any empty
cell/entry shall lead to rejection of the bid.
1.1.2 All bidders’ responses MUST be supported by manufacturer technical
datasheets, manuals or catalogues for them to be considered by the
employer. Responses not supported by manufacturer data
sheets/catalogue/manual shall be invalid
1.2 TECHNICAL SCHEDULE 1
20 KVA INDUSTRIAL UPS SYSTEMS (3) FOR KAMBURU (2) AND MASINGA (1)
INDUSTRIAL UPS SYSTEM UNIT EMPLOYER REQUIREMENT TENDERER’S OFFER
GENERAL – – –
Quantity required Unit Three (3)
System Power rating kVA Twenty (20)
Type - Industrial UPS for industrial
environment (temperature,
humidity, vibration)
UPS power connections - 3 Phase In/ Single Phase Out
Number of converter modules Unit Two (2)
Topology Online double conversion
Power Converter Configuration Redundant - 2N
Industrial UPS type Modular
Power Converter layout withdrawable (draw out)
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 24 of 42
INDUSTRIAL UPS SYSTEM UNIT EMPLOYER REQUIREMENT TENDERER’S OFFER
Number of battery banks per UPS
unit
Unit Two (2)
Number of UPS panels per UPS unit no One (1)
Number battery bank cabinets per
UPS unit
no Two (2)
INPUT SPECIFICATIONS – – –
Input power factor 0.99
Input Voltage V 3X415+N
Total Harmonic Distortion (THDI) % ≤4%
Connections L1, L2, L3, N
OUTPUT SPECIFICATIONS – – –
Rated output voltage V 1 × 240 V+N
Output range % ±10
FREQUENCY Hz 50
Output voltage distortion % <4
Overload Capacity % 150% 1min, 125% 10min
Output short capability A 2.7 x Inom
Power factor 0.95
Crest factor 3:1
STATIC BYPASS SPECIFICATIONS – – –
Rated voltage V 1 × 240 V+N
FREQUENCY Hz 50
Rated capacity as % UPS rating % 100
Overload Capacity % 110 continuous
Static bypass transfer time ms <6
MANUAL BYPASS SWITCH (MBS): – – –
Connections L, N
Voltage rating V 1 × 240 V+N
Frequency Hz 50
Rated current A 200
MBS AUX contact At least 1CO
ENVIRONMENT AND PHYSICAL
FEATURES
– – –
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 25 of 42
INDUSTRIAL UPS SYSTEM UNIT EMPLOYER REQUIREMENT TENDERER’S OFFER
Storage temperature °C -25 to 70
Operating temperature °C 5 to 45
Humidity % 5 to 95, without
condensation
Altitude m 1000m without derating
Degree of protection IP42
Colour RAL 7035
Cable entry Bottom
Operating and maintenance access Front access
Ventilation (N+1 Redundant
ventilation fans)
Forced ventilation with
monitored fans
UPS maximum Panel dimensions – – –
Height mm 2200
Width mm 1200
Length mm 800
Maximum Weight Kg Max 650
Lifting Eyes Required
STANDARDS – – –
Safety IEC / EN 62040-1
Electromagnetic
Compatibility
IEC / EN 62040-2
Performance IEC / EN 62040-3
Environmental aspects IEC/EN 62040-4
Manufacturing ISO 9001:2015, ISO
14001:2015, OHSAS
18001
GALVANIC ISOLATION
TRANSFORMER
– – –
At Rectifier input Required
At Inverter output Required
Integrated back feed protection Required
INDUSTRIAL HMI INTERFACE – – –
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 26 of 42
INDUSTRIAL UPS SYSTEM UNIT EMPLOYER REQUIREMENT TENDERER’S OFFER
with graphical display, control
push keys, UPS operating status
indication and programmable
alarm section
Required
CONTROLLER INTERFACE TO
EMPLOYER SCADA
– – –
Modbus TCP/IP with Ethernet
port
Required
Modbus RS-485 with terminal
connection
Required
Detailed Configuration manual Required
USER CONFIGURABLE (RELAY)
INPUTS/ OUTPUTS
– – –
a) Input signals, Minimum No. Three (3)
b) Output signals,
Minimum
No. Nine (9)
ALARM LED INDICATIONS – – –
a) Mains input failure Required
b) Battery Low Required
c) Battery discharged Required
d) Battery disconnected Required
e) MBS Closed Required
f) Over temperature Required
g) UPS module Fan failure Required
h) Spare Required
PROTECTION FUNCTIONS – – –
1. Manual bypass switch
closed
Required
2. Over temperature Required
3. Fan failure Required
4. Main input failure Required
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 27 of 42
INDUSTRIAL UPS SYSTEM UNIT EMPLOYER REQUIREMENT TENDERER’S OFFER
5. Bypass operation Required
6. Battery operation Required
7. Battery low Required
8. Battery disconnected Required
9. Input breaker opened Required
10. Bypass breaker opened Required
11. MBS closed Required
12. Overload Required
13. Common alarm Required
14. Manual bypass switch
closed
Required
BATTERY CHARGER – – –
Battery charger rating To be sized for a full battery
recharge from 20% -100%
SoC in six hours with a
standing load of 50%
(10KVA) connected to the
UPS
Battery charger voltage rating V Bidder to state
Battery charger current rating A Bidder to state
BATTERIES – – –
Safety standard compliance IEC/EN 60068-2-32
IEC 60695-11-10
Performance standard compliance IEC 60896 - 22
Testing standard IEC 60896 - 21
IEC 61056-1
Battery type Industrial VRLA Battery
Battery Nominal Voltage V 12V
Ampere-Hour Rating @ 20°C Bidder to state
Battery temperature sensor Required
Temperature compensation - Required
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 28 of 42
INDUSTRIAL UPS SYSTEM UNIT EMPLOYER REQUIREMENT TENDERER’S OFFER
Guaranteed battery operating life
at 20°C temperature
years >Ten (10)
Battery Autonomy @100% load Hours Four(4)
OTHER FEATURES – – –
Panel earthing Required
Cold start Required
Schematic drawings interfaced to
employer drawings
Required
Detailed assembly, installation and
service manuals
Required
Assembly, installation layout
drawings
Required
Battery capability test at site Required
1.3 TECHNICAL SCHEDULE 2
BATTERIES for Gitaru, Kindaruma, Kiambere and Turkwel
All the batteries supplied for the all the four stations shall be of the same exact rating of 74Ah
FEATURES UNIT EMPLOYER
REQUIREMENT
TENDERER’S
OFFER
Battery type - Same as existing or
equivalent. Bidder
to state the offered
type, model and
country of
manufacture
Battery capacity: C10 @ 20°C Ah 74
Nominal voltage V 12
Optimum battery temperature °C 20
Operating temperature – – –
Charge °C -15 to 50
discharge °C -20 to 60
CELL casing material ABS
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 29 of 42
FEATURES UNIT EMPLOYER
REQUIREMENT
TENDERER’S
OFFER
Terminal type Lead post with
brass insert C
Approx. Internal Resistance mΩ 6
Maximum Short Duration Discharge Current
(1min)
A 600
Percentage charge retention at 20°C – – –
1month % 97
3 months % 91
6 months % 85
Battery type Industrial VRLA
Number of battery cells required Pcs 300
Charging – – –
Rating Ah 74
Recharge voltage V 13.6
Floating voltage V 12
Recharge current A 10
Battery capability test at site Required
Guaranteed battery operating life at 20°C
temperature
years >Ten (10)
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 30 of 42
1.4 BATTERY TESTING EQUIPMENT 1.4.1 The tenderer shall supply a battery analyzer: type Fluke BT521 together
with all accessories necessary for its operation.
1.4.2 The tenderer shall supply Spectro CA-12 Battery Rapid Tester together
with all accessories for testing 12V, 10-500Ah batteries
1.5 METHOD STATEMENT AND PROGRAMME OF WORKS Bidder shall submit comprehensive method statement on how the works will be
implemented and a complete program of works.
1.5.1 The method statement shall cover:
1.5.1.1 Preliminary works
1.5.1.2 UPS and Battery banks installation works.
1.5.1.3 Test and Commissioning procedures.
1.5.1.4 Safety arrangement
1.5.1.5 Waste management
1.5.2 Programme of works shall be provided in a Gantt chart format covering
all the works in a chronological order
1.6 MANUFACTURER AUTHORISATION Valid, authentic and signed manufacturer authorisation to be provided as per the
form provided for the following
1.6.1 Complete Industrial UPS system
1.6.2 VRLA industrial type long life batteries
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 31 of 42
PRICE SCHEDULES
The price schedules in the tender (page 69-71) have been annulled and
replaced with schedules and clauses below
1.1 General requirements 1.1.1 The tenderer shall complete all schedules. Schedules shall be read in
conjunction with the specification.
1.1.2 The total prices in the Main Summary of price schedules shall be deemed
to include for the whole of the contract works in accordance with the
specification.
1.1.3 Any prices omitted from any section or part of prices schedule shall be
deemed to have been included in another section of part.
1.1.4 All prices shall be shown inclusive of duty and of all taxes current at the
time of tendering.
1.1.5 The FINAL/ DISCOUNTED OFFER price of the offer shall be calculated as
follows:
𝐃𝐈𝐒𝐂𝐎𝐔𝐍𝐓𝐄𝐃 𝐎𝐅𝐅𝐄𝐑
= 𝐩𝐫𝐢𝐜𝐞 𝐒𝐮𝐩𝐩𝐥𝐲 𝐎𝐟 𝐔𝐏𝐒’𝐬 & 𝐒𝐜𝐚𝐝𝐚 𝐁𝐚𝐭𝐭𝐞𝐫𝐢𝐞𝐬 𝐓𝐨𝐭𝐚𝐥
− 𝐓𝐨𝐭𝐚𝐥 𝐩𝐫𝐢𝐜𝐞 𝐎𝐟𝐟𝐞𝐫 𝐟𝐨𝐫 𝐛𝐮𝐲 𝐛𝐚𝐜𝐤 𝐨𝐟 𝐁𝐚𝐭𝐭𝐞𝐫𝐢𝐞𝐬
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 32 of 42
1.2 UPS and batteries Price Schedule
NO
.
Item Description
UO
M
Qu
an
tity
Basi
c U
nit
Pri
ce
excl
usi
ve
all
tax
es a
nd
oth
er l
evie
s
Tax
es a
nd
oth
er l
evie
s
(sp
ecif
y)
Un
it P
rice
in
cl.
of
all
tax
es &
lev
ies
Tota
l Pri
ce i
ncl
usi
ve
of
all
lev
ies/
Tax
es
SUPPLY OF UPS’S and BATTERY BANKS – – – – – –
1. 20kVA UPS system complete with battery bank lot 3
2 Delivery to site, Installation, testing and commissioning
works of two (2) 20kVA UPS systems complete with
battery banks at Kamburu Power Station.
Decommissioning of existing UPS at Kamburu
lot 1
3 Delivery to site, Installation, testing and commissioning
works of 20kVA UPS system complete with battery bank
at Masinga Power Station.
Decommissioning of existing UPS at Masinga.
lot 1
GITARU POWER STATION BATTERIES – – – – – –
4 Supply of Gitaru SCADA UPS Batteries pcs 75
5 Delivery to site, Installation, testing and commissioning
of new SCADA UPS batteries, and decommissioning of
old of SCADA UPS Batteries at Gitaru Power Station
lot 1
KINDARUMA POWER STATION BATTERIES – – – – – –
6. Supply of Kindaruma SCADA UPS Batteries pcs 75
7 Delivery to site, Installation, testing and commissioning
of new SCADA UPS batteries, and decommissioning of
old of SCADA UPS Batteries at Kindaruma Power Station
lot 1
KIAMBERE POWER STATION BATTERIES – – – – – –
10 Supply of Kiambere SCADA UPS Batteries pcs 75
11 Delivery to site, Installation, testing and commissioning
of new SCADA UPS batteries, and decommissioning of
old of SCADA UPS Batteries at Kiambere Power Station
lot 1
TURKWEL POWER STATION
12 Supply of Turkwel SCADA UPS Batteries pcs 75
13 Delivery to site, Installation, testing and commissioning
of new SCADA UPS batteries, and decommissioning of
old of SCADA UPS Batteries at Turkwel Power Station
lot 1
TEST EQUIPMENT – – – – – –
15 Battery Analyser; Fluke BT521 plus accessories set 1
16 Spectro CA-12 Battery Rapid Tester plus accessories set 1
OTHER SERVICES
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 33 of 42
NO
.
Item Description
UO
M
Qu
an
tity
Basi
c U
nit
Pri
ce
excl
usi
ve
all
tax
es a
nd
oth
er l
evie
s
Tax
es a
nd
oth
er l
evie
s
(sp
ecif
y)
Un
it P
rice
in
cl.
of
all
tax
es &
lev
ies
Tota
l Pri
ce i
ncl
usi
ve
of
all
lev
ies/
Tax
es
17 Design/Engineering work lot 1
18 Factory acceptance tests lot 1
19 Technical documentation
SUPPLY OF UPS’S & SCADA BATTERIES TOTAL (Ksh.)
Total VAT
Total Other duties
TOTAL INCLUSIVE OF TAXES
1.3 Batteries buy back Price offer
Item Description UOM Quantity Basic Unit Price TOTAL PRICE
BUYBACK OF BATTERIES
1. Buy back of old battery banks Gitaru power station pcs 72
2. Buy back of old battery banks Kindaruma power station pcs 72
3. Buy back of old battery banks Kiambere power station pcs 72
4. Buy back of old battery banks Masinga power station pcs 72
5. Buy back of old battery banks Kamburu power station pcs 108
6. Buy back of old battery banks Turkwel power station pcs 72
Total no. of batteries pcs 468
Total price Offer for buy back of Batteries (Ksh.)
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: AMENDED CLAUSES April 2018 Page 34 of 42
1.4 Total offer Price
Amount (Ksh.)
SUPPLY OF UPS’S & SCADA BATTERIES TOTAL
Less Total price Offer for buy back of Batteries ( )
FINAL / DISCOUNTED OFFER PRICE
Delivery Period……………………………………………………………………………………….
Name: …………………………………… Signature: …………………………
Position in the Firm: ............…………………… Date: …………………………
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: ADDITIONAL CLAUSES April 2018 Page 35 of 42
ADDITIONAL CLAUSES
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: ADDITIONAL CLAUSES April 2018 Page 36 of 42
ADDITIONAL CLAUSES
TECHNICAL SPECIFICATIONS OF UPS SYSTEMS
5.2 Standards
Add the following after the table (page 43) The Batteries shall comply with the applicable sections of the current revision of the following standards: Subject Standard Reference Standard Title
Environment &
Safety IEC/EN 60068-2-32 Basic Environmental Testing procedures – Part 2
IEC 60695-11-10 Fire Hazard Testing – Part 11-10
Performance IEC 60896 - 22 Stationary Lead Acid Batteries – Part 22: Valve
Regulated types - Requirements
Testing IEC 60896 - 21
Stationary Lead Acid Batteries – Part 22: Valve
Regulated types – Methods of tests
IEC 61056-1 Shock Test (Drop Test) and Vibration Test
The bidders shall attach the test certificate to proof compliance to the above standards.
8. Testing & Commissioning
8.1 Type test
Add the following requirements for type test reports
8.1.1 Type test reports & certificates
8.1.1.1 Type test reports & certificates shall be certified by EU/USA/Canadian
National Standards and Testing Authority (NSTA) or by a third party (not
manufacturer or manufacturer subsidiary) Reputable Testing Authority
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: ADDITIONAL CLAUSES April 2018 Page 37 of 42
accredited by EU/USA/Canadian National Standards and Testing
Authority (NSTA).
8.1.1.2 Type Test Reports shall meet the following requirements:
(a) Type Test Reports shall be carried out by a laboratory independent
from the manufacturer.
(b) Where a body other than NSTA stated above is used to certify the
type-test reports, a copy of the certificate of accreditation shall be
attached.
(c) Results of type test shall have been conducted at least 6 months and
not more than ten years prior to the date of tender submission. The
bidder shall submit contact details (Title, email, and fax) of
certifying laboratory.
(d) Testing materials and equipment in Type Test Reports shall have
the same code/ country / manufacturer and technical parameters
as offered materials and equipment. Type tests of non-conforming
materials/equipment shall not be accepted.
(e) Type Test Reports shall include all items tested and results
confirming that they meet the requirements of applied standards
as stipulated in Tender Documents.
(f) Type Test reports shall have Report Numbers for authentication.
(g) Current contact information of the testing and certification
authority shall be provided.
8.1.1.3 Type tests reports and certificates for type tests carried out as per stated
standard less than TEN years from the date of bid opening for the
following equipment specified in the tender MUST be included in the bid:
(a) UPS performance in accordance to IEC/EN 62040-3
(b) UPS environmental aspects for industrial environments in accordance to
IEC/EN 62040-4
(c) Battery performance in accordance to IEC 60896 – 21/22
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: ADDITIONAL CLAUSES April 2018 Page 38 of 42
“add clause 8.4 (page 58)
8.4 Factory Inspection and Testing
8.4.1 Test Procedures
8.4.1.1 The Contractor shall prepare test procedures and result sheets for all
tests. The Contractor shall prepare and execute a testing program which
will establish that specified requirements have been met and that the
items furnished and installed will perform as specified and required.
8.4.1.2 The Contractor shall submit to the Employer program that shall establish
the sequence of the tests, the equipment preparation and operation
procedures to be followed and the DETAILED PROCEDURE for
conducting each test.
8.4.1.3 The test procedures and results sheets shall be approved by the employer
at least two months before the factory tests.
8.4.1.4 All the routine tests stated in the equipment design IEC standard and all
the tests stated in the tender document MUST be incorporated in the test
procedures
8.4.2 Attendance of Employer’s Personnel at Factory Tests
8.4.2.1 The Contractor shall arrange for two Client’s engineers or staff members
to witness tests of major items of equipment at the Contractor
manufacturing plant/s.
8.4.2.2 The Contractor shall submit factory acceptance tests schedule for
approval. After approval by the employer, the Contractor shall invite the
Client’s engineers for factory acceptance tests. A period of at least one
month shall be provided from date of invitation to the date of departure
to the contractor’s country of manufacture to allow enough time for
travelling preparations.
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: ADDITIONAL CLAUSES April 2018 Page 39 of 42
8.4.2.3 Contractor shall be responsible for all travel within country of
manufacture and all other associated costs of stay by client engineers
except accommodation and out of pocket expenses which will be catered
by the employer. Necessary expenses such as inland travel charges in the
Contractor’s manufacturing country shall be included in the Tender.
8.4.2.4 The employer will be responsible for the round-trip airfares between
Kenya and the Contractor’s factory country, accommodation and out of
pocket expenses for employer staff.
8.4.2.5 Contractor shall facilitate visa application for the employer engineers by
providing necessary support documents required by the contractors’
manufacturers’ country
8.4.3 Testing
8.4.3.1 Prior to commencement of the tests, the equipment shall be inspected to
ensure:
a) Correct standards of workmanship and quality
b) Correct identification labels, cabling, tagging, housing and
mounting etc.
c) Adequate accessibility
d) Compliance with the Specification and reviewed drawings
(including compliance with fire safety and materials
requirements)
e) Verification of model numbers, quantities of items etc.
8.4.3.2 All factory tests requirements detailed in the approved factory acceptance
test plan/program shall be carried out.
8.4.3.3 Valid calibration certificates from a third party accredited laboratory for
test equipment to be used during FAT shall be presented to the employer
engineers prior to the beginning of the FAT. Only test equipment with
valid calibration certificates from a third-party laboratory credited by
NTSA (KEBS or equivalent) shall be used.
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: ADDITIONAL CLAUSES April 2018 Page 40 of 42
8.4.3.4 Conduct of the Tests
a) The Contractor shall conduct the tests in accordance with the
approved test procedures and shall enter the results in the
approved result sheets.
b) For each test, the Employer will determine whether the test has
passed or failed. In general, the test will be considered to have
failed if either:
• The result of the test is not in accordance with the expected
result described in the test procedure, or
• The result of the test is in accordance with the expected result
described in the test procedure, but some other unexpected or
unexplained event occurred which the Employer considers to
be a fault
c) Full use shall be made during the tests of operator manuals and
other documentation provided by the Contractor to determine the
accuracy of the tests.
8.4.3.5 Failures
a) The Contractor shall correct all faults found during testing and
shall arrange for the test to be repeated. The test shall only be
repeated when the fault has been remedied and the equipment
demonstrated to function correctly.
b) Where remedial measures involve significant modifications that
might, in the Employer’s opinion, affect the validity of earlier tests
then the Contractor shall repeat the earlier tests and obtain
satisfactory results before repeating the test in which the fault was
first identified.
c) The Employer shall have the right to order the repeat or
abandonment of any test in the event that results demonstrate that
the equipment is significantly non-compliant with the Contract
requirements, without in any way prejudicing his rights under the
contract.
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: ADDITIONAL CLAUSES April 2018 Page 41 of 42
d) The Employer shall have the right to suspend any test in the event
that errors or failures have become unacceptable. The Employer
shall also have the right to suspend any test in the event of a fault
being detected by the Contractor but not reported to the Employer
within 24 hours. In this event, the suspension shall remain in effect
until reporting has been brought up to date to the satisfaction of
the Employer
8.4.3.6 Repeat Tests
a) The Contractor shall correct and re-test every fault detected during
the tests.
b) Time spent by the Employer witnessing re-tests or waiting at the
Contractor's premises or the test site while corrections are made
prior to re-test, shall be charged to the Contractor at the standard
hourly rate for the personnel concerned.
c) All other costs incurred by the Employer as a result of such re-tests,
including accommodation, subsistence and travel charges, will be
charged to the Contractor at cost. If the Employer is required to
return to the Contractor's premises or the test site to witness such
re-tests then time spent by the personnel concerned in travelling
to the site of and witnessing such re-tests, and all charges incurred
by them in so doing, shall be charged to the Contractor.
8.4.3.7 After the tests, detailed test report and employer inspection report shall
be signed by the employer engineers and contractor. These documents
shall then become part of the contract.
8.4.3.8 FAT meeting minutes duly signed by the contractor and the employer
representative shall form part of official project documentation and shall
be required by the employer to approve payment processing by the bank.
As part of the terms of letter of credit.
8.4.3.9 Employer will give consent for shipping ONLY after ALL the issues
discussed in the minutes and noted in the employer inspection report
have been rectified and evidence given to the employer.
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INDUSTRIAL
UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR KAMBURU & MASINGA AND SCADA UPS
BATTERY BANKS FOR GITARU, KINDARUMA, KIAMBERE & TURKWEL POWER STATIONS.
KGN-HYD-13-2018 - ADDENDUM 1
KGN-HYD-13-2018 - ADDENDUM 1: ADDITIONAL CLAUSES April 2018 Page 42 of 42
ACKNOWLEDGEMENT OF ADDENDUM NO.1 We, the undersigned hereby certify that the addendum is an integral part of the document and the alterations set out in the clarification has been incorporated in the tender proposal. Signed and Date ………………………………………………………. Tenderer ……………………………………………………………….