Post on 31-Jan-2021
©Metro
Los Angeles County Metropolitan Transportation Authority
One Gateway Plaza Los Angeles, CA 90012-2952
213.922.2000 Tel metro.net
TO:
THROUGH:
FROM:
SUBJECT:
ISSUE
BOARD OF DIRECTORS
PHILLIP A. WASHINGTON CHIEF EXECUTIVE OFFICER
June 24, 2020
RICHARD CLARKE � r (._, CHIEF PROGRAM MANAGEMENT OFFICER
PROGRAM MANAGEMENT CHANGE ORDERS LOG
The Program Management Department was assigned to provide the Board of Directors with 1 quarterly Change Orders/Modifications Log inclJding all the change orders/modifications greater than $500,000 as explained below.
DISCUSSION
At the January 26, 2018 Board meeting, the Board approved the continuation and expansion of the delegation of authority within Life of Project (LOP) budget management on all Transit and Regional Rail Capital Projects. Staff was directed to provide quarterly reports to the Board on change orders and modifications that are above $500,000.
The change activities for the reporting period of March 1 through May 31, 2020 are included in the Attachment A.
NEXT STEPS
The next Change Orders Log will cover the period of June 1 through August 31, 2020.
REGIONAL CONNECTOR TRANSIT PROJECT
Change Types: 1- Betterment 2 • Third Party 3 • Differing Site Conditions 4 • Regulatory Requirements 5 - Scope 6 • Value Engineering 7 - Safety
A. DESIGN BUILD CONTRACT - CONTRACT NO. C0980 - REGIONAL CONNECTOR CONSTRUCTORS MOO/CHANGE # DESCRIPTION Change Type Submission Date Approval Date Contractor's Approved Amount
Proposed Amount
C0980-C0-0030. l Revise Communication Radio System • Construction 5 N/A 4/28/2020 TBD S2.750,000
C0980-MOD-00170 Duco Yard Improvements 5 3/30/2020 4/27/2020 $771,198 $771,198
IB. PROFESSIONAL SERVICES CONTRACT
I MOO/CHANGE# I DESCRIPTION l Change Type I Submission Date I Approval Date I Contractor's I Approved Amount Proposed Amount I INone I I I I I
le. OTHER AGREEMENTS MOO/CHANGE# DESCRIPTION Change Type Submission Date Approval Date Contractor's Approved Amount
Proposed Amount
None
IA. DESIGN BUILD CONTRACT· CONTRACT NO. C0980 • REGIONAL CONNECTOR CONSTRUCTORS CHANGE I
NOTICE/ORDER# DESCRIPTION
C0980-RFC-001S2 Isales Tax Increase
C0980-RFC-00162 I Flower Street Construction Impacts C0980-CN-00237 !Joint Communications Ductbank Infrastructure at 2nd/Hope-Construc11on
I B) PROFESSIONAL SERVICES CONTRACTS Design Support Services During Construction
CHANGE I NOTICE/ORDER# E0119·MOD-0030 I FY2020 Funding for DeStgn Support During Construction
iq CONSTRUCTION MANAGEMENT SUPPORT SERVICES CONTRACTS CHANGE
NOTICE/ORDER #
DESCRIPTION
DESCRIPTION
I MC070·MOD-0021 !Additional Funding for Construction Management Support Services through FY21
ID. OTHER AGREEMENTS MOD/CHANGE # DESCRIPTION
None
I
Change Type Rough Order of Magnitude Cost
4 Between $1M and $SM
s Between $1M and $SM s Between $1M and $SM
I Change Type I Rough Order of Magnitude Cost I s I Between $1M and $SM
T Change Type
l Rough Order of Magnitude Cost
T T Between SSM and SlOM
Change Type I Submission Date I Approval Date Contractor's Approved Amount Proposed Amount
WESTSIDE PURPLE LINE EXTENSION, SECTION 1 PROJECT
I. APPROVED MODIFICATIONS/CHANGES GREATER THAN $SOOK IN THIS REPORTING PERIOD March 1, 2020- May 31, 2020)
IA. DESIGN BUILD CONTRACT· CONTRACT NO. C104S · SKANSKA-TRAYLOR-SHEA, A JOINT VENTURE Change Types: 1 • Betterment 2 • Third Party 3 • Differing Site Conditions 4 • Regulatory Requirements 5 • Scope 6 - Value Engineering 7 - Safety
MOO/CHANGE # DESCRIPTION Change Type Submission Approval Date Contractor's Proposed Approved Amount (if the change Is a unilateral, explain in BOLD lonts) Date Amount
MOD-00095 Phase 5.0 Golder EOR M111gat1on Plan lm�lementatoon (CN-00137.11: This change Is part of the 7 02/27/20 4/1/2020 59,396,773 00 $8.187,405.00 program to mitigate potential eas rrngration dunng Reach 3 tunneling. Contract mod1f1cat1on 00072 (CN-119) Reach 3 Add1t1onal Gas Testing and Assessment was executed on January 30, 2019, and covered the cost to conduct additional gas testing to evaluate the contractors proposed methods of extract 100. This CN covers the scope of work for the vapor extraction construction effort prior 10 lhe launch of the first TBM from Fai rfax Station
MOD-00100 Increased Ventola11on of Station Anc1lla[Y Rooms (CN-00068). Change to increase the ventilation s 02/06/20 3/13/2020 Sl,651,335. 75 $1.469,785.00 requirements at the stat,on stairs and corridor areas to accommodate for surrounding soil conditions f"•assv" or "noten11allv eassv"l. -
MOD-00101 Power Duct bank Conflict at La Brea �1�11on (El:;I-4) (!:N-00087): Accommodates the re- 3 installation of four struts at La Brea Station due to conflicts with the existing electncal
03/23/20 4/29/2020 $5,138,815 00 51.970,258.00
duct banks. MOD-00102 Removal of Abandoned SCE Ductbank at La Cienega Station (CN-00115!: Thi s change 3 03/ 13/20 4/29/2020 $1,013,133.00 $599.480.00
accommodates the removal of an abandoned SCE Ductbank that was In conflict wi th the alignment of struts and walers
MOD-00106 CentN Muck Shaft at la Brea (CN-00093.1)· Construction of a central muck shaft on Wilshire 3 03/23/20 4/2/2020 $6,484,514.00 $5,031,831.00 Blvd at la Brea Station to help increase Statton excavation rates. facilitate material placement and mitigate delays associated with unknown util111es found beneath the deck.
MOD-00107 Additi onal Dewatenng Treatment & Discharge, La Brea Station (CN-00066.I}· The Contractor 3 has encountered several 'Diffenng Site Cond1t1ons' (DSC) related 10 dewatenng that have
03/26/20 4/9/2020 $19,678.507.00 S15,864,922.00
resulted in add1t1onal design, construction and maintenance of the dewatermg system, as well as add1t1onal 1mnacl!:I to station excavation
MOD-00108 Settlement of Survet and Instrumentation Monitori ng (RFC 10) (CN-00158) A settlement 5 amount to reimburse the contractor for out of scope surveying including extended performance
03/30/20 5/5/2020 $9,638,532 00 S4,400,000.00
of survey and 111strumentat1on mon1tonng, interpretation and reporting
IA. DESIGN BUILD CONTRACT· CONTRACT NO. Cl078 • CLARK CONSTRUCTION GROUP INone
Is. PROFESSIONAL SERVICES CONTRACTS None
le. CONSTRUCTION MANAGEMENT SUPPORT SERVICES CONTRACTS None
IA) DESIGN BUILD CONTRACT - CONTRACT NO. C1045 - SKANSKA-TRAYLOR-SHEA, A JOINT VENTURE CHANGE
NOTICE/ORDER #
CN•OOlS0
CN-001S3.1
(N-001SS.1
CN-001S7
DESCRIPTION
I Reach 2 TOM Production Rate Increase: The Reach 2 TBM produCllon rate has been impacted by "methane gas events." This change reimburses the contractor for the premium time associated with adding Saturday work shifts for both TBMs.
1Fa1rf ax Station Entrance and AlC Appendage SchedulP Advancement: lh1s change allows the contractor to advance the Fairfax Station entrance structure and Appendage AlD prior to roof construction using a modified support system
ID1vos1on 20 Si te Preparation: Metro 1s responsible for turn111e over the D1v1s1on 20 site to the (1045 contractor for raol storage and welding. There was specific demolition and rough grading work that was not completed prior to site turnover. This change allows the (1045 contractor to perform the necessary work reqUtred to access and use the D1v1s1on 20 site for ratl storage and welding.
I Constructing la Cienega Station During Mining'. The Reach 2 TBM production rate has been 1111pacted by ''methane gas events." This change removes the dependency between the TBM arrival at la Cienega Station and facilitates continued station construct,on
IA. DESIGN BUILD CONTRACT - CONTRACT NO. C1078 - CLARK CONSTRUCTION GROUP None
B) PROFESSIONAL SERVICES CONTRACTS None
C) CONSTRUCTION MANAGEMENT SUPPORT SERVICES CONTRACTS None
Change Type Rough Order of Magnitude Cost
Between $SOOK - SlM
Between $SOOK - $1 M
Between $SOOK - S lM
Between SlM - $SM
WESTSIDE PURPLE LINE EXTENSION, SECTION 2 PROJECT
I. APPROVED MODIFICATIONS/CHANGES GREATER THAN $SOOK IN THIS REPORTING PERIOD (MARCH 1-MAY 31, 2020)
IA. DESIGN BUILD CONTRACT · C1120 -
Change Types: 1 • Betterment 2 • Third Party 3 • Differ ing Site Conditions 4 • Regulatory Requirements 5 - Scope 6 • Value Engineering 7 • Safety
MOD/CHANGE # DESCRIPTION Change Type Submission Approval Date Contractor's Proposed Approved Amount (if the change is a unilateral. explain 1n BOLD fonts) Date Amount
MOD-00073.0 Centu['t Cit� Constellation Station Trackwork Extension: Extend/install track into the mterface 5 3/26/2020 chambers 111 the west end of the Century City Constellation Station Work will be performed 1n
5/7/2020 $2,929,409.00 s 1,180,087
order to establlsh/mamta1n safe braking distance 111 accordance with the revised contract documents and Metro Rail Design Cntena.
1B. PROFESSIONAL SERVICES CONTRACT MOD/CHANGE# DESCRIPTION Change Type Submission Date Approval Date Contractor's Proposed Approved Amount
Amount
None
II. PENDING MODIFICATIONS/CHANGES GREATER THAN $SOOK (MARCH 1-MAY 31, 2020)
IA) DESIGN BUILD CONTRACT · C1120 CHANGE DESCRIPTION Change Type Rough Order of Magnitude Cost
NOTICE/ORDER#
CN-00076.l MOA Impact to WRS North Side Piling Work at City of Beverly Hills: The purpose of this Change Notice 1s to compensate the contractor for impacts to p1hng 2 Between $1 and $5 Million, operations on the north side or the Wilshire/Rodeo Station box, resulting from construct,on work restrictions m the City of Beverly Hills (COBH) Memorandum of Agreement (MOA) These restnct,ons were not included ,n the Cll20 Contract because negot1at1ons for the MOA for Section 2 of the Purple line Extension were delayed by the City until the MOA for Section 1 was executed, which occurred after award of the CJ120 Contract. The RFP for Section 2 was based on the draft final MOA for Section 1. however the City subsequently imposed additional restrictions for the Wilshire/Rodeo Station.
CN-00087.0 MOA Impacts to Construction Work After Piling in City of Beverly Hills: The purpose of this Change Notice 1s to compensate the contractor for all impacts to 2 Between Sl and SS M1lhon, construction work expected to occur after the 1nstallat1on of p,les at the W1\sh1re/Rodeo-Stat1on, resulting from construction work restnctmns m the City of Beverly Hills (COBH) Memorandum of Agreement (MOA). These rest11ct1ons were not included 1n the Cl 120 Contract because negotiations for the MOA for Section 2 of the Purple Line Extension were delayed by the City until the MOA for Section 1 was executed, which occurred after award of the Cll20 Contract. The RFP for Section 2 was based on the draft final MOA for Section 1, however the C11y subsequently imposed add1t1onal restrictions for the Wilshire/Rodeo Station
1B) PROFESSIONAL SERVICES CONTRACTS
I CHANGE
NOTICE/ORDER # DESCRIPTION Change Type I I Rough Order of Magnitude Cost
I None I I
IC) CONSTRUCTION MANAGEMENT SUPPORT SERVICES CONTRACTS CHANGE DESCRIPTION Change Type Rough Order of Magnitude Cost
NOTICE/ORDER # None
ID) OTHER AGREEMENTS MOD/CHANGE #
I DESCRIPTION Change Type Rough Order of Magnitude Cost
!None
WESTSIDE PURPLE LINE EXTENSION, SECTION 3 PROJECT
I Change Types: l • Betterment 2 • Third Party 3 • Differing Site Conditions 4 . Regulatory Requirements 5 • Scope 6 • Value Engineering 7 -Safety
MOD/CHANGE # DESCRIPTION (if the change 1s a unilateral, explain In DOLD fonts)
CllSl·MOD-00002 IT1me Extension (9S calendar Days} and Compensable Delay - Access to the VA Sue for Tail Track Exn Shaft Relocation
IA. DESIGN BUILD CONTRACT · CllSZ MOD/CHANGE # DESCRIPTION
(If the change ,s a unilateral. explain in BOLD fonts)
Cll52-M00-00002 I Delete Class A ProJect Ofhct:
Cl 152-MOD-00003.l IEmmonmental Impairment Uabihty Site Coverage Insurance
IA. DESl�� BUILD CONTRACT · C11S3 MOD/CHANGE #
I None
is. PROFESSIONAL SERVICES CONTRACTS MOD/CHANGE #
None
DESCRIPTION (1f the change 1s a unilateral, explain rn BOLD fonts)
DESCRIPTION (if the change Is a unilateral, explain m BOLD fonts)
-
Change Type
Change Type
Change Type
Change Type
Submission Date
N/A
Submission Date
N/A
N/A
Submission Date
Submission Date
Approval Date
3/12/2020
Approval Date
3/31/2020
4/27/2020
Approval Date
Approval Date
Contractor's Proposed Amount
$1,567,500
Contractor's Proposed Amount
($4,111.258)
$545,675
Contractor's Proposed Amount
Contractor's Proposed Amount
Approved Amount
S1,567,500
Approved Amount
'�•.lll.!5S1
$545,675
Approved Amount
Approved Amount
CHANGE NOTICE/ORDER #
[ill:
CllSl-CO-00002.2 ISCE Power Connection (Cost Increase from CO to MOD)
DESCRIPTION
Cl!Sl-CN-00005 I Increase Ground Wa-ter Treatment Plant Capacity at Tail Track Exit Shaft ITTES)
Cl 151 •CN-00007 IAdd1t1on of Sepulveda Staging Area
IA) DESIGN BUILD CONTRACT· Cl152 CHANGE DESCRIPTION
NOTICE/ORDER# None
IA) DESIGN BUILD CONTRACT· Cl153 CHANGE DESCRIPTION
NOTICE/ORDER# None
I B) PROFESSIONAL SERVICES CONTRACTS CHANGE DESCRIPTION
NOTICE/ORDER # None
IC) CONSTRUCTION MANAGEMENT SUPPORT SERVICES CONTRACTS CHANGE DESCRIPTION
NOTICE/ORDER JI
None
Change Type Rouch Order of Magnitude Cost
SO.SM - St.SM
SO.SM · SI.OM
S2.OM • S3.OM
Change Type Rough Order of Magnitude Cost
Chango Type Rough Order of Magnitude Cost
Chango Typo Rough Order of Magnitude Cost
Change Type Rough Order of Magnitude Cost
METRO BLUE LINE - SIGNAL SYSTEM REHABILITATION PROJECT
I. APPROVED MODIFICATIONS/CHANGES GREATER THAN $SOOK IN THIS REPORTING PERIOD (March 1, 2020 - May 31, 2019)
!A. DESIGN BUILD CONTRACT · Contract Cl081 Metro Blue Line Resignalling · Mass Electric Change Types: 1 - Betterment 2 • Third Party 3 . Differing Site Conditions 4 • Regulatory Requirements 5 ·Scope 6 • Value Engineering 7 • Safety
MOD/CHANGE# DESCRIPTION (1f the change ,s a unilat@ral, t>xpla1n m BOLD fonts)
MODll OCS and LA central business District (CN 3 2) Un1later CO cancels and supersedes Mod 11
Mod1frcauons on the Overhead Catenary System (OCS) scope includes
l The replacement of the contact wiresfor the MBL/Expo Junction 2. Provide Design to replace OC5 to OCR under the 1-l0bridge to subm1l to City of LA and CAL TRANS for approval 3. Provide 90% design for Re•profile contact w,re through Flower/Venice intersection and flower/18th street; and to provrde acceptable vert1eal clearance at Venice Blvd crossing p�r CPUC cntena 4 Provide design and con:aruct mod1ftcattons to sect1onahzmg scheme at Compton cro�sover to prov1de greater operational flPx1b1 l1ty 5 Procure and install OCS registration assembhes for MBL/Eitpo trunk hne
-
I B. PROFESSIONAL SERVICES CONTRACTS MOD/CHANGE# DESCRIPTION
(if the change 1s a unilateral, explain in BOLD fonts}
None
!C. CONSTRUCTION MANAGEMENT SUPPORT SERVICES CONTRACTS I None
Change Type
5
Change Type
Submission Date
3/11/2020
Submission Date
Approval Date
4/11/2020
Approval Date
Contractor's Proposed Approved Amount Amount
$ 566,970.00 $ 566,970.00
Contractor's Proposed Approved Amount Amount
11. PENDING MODIFICATIONS/CHANGES GREATER THAN $SOOK (March 1, 2020 - May 31, 2020)
IA. DESIGN BUILD CONTRACT· Contract Cl081 Metro Blue Line Resignalling · Mass Electric CHANGE DESCRIPTION Change Type Rough Order of Magnitude Cost
NOTICE/ORDER#
Possible Mod1f1cat1on Florence Main Line (ML) Schedule Recovery (CN Not vet issued) Possible Claim for delays
s 750.000.00
I B. PROFESSIONAL SERVICES CONTRACTS CHANGE DESCRIPTION Change Type Rough Order of Magnitude Cost
NOTICE/ORDER# SECOTRANS Design Support During Constructt0n • Pro1ect will issue a Mod 4 for approximately 825,000. Mod was issued for only 300K Task Order 6 s s 825,000 00
1Mod4)
IC. CONSTRUCTION MANAGEMENT SUPPORT SERVICES CONTRACTS CHANGE DESCRIPTION Change Type Rough Order of Magnitude Cost
NOTICE/ORDER •
None
METRO BLUE LINE, TRACK REFURBISHMENT PROJECT
I. APPROVED MODIFICATIONS/CHANGES GREATER THAN $SOOK IN THIS REPORTING PERIOD (March 1, 2020 • May 31, 2020)
IA. DESIGN BUILD CONTRACT · Contract Cll68 Metro Blue Line Track Reburbishment Chance Types: 1 • Betterment 2 • Third Party 3 - Differing Site Conditions 4 • Regulatory Requfrements 5 • Scope 6 • Value Engineering 7 - Safety
MOD/CHANGE# DESCRIPTION Change Type Submission Approval Date Contractor' s Proposed Approved Amount (,f the changr 1s a unil-'teral, explain in BOLD fonts) Date Amount
CO 12/12.l U�ated 7th£Metro Crossovers Trackworlt Design· (CN 4 1) Contr.1ctor to procure and provide s1gnage for W/RP
6 9/6/2019 12/24/2019 First 1,123.125 then s 500,00000 This contract modification was not paid for by Pro1ect 20S 108 Scope was originally part of W/RP 2,248,935
Contract Cll61. For eff1c1ency, scope was transfered 10 Contr.ict Cl168 - but will still be paid by Project 2101S1
B) PROFESSIONAL SERVICES CONTRACTS None
CHANGE NOTICE/ORDER #
Potential Oa1m I Grounding at Aenal Structures
� PROFESSIONAL SERVICES CONTRACTS
[
CHANGE NOTICE/ORDER #
I None
lq CONSTRUCTION MANAGEME� SUPPORT SERVICES CONTRACTS
I CHANGE I
NOTICE/OIIC>ER__:__j
r I None
DESCRIPTION Change Type I Rough Order of Magnitude Cost
500,000.00
DESCRIPTION Change Type Rough Order of Magnitude Cost
DESCRIPTION Chance Type Rough o,der of Magnitude Cost
WILLOWBROOK / ROSA PARKS IMPROVEMENT PROJECT
I. APPROVED MODIFICATIONS/CHANGES GREATER THAN $SOOK IN THIS REPORTING PERIOD (March 1, 2020 . May 31, 2020)
IA. DESIGN BUILD CONTRACT · Cl161 Willowbrook/Rosa Parks Improvements - Icon West Change Types: 1 - Bette,ment 2 -Third Party 3 • Differing Site Conditions 4 • Regulatory Requirements 5 - Scope 6 - Value Engineering 7 - Safety
MOO/CHANGE# DESCRIPTION Change Type (If the change ,s a unil.Jtcrol, cxpl.:un in BOLO fonts)
MOD41 Package B (Package B) Rosa Parks Station Plaza, Bus Bavs. and Park-and-ride Lot
5
This was goingto be separate Procurement but was added as contract modif1cat1on to (1161
Is. PROFESSIONAL SERVICES CONTRACTS I I I !None
I B. THIRD PARTY AGREEMENTS
I CHANGE
I NOTICE/ORDER U
I !None
DESCRIPTION
I Change Type
I
Submission Date
1/29/2020
Submission Date
Approval Date Contractor's Proposed Approved Amount Amount
5/6/2020 s 14,438,140.00 s 14,330,374,00
I I I I
I Approval Date I Contractor's Proposed I Rough Order of Magnitude Cost Amount
I I
[ill
IA, DESIGN BUILD CONTRACT - Contract Cl161 - Icon West CHANGE
NOTICE/ORDER#
I None
r B. PROFESSIONAL SERVICES CONTRACTS (DESIGN SUPPORT DURING CONSTRUCTION)
r CHANGE
NOTICE/ORDER# I None
f C. CONSTRUCTION MANAGEMENT SUPPORT SERVICES CONTRACTS
r
CHANGE NOTICE/ORDER•
jNone
lo. THIRD PARTY AGREEMENTS CHANGE
4
NOTICE/ORDER •
None
DESCRIPTION Change Type Rough Order of Magnitude Cost
DESCRIPTION
I Change Type
I Rough Order of Magnitude Cost
DESCRIPTION Change Type Rough Order of Magnitude Cost
DESCRIPTION Change Type Rough Order of Magnitude Cost