Japan’s Current Floating Market Status
24 Jan, 2019
Japan Wind Power Association (JWPA)
http://jwpa.jp
5th Offshore Wind day in Tokyo
The Japan Wind Power Association (JWPA)
■ Brief HistoryDecember 17, 2001: started as a Voluntary AssociationApril 1, 2010 : incorporated as a General Incorporated Association
■ Basic philosophy- to improve the energy security of Japan and contribute to solutions for global
environmental issues including warming- to promote sound growth of the wind power industries at home and abroad- to conduct ourselves with strong awareness of responsibility as an industry group
representing our country- to be accountable and maintain compliance by ensuring the function and ability
to exert influence both internally and externally ■ Composition of Members (as of 19 Dec. 2018)
✔ Number of members:384 companies covering whole wind industry✔ Our members own and operate approx.85% of wind farms in Japan.
■ President of the JWPA✔ Mr. Jin Kato, Vice Chairman, Japan Wind Development Co.
(Former CO-CEO of the MVOW)
2
New Offshore Promotion Law has established in Japan
3
- It secures developers 30 years occupation
rights at General common Sea Area.
Schedule
- Approved by both Diets on 31 Nov.2018.
- Public announced on 7 Dec.2018.
4 months for fixing the detail ordinaries
- Enforced early April 2019.
- 1st auction will be announced in early summer.
- The winner will be announced.
Laws and Tariff at Offshore Wind Power in Japan
4
Japan sea area is divided into several categories by Japanese law system.
Sea Area Categories Law Occupation year Tariff
FY2019 FY2020
TerritorialSea
(Within 22.4 km)
Port AssociatedSea Area
Harbor & Port Law(Amended in 2016)
10 years(repeatable)
FIT36 JPY/kWh
FIT36 JPY/kWh
General Common Sea Area
Each prefectural / special city’s regulations
Such as 3 – 4 years (repeatable)
FIT36 JPY/kWh
No data
New offshore law(Enforced in April
2019)
30 years Auction
Exclusive Economic Zone (EEZ)
No regulations No data No data No data
Researched by JWPA
Current Offshore Wind Power Projects in Japan(Both fixed and floating type)
5
As for floating offshore wind:
- 16MW, 4 turbines, 2 projects are in operation (One 7MW turbine is to stop operation in 2019)
- NEDO’s one 3MW turbine is under commissioning. It will start official operation soon.
- Toda Co.’s 22MW project is under development.
Water depth: 96m(LSWL)-
99m(HSWL)
Distance from land: 1km
Distance for marine cable: 2km
Vaverage@60m: 7.5m/s
Ve50@60m: 53.1m/s
Hs50: 7.7m
Ts50: 14sec
Max Current: 0.96m/s
2km
Cable
1km
MOE Floating WTG National Project
at Kabashima in Goto Islands,
Nagasaki Pref.(GOTO-FOWT)
Hitachi’s
Down wind type
2MW wind turbine
Conducted by Toda Co.
28 Oct.2013: in Operation
6
MOE: Ministry
of Environment
Relocated and granted to Goto city in 2016
MOE’s national project has finished in Mar. 2016.
The turbine was granted from MOE to Goto city local government.
Toda Co. has moved WTG about 10km southwest from Kabashima to Fukuejima.
Fukuejima has more population(38k) and larger electricity capacity than Kabashima.
It was re-connected to the gridline and started commercial operation in Mar. 2016.
METI approved offshore wind tariff 36JPY/kWh for it. (1st and only case in Japan)
Relocated
(10 km)
Ref: Press release by Toda Co. on 15 Apr. 2016
http://www.toda.co.jp/news/pdf/20160415.pdf Photo: Taken by Mr. Hoichi Nishiyama
5 km from seashore
7
Toda Co. announced to develop 22MW floatingoffshore windfarm at Goto islands on 3 Oct.2016
http://www.toda.co.jp/hairyo.html
8
Toda Co. issues 10 billion JPY
Green bond for this project.
Source; Fukushima offshore wind consortium
2013 2013 2015 2017
Hitachi 2MWMitsui semi-sub6 mooring lines
MHI 7MWMHI semi-sub
8 lines
Hitachi 5MWJMU Spar
6 lines
HitachiJMU Spar
Fukushima floating WT project (Overview)
Project Consortium:11 members Marubeni (Project integrator)
MHI
University of Tokyo
Mitsubishi Corp.
IHI Marine United
MES
Nippon Steel
Hitachi
Furukawa Electric
Shimizu Corp.
Mizuho Information & Research
METI’s Fukushima Recovery, Experimental
Offshore Floating Wind Farm Project
(FukushimaFORWARD)
9
Summary results of FukushimaFORWARD
Hitachi 2MW turbine
Downwind type
Since Nov. 2013.
4 years 8 months operation
Availability 94.1%
Capacity Factor 32.9%
Evaluation: Good
Mitsubishi 7MW turbine
Upwind, hydraulic drive
Since Dec.2015
2 years 7 months operation
Availability 16.4%
Capacity Factor 3.7%
Evaluation : Very bad
To stop for decommission
Hitachi 5MW turbine
Downwind type
Since Feb.2017
1 year 5 months operation
Avairability 61.3%
Capacity Factor 18.5%
Evaluation: Poor, but
gradually improving 10
NEDO’s new floating offshore national project for aiming cost reduction using foreign new technologies
- One 3MW floating turbine at Kitakyushu 15 km offshore.
It is to starts operation in early 2019
- 2 bladed turbine designed & manufactured by German Aerodyn.
- Moon pool barge type floater designed by French IDEOL,
made by Japanese Hitz at their dockyard at Sakai, Osaka pref..
Kitakyushu
in July 2018
Kitakyushu
in Oct. 2018
Sakai Hitz dockyard
June 2018
Another NEDO project :
1/10 scale model, designed & made by
German Aerodynis in operation at
Kure, Hiroshima now.