NATTAPHOOM TEWARUN’s professional experiences From 2010 -2013 @IPA Technologies Co., Ltd

#1 experiences in project management for supply engineering and startup commissioning vertical cement mill No.4 project

@CEMENT INDUSTRIES OF MALAYSIA BERHAD Plant, Perlis Malaysia duration 12 May 2012 – 25 July 2012

#2 Supply ABB 800Xa DCS system and commissioning for cement ball mill project

@Al-Humyin Saudi Arabia duration 8 Jan 2012 -15 March 2012

Using ABB PM866 as main DCS Processor and Profibus DP protocol for main communication bus

#3 CEMEX APO Cement, CEBU, Philippines project Clinker Grate Cooler movement control programming upgrade from

Krupp Polysius -> Allen-Bradley ControlLogix L62 PLC with PanelView 7” Touchscreen for monitoring & control process.

Duration 15 March 2011 -25 March 2011

#4 In House engineering and purchasing control system with redundancy availability

Complete cement plant 3500 tons/day, APODI Plant, Brazil 2012

PYROProcess Kiln Burner Department Process flow sheet and P&ID diagram designing

Electrical PLC and Remote I/O panels designing with Ethernet I/P and Optical Fiber connection

Rockwell FactoryTalk software set implemented by IPA-TECH Framework SCADA System

TECH- TOP Display Cement Plant as during engineering state 3500tons/days APODI BRAZIL

MH1 Department Raw Material crusher and storage

Example of Raw Material Grinding department using vertical mill hydraulic roller press

Example of Raw Material Crushing Group Start Control Pages