NATTAPHOOM TEWARUN’s professional experiences From 2010 -2013 @IPA Technologies Co., Ltd
#1 experiences in project management for supply engineering and startup commissioning vertical cement mill No.4 project
@CEMENT INDUSTRIES OF MALAYSIA BERHAD Plant, Perlis Malaysia duration 12 May 2012 – 25 July 2012
![Page 2: IPA_2010-2013_WORKING_PROFILED](https://reader034.fdocuments.us/reader034/viewer/2022042819/55cc6376bb61eb0f7e8b4691/html5/thumbnails/2.jpg)
#2 Supply ABB 800Xa DCS system and commissioning for cement ball mill project
@Al-Humyin Saudi Arabia duration 8 Jan 2012 -15 March 2012
Using ABB PM866 as main DCS Processor and Profibus DP protocol for main communication bus
![Page 3: IPA_2010-2013_WORKING_PROFILED](https://reader034.fdocuments.us/reader034/viewer/2022042819/55cc6376bb61eb0f7e8b4691/html5/thumbnails/3.jpg)
#3 CEMEX APO Cement, CEBU, Philippines project Clinker Grate Cooler movement control programming upgrade from
Krupp Polysius -> Allen-Bradley ControlLogix L62 PLC with PanelView 7” Touchscreen for monitoring & control process.
Duration 15 March 2011 -25 March 2011
![Page 4: IPA_2010-2013_WORKING_PROFILED](https://reader034.fdocuments.us/reader034/viewer/2022042819/55cc6376bb61eb0f7e8b4691/html5/thumbnails/4.jpg)
#4 In House engineering and purchasing control system with redundancy availability
Complete cement plant 3500 tons/day, APODI Plant, Brazil 2012
PYROProcess Kiln Burner Department Process flow sheet and P&ID diagram designing
Electrical PLC and Remote I/O panels designing with Ethernet I/P and Optical Fiber connection
![Page 5: IPA_2010-2013_WORKING_PROFILED](https://reader034.fdocuments.us/reader034/viewer/2022042819/55cc6376bb61eb0f7e8b4691/html5/thumbnails/5.jpg)
Rockwell FactoryTalk software set implemented by IPA-TECH Framework SCADA System
TECH- TOP Display Cement Plant as during engineering state 3500tons/days APODI BRAZIL
MH1 Department Raw Material crusher and storage
![Page 6: IPA_2010-2013_WORKING_PROFILED](https://reader034.fdocuments.us/reader034/viewer/2022042819/55cc6376bb61eb0f7e8b4691/html5/thumbnails/6.jpg)
Example of Raw Material Grinding department using vertical mill hydraulic roller press
Example of Raw Material Crushing Group Start Control Pages