Investor Facilitation Cell and Single Window Clearance System — Process Review
Page 2
Investor Facilitation CellProcess Review
Page 3
GoaKey Statistics Investor Facilitation CellBrief Background
• Dedicated cell in MSSIDC premises at Ballard Estate, Mumbai
• 31 pre-production services to be offered in 1st Phase
• One Nodal Officer and one full time officer of the concerned department to be stationed in the cell
• On line application facility for the investor
• Physical application acceptance, scrutiny and delivery of Clearance/permission/NOC etc in the cell
• Nodal Officers to ensure the delivery of service in time as per Citizens Charter of the department
• A Help Desk to provide information to the investors
• The IFC team would constitute of MIDC marketing team, implementation as well as knowledge partners EY and five other members through manpower providing vendor
Page 4
GoaKey Statistics Investor Facilitation CellMandate and Infrastructure
• Mandate for Investor Facilitation Cell would include —o Promote investments into Maharashtra and facilitate business partnershipso Function as a clearing house for all investment related informationo Assist the state to project investment opportunitieso Develop database, meta-database and gather market intelligence on investment
intentions into the state• The IFC team will cater to projects which have an investment of at least 10 crore i.e
both Mega and large projects in nature. This would encompass project leads which are new as well as ongoing
Mandate
• The cell will be housed in first floor of MSSIDC premises at Ballard Estate• Around 5000 sq ft area provided by MSSIDC• Provisions for air conditioned Conference Hall, Application counters, officers cabins • Expenditure to be incurred by MIDC• Estimates approved and Tender process initiated• Centre will be ready by August 2013• Existing MIDC IT system will be utilized• Single window IT application will be developed by MIDC
Infrastructure
• Contract for Investor Facilitation Cell furnishing has been awarded; The work is in progress and should be completed before August 2013
• RFP for dedicated manpower to the IFC had been floated. 6th August 2013 was last day for the application. Tender received no response
Present Status
Page 5
Investor Facilitation CellServices to be offered
Sr. No. Govt Deptt Office/Authority Service
For units Located in MIDC area
1
MIDC
Land Deptt Land Allotment
2 SPA Building plan Approval
3 Land Deptt Mortgage NOC
4 Fire Deptt Fire Approval (Prov)
5 Fire Deptt Fire Approval (Final)
6 Engg Dept Drainage Connection
7 Engg Dept Water Connection
8 Engg Dept Electrical connection NOC
9 SPABuilding Completion
Certificate/ Occupancy Certificate
Online Services
Page 6
Investor Facilitation CellServices to be offered
Sr. No. Govt Deptt Office/Authority Service
For units Located Outside
MIDC area
10 Industries Deptt DI BTAL Permission for
agri land>5 ha
11 Revenue Collectorate N A Permission for agri land
12
UDD
UDD Zone Change for agriland under BTAL
13 Town Planning Building plan Approval
14Maharashtra Fire
ServicesFire Approval (Prov)
15 Maharashtra Fire Services Fire Approval (Final)
16 Irrigation Irrigation-II Water Reservation
Online Services
Page 7
Investor Facilitation CellServices to be offered
Sr. No. Govt Deptt Office/Authority Service
Compulsory for all units
17Industries
Deptt
DI Stamp Duty Exemption
18 Ind-8 Approval of Mega Project
19
Env Deptt
MPCB Consent to Establish
20 MPCB Consent to Operate
21 Env DeptEnvironment Clearance for
BUA>20000sqm
22Labour Deptt
DISHLicense under
Factories Act 1948
23 DISH Building plan Approval
Online Services
Page 8
Investor Facilitation CellServices to be offered
Sr. No. Govt Deptt Office/Authority Service
Compulsory for all units
24
Finance Deptt
Sales Tax CST Registration
25 Sales Tax VAT Registration
26 Sales Tax Profession Tax Registration
27 Energy Deptt MSEDCL Power Connection
28 PWD Elect Inspector Line Charging NOC
Others29
LabourDepartment
Directorate of Boilers Inspection of boiler & certification
30 Directorate of Boilers Permission to run the boiler
Online Services
Page 9
Investor Facilitation CellServices to be offered
Sr. No. Govt Deptt Office/Authority Service
Others 31Labour
Department LabourCommissionerate
Registration of establishments
employing contract labor
Online Services
Page 10
Mahaebiz Website
Revamping of the Mahaebiz website is in process
Page 11
Annexure
Page 12
Doing Business in Maharashtra
Page 13
Determining of Mega/Large Projects
1. Is it a Mega
Project?
Approval of Mega Project
(Ind-8)
Y
3. Is the company
applying for government
land to MIDC?
N
Apply to MIDC 4. If Land requirement =< 5 Ha.
Y N
Purchase Private Land
BTAL Permission from
DI
Y N
Stage I — Determining if it is a Mega or a Large Project
2. Is Land already in
Possession?
NSkip to Stage 3
— Environmental Clearance
Y
Stage II — Land Application Process
Apply as a Large project through IEM/License
route(SIA)
Page 14
Land Application Process
Either, Zone Change for agri
land under BTAL (UDD)
Or, N A Permission for
agri land (Collectorate)
For Land Application
Apply to MIDC Purchase Private Land
Submission of Online
Application
Possession of Land
Land Allotment Procedure
Apply for Stamp Duty Exemption
Apply for Environmental
Clearances
Possession of Land
Page 15
Environmental Clearances and Industry Setup Approvals
Environmental Clearances
5. If land requirement >=
20,000 sq. ft
Environment Clearance
(Env)/ EIA*
Consent to Establish (MPCB)
Approvals required to
setup a plant
Building Plan approval (DISH)
Mortgage NOC (MIDC)
Provisional Fire Approval
(MIDC/Maharashtra Fire Services)
Registration & license under
Factories Act (Form 2 & 3) (DISH)
Building Plan approval-MIDC/(Town Planning Department), which include (for MIDC)
• Application for Drainage plan Approval.• Application for Drainage Connection Approval• Application for Completion of drainage Plan
Y
N
Stage III —Environmental Clearances
Industry Setup
completed
Water Supply connection
(MIDC)/Water Supply Consent (Irrigation Dept)
Grant of No Objection
Certificate for power connection
(MIDC)
Final Fire Approval
(MIDC/Maharashtra Fire Services)
Building Completion Certificate (BCC) /
Occupancy Certificate (MIDC)
Stage IV — Application for Plant Setup Approvals
Proceed to Application for
Project Pre-Commencement
Approvals
*For Complete description of EIA Process, please turn to next slide
Page 16
Environmental Clearance
Application for TOR for Environmental Clearance for land outside MIDC
Category A projects
EC by MoEF
Category B projects
If GC is applicable,
then
SEAC
B1
Determining TOR
EIA
Public Consultation
Appraisal
Recommendation By SEAC
SEIAA
Issuing EC Rejection of proposal
B2
SEACrecommendationof rejection may beaccepted or referback to SEAC toreconsider
Page 17
Project Pre-Commencement Approvals
Approvals required prior project pre-
commencement
If a substation/high tension connection is required, then
Approval From Chief Engineer Inspector-(Electrical) (PWD)
Permission to run the
boiler (DoB)
Project Pre-Commencement steps completed
Application for Energy Supply
(MSEDCL)
Registration of establishments
employing contract labor
(LD)
Profession Tax Registration (Sales Tax)
VAT Registration (Sales Tax)
CST Registration (Sales Tax)
Inspection of boiler &
certification (DoB)
Stage V — Application for Project Pre-Commencement Approvals
Start of Project Pre-
Commencement
Stage Demarcation
Decision Node
Connecting Node
Start Node
End Node
Central Approval
Consent to Operate(MPCB)
Page 18
Questions
1. Is the applying company eligible as a Mega Project? Response — (a) If yes, then apply for Mega Project Status Approval (b) else Apply as a Large Project through IEM/SIA route
2. Does the company already has the land in possession?Response — (a) If yes, then skip to Environmental Clearance Approvals (b) else, apply for Land
3. Is company applying for government land in the MIDC area?Response — (a) If yes, then apply for Land to MIDC (b) else, check if the requirement for private land less than 5 hectare
4. If the company is purchasing private land, is it less than 5 hectare?Response — (a) If yes, then purchase private land (b) else, seek BTAL Permission and then purchase private land
5. For getting environmental clearance, is the land requirement less than 20,000 sq. m?Response — (a) If yes, then seek environmental clearance from the environment ministry (b) else, seek consent to establish from State pollution control board
Page 19
List of Abbreviations
Ind – 8 Industries – 8, Industries Department
SIA Secretariat of Industrial Assistance
MIDC Maharashtra Industrial Development Corporation
IEM Industrial Enterprise Memorandum
BTAL Act Bombay Tenancy & Agricultural Lands Act
DI Directorate of Industries
UDD Urban Development Department
LD Labor Department
Env Ministry of Environment and Forests
MPCB Maharashtra Pollution Control Board
MSEDCL Maharashtra State Electricity Distribution Company Limited
PWD Public Works Department
DoB Directorate of Boilers
DISH Directorate of Industrial Safety and Health
Page 20
Single Window Clearance Background
Page 21
Select, sort, filter, information, routes it to targeted recipients ( various government agencies) in the proper sequences or flow and return responses to the investor
Single Window ClearanceSine Qua Non
The single-window system is a trade facilitation idea. The implementation of a single window system enables domestic as well as international (cross-border) traders to submit regulatory documents at a single location and/or single entity.
— Government: increase in government revenue, enhanced compliance with rules, improved efficiency in resource allocation, better trade statistics,
— Traders: faster clearance times, a more transparent and predictable process and less bureaucracy,
— Customs: improved staff productivity through the upgraded infrastructure, increase in customs revenue, a more structured and controlled working environment, and enhanced professionalism,
— Economy as a whole: improved transparency and governance and reduced corruption, due to fewer opportunities for physical interaction.
Investor submits all information required for processing its documents
Responses received from various government agencies
MIDC
MPCB
Labor
PWD
S. Tax
UDD
Main Value propositions of SWC
Ind
MSEDCL
Page 22
New Features
SMS facility
Payment Gateway
Barcode tracking services
Back-end processing platform
through ERP
Linking with Labour
department and MSEB
Industrial Policy 2013Vision for SWC
— In line with MIDC’s vision of holistic and inclusive growth by turning ‘digital,’ the MIDC has developed an Investor portal
— The objective of this portal is to provide investors a one-stop portal for information, services and consents electronically.
— The Maha eBiz portal provides information for 205+ services, including 45 fully automated services of MIDC, MPCB and Directorate of Industries and 160 non-automated services across various state and central departments, which will be integrated soon.
To further augment single window clearance, the State Government will inter-alia incorporate new
features such as:
The Industrial Policy of 2013 provides important provisions for the implementation of the SWC System. Some of the key features are mentioned as below: