Post on 22-Jan-2022
I-432SC-1112
Installation Instructions for Soft-Close Base Filler with SlidesNote: Do not remove front shipping strap prior to installation!
Step 1. Measure scribe rail thickness and length per your specific cabinetry. (See Fig 1a and 1b)
Step 2. Install upper and lower scribe rails to filler pullouts being careful not to split the wood. If using screws to attach, be sure to pre-drill first. Align scribe rails with front edge of filler pullouts. Align scribe rail to upper section of base cabinet lower mounting. (See Fig 2) Note: If installing pullout in a frameless application, it is recommended to that a 1/16” thick scribe rail be used to space the filler unit properly.
Step 3. Pre-drill 3/16” holes 3/8” down from top of cabinet and also 27-3/4” down from top of cabinet. (See Fig 3) Repeat with adjacent cabinet.
Step 4. Mount filler cabinet pullout to adjacent cabinet. Make sure filler is flush with the top of the cabinet wall and behind the face-frame if applicable.
Fig 1aFig 1b
Cabinet Wall
Scribe rail measurements
Front of CabinetScribe Rail
width dimensionFront of Cabinet
Scribe Rail Length
Top Scribe Rail is nailed to edge of top section
Bottom scribe rail is nailed to edge of bottom section
Fig 2
“Changing the way you think about cabinet organization!”“Cambiamos su percepción sobre la organización de armarios”
“Nous changeons votre conception de l’aménagement des armoires”
www.rev-a-shelf.com1-800-626-1126
432 Series Filler Pullout Instructions
Instrucciones del armario de relleno deslizante – Serie 432
Directives de montage du module coulissant série 432
I-432-TRI-1012
Fig 1
Step 1. Measure scribe rail thickness and length per your See Fig 1
Fig 2
Step 2. Install upper and lower scribe rails
or brads. See Fig 2. Note: Align scribe rails
scribe rail to upper section of base cabinet lower mounting strap or lower section of wall cabinet lower mounting strap. See Figs. 3a-b.
Top Scribe Rail is nailed to bottom edge of top section
Fig 3aWall Cabinet
Bottom Scribe Rail is nailed to edge of bottom section
Top Scribe Rail is nailed to edge of
top section
Fig 3bBase Cabinet
Bottom Scribe Rail is nailed to edge of bottom section
Fig 4a Fig 4b
Step 3. (Base Cabinets). Pre-drill 3/16 inch holes 3/8 inch down from top of cabinet and also 27-3/4” down from top of cabinet. (See Fig 4a-d). Repeat with other adjacent cabinet.
Fig 5a Fig 5b
Step 4. See Fig. 5a-b
Fig 6
Step 5. to adjacent cabinet 2. See Fig. 6
Fig 8 Fig 9
Step 7. Attach face frame and onlays (not provided) See Fig. 8-9Fig 7
Step 6. Remove front mounting strap. See Fig 7.
Filler CabinetBase Cabinet Scribe Rail Meets Face Frame
From inside the adjacent cabinet screw the 432 to cabinet top.
Fig 4c Wall Cabinet
Screw 432 to cabinet bottom from below adjacent cabinet.
Screw 432 to cabinet top from above adjacent cabinet.
Fig 4d Base Cabinet
From inside and above the adjacent
the 432 to cabinet bottom.
Filler CabinetBase Cabinet Scribe Rail Meets Face Frame
p
Fig 3
TOOLS REQUIRED: ESTIMATED ASSEMBLY TIME:
20 MIN
CARE AND MAINTENANCE:
CLEAN WITH A DAMP CLOTH AND WIPE PARTS DRY
3/16”
Shipping Strap
Step 5. Mount filler cabinet pullout to remaining adjacent cabinet.
2409 Plantside Drive • Jeffersontown • KY • 40299800.626.1126 • FAX: 502.491.2215
www.rev-a-shelf.com
Note: Your pullout unit does not need to be removed for installation. If you encounter an issue that requires the unit to be removed, the release levers for the Blum Tandem slides are located as shown. (See Fig 6a-b).
Step 6. Remove front shipping strap. (See Fig 4) Step 7. Attach onlays or door panels. (not provided). (See Fig 5)
Fig 4
Shipping Strap
Fig 5
Back of pullout
Fig 6a
Fig 6b
Top slide release lever
Install onlay using slots for side to side adjustment
Use micro adjustment screw for door tilt adjustment
Bottom slide release lever
Front slide height adjustment
1
2
Step 1. Press up on adjustment tab.Step 2. Push toward back of unit. Maximum 1/8” rise of filler. (See Fig 7a-c)
Fig 7a Fig 7b
Fig 7c
Adjustable Tab
1
2
1
2
Adjustable Tab
Disassembling the pullout from the chassis