July 7, 2020

Justin J. KringstadGeological Engineer

Director

North Dakota Pipeline Authority

Industrial Commission Update

Williston Basin Oil Production & Export Capacity, BOPD

33JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 3

4

NDPA Production Forecast and Rail Transportation

JJ Kringstad - North Dakota Pipeline Authority 4

NDPA Base Case Oil Production Forecast (Green)

Pipeline Capacity Shortfall (Grey):

“Need” to Rail

Rail History (Red):

Exceeds “Need” - Delta Considered “Elective/Market Driven”

As

su

me

s D

AP

L R

etu

rns

to

Se

rvic

e S

ep

20

21

5 5

Snapshot from

DAPL Tariff

Slide Source: SEC.GOV - 2014

Look at Key Rail Rates

Additional Rail Related

Expense Considerations:

• Loading

• Unloading

• Car Leasing

• Unit vs Manifest

• Volume Commitments

Note: 2014 Slide

7

North Dakota Crude Oil Rail Loading Facilities In ServiceNorth Dakota Pipeline Authority – July 2020

Estimated Williston Basin Oil Transportation

8

8JJ Kringstad - North Dakota Pipeline Authority 8

9

Estimated ND Rail Export Volumes

JJ Kringstad - North Dakota Pipeline Authority 9

Rail Destinations Market Share (April 2020)

10

Data for Rail Destination Market Share Provided by the US Energy Information Administration

JJ Kringstad - North Dakota Pipeline Authority 10

11

Major Rail Lines and Refineries

11

$26.28

$19.41

$15.72

$16.10

$23.40

EIA April 2020

Refiner Acquisition Cost

JJ Kringstad - North Dakota Pipeline Authority

Cushing

$40.61

Brent $43.16

WTI + $2.55

Crude Oil Prices – July 7, 2020

12JJ Kringstad - North Dakota Pipeline Authority

Pricing Data:

Bloomberg &

CME (LLS-Argus)

LLS (Argus)

WTI + $1.45

13 13

Justin J. Kringstad, DirectorNorth Dakota Pipeline Authority

600 E. Boulevard Ave. Dept. 405Bismarck, ND 58505-0840

Phone: (701)220-6227Fax: (701)328-2820

E-mail: jjkringstad@ndpipelines.com

Websites: www.pipeline.nd.gov

www.northdakotapipelines.com

Contact Information

JJ Kringstad - North Dakota Pipeline Authority 15