Ignacio Galán Vinuesa Background

Post on 09-Feb-2017

134 views 3 download

Transcript of Ignacio Galán Vinuesa Background

IGNACIO GALAN VINUESA

Topography Technical Engineer

Survey Party Chief

Survey Party Chief responsible for structures

Chief surveyor: measurements, roadways design, crews management

AutoCAD, Bentley Microstation and InRoads

AREAS OF EXPERTISE

CONSTRUCTION BACKGROUND

M50 DUBLIN MOTORWAYConstruction Company : Construction Consortium Sacyr-FCC-Hegarty

Budget : 250,000,000 eurosLocation : Dublin (IRELAND)

Upgraded the existing M-50 urban motorway in Dublin over a stretch of 24 km by widening the road with one new lane in each direction, and adapted and improved existing junctions

Works as Chief Surveyor; responsible for measurements, designed junctions and intersections, organized and supervised Land Surveyor crews

TALAVERA DE LA REINA BELTWAYConstruction Company : Construction Consortium Sacyr-Aglomancha-Barcenas

Budget : 90,000,000 eurosLocation : Talavera de la Reina, Toledo (SPAIN)

The project included building of a cablestayed bridge with a 318 meters span and a 190 meters high inclined mast crossing the widest point of the river in a single suspended stretch. The bridge was coupled with twin access viaducts, each 204 meters long

Responsible for checking the building of steel nucleus of pylon (190 meters high) with 3D program and Microstation and placement in site construction. Survey Party Chief to other works

AVE(HIGH-SPEED-RAILWAY) LLEIDA-MARTORELL SUBSECTION IConstruction Company : OHLBudget : 150,000,000 euros

Location : Lleida, Cataluña (SPAIN)

22 km High-Speed Railway construction. The project included the building of a 2,900 meters long viaduct, combining two methods of construction, sliding formwork and pushed viaduct, and another 380 meters viaduct

Survey Party Chief responsible for structures and other site works

M50-R3-M203 MAIN ROAD JUNCTIONSConstruction Company : Construction Consortium Sacyr-FCC-Dragados

Location : Madrid (SPAIN)

Survey Party Chief responsible for structures and other site works

MANY DEVELOPMENT AREAS, CAR LOGISTICS CENTER AND RAILWAY SIDING, PARKING AND PREVIOUS STUDIES AND WORKS TO DEVELOPMENTS

Los Berrocales Urban DevelopmentConstructor : Sacyr (8,300,000 square meters)

Budget : 84,000,000 eurosLocation : Madrid (SPAIN)

Los Tempranales Urban DevelopmentConstructor : Sacyr (1,150,000 square meters)

Budget : 42,000,000 eurosLocation : San Sebastian de los Reyes, Madrid (SPAIN)

Casablancas Industrial Park DevelopmentConstructor : Sacyr (1,500,000 square meters)

Budget : 32,000,000 eurosLocation : Torrejon de Ardoz, Madrid (SPAIN)

Car Logistics Center and Railway SidingConstructor : Sacyr (500,000 square meters)

Location : Ciempozuelos, Madrid (SPAIN)

Ignacio Galán VinuesaTopography Technical Engineer (Universidad de Salamanca)

308 - 11 Evergreen Place

R3L 2T9 Winnipeg, Canada

Mobile : 001 204 952 2800

Email : igalanvinuesa@yahoo.es

LinkedIn