Ignacio Galán Vinuesa Background
-
Upload
ignacio-galan-vinuesa -
Category
Documents
-
view
134 -
download
3
Transcript of Ignacio Galán Vinuesa Background
IGNACIO GALAN VINUESA
Topography Technical Engineer
Survey Party Chief
Survey Party Chief responsible for structures
Chief surveyor: measurements, roadways design, crews management
AutoCAD, Bentley Microstation and InRoads
AREAS OF EXPERTISE
CONSTRUCTION BACKGROUND
M50 DUBLIN MOTORWAYConstruction Company : Construction Consortium Sacyr-FCC-Hegarty
Budget : 250,000,000 eurosLocation : Dublin (IRELAND)
Upgraded the existing M-50 urban motorway in Dublin over a stretch of 24 km by widening the road with one new lane in each direction, and adapted and improved existing junctions
Works as Chief Surveyor; responsible for measurements, designed junctions and intersections, organized and supervised Land Surveyor crews
TALAVERA DE LA REINA BELTWAYConstruction Company : Construction Consortium Sacyr-Aglomancha-Barcenas
Budget : 90,000,000 eurosLocation : Talavera de la Reina, Toledo (SPAIN)
The project included building of a cablestayed bridge with a 318 meters span and a 190 meters high inclined mast crossing the widest point of the river in a single suspended stretch. The bridge was coupled with twin access viaducts, each 204 meters long
Responsible for checking the building of steel nucleus of pylon (190 meters high) with 3D program and Microstation and placement in site construction. Survey Party Chief to other works
AVE(HIGH-SPEED-RAILWAY) LLEIDA-MARTORELL SUBSECTION IConstruction Company : OHLBudget : 150,000,000 euros
Location : Lleida, Cataluña (SPAIN)
22 km High-Speed Railway construction. The project included the building of a 2,900 meters long viaduct, combining two methods of construction, sliding formwork and pushed viaduct, and another 380 meters viaduct
Survey Party Chief responsible for structures and other site works
M50-R3-M203 MAIN ROAD JUNCTIONSConstruction Company : Construction Consortium Sacyr-FCC-Dragados
Location : Madrid (SPAIN)
Survey Party Chief responsible for structures and other site works
MANY DEVELOPMENT AREAS, CAR LOGISTICS CENTER AND RAILWAY SIDING, PARKING AND PREVIOUS STUDIES AND WORKS TO DEVELOPMENTS
Los Berrocales Urban DevelopmentConstructor : Sacyr (8,300,000 square meters)
Budget : 84,000,000 eurosLocation : Madrid (SPAIN)
Los Tempranales Urban DevelopmentConstructor : Sacyr (1,150,000 square meters)
Budget : 42,000,000 eurosLocation : San Sebastian de los Reyes, Madrid (SPAIN)
Casablancas Industrial Park DevelopmentConstructor : Sacyr (1,500,000 square meters)
Budget : 32,000,000 eurosLocation : Torrejon de Ardoz, Madrid (SPAIN)
Car Logistics Center and Railway SidingConstructor : Sacyr (500,000 square meters)
Location : Ciempozuelos, Madrid (SPAIN)
Ignacio Galán VinuesaTopography Technical Engineer (Universidad de Salamanca)
308 - 11 Evergreen Place
R3L 2T9 Winnipeg, Canada
Mobile : 001 204 952 2800
Email : [email protected]