Air traffic management operations

are becoming more dependent on

communication and surveillance

capabilities and performances

Global Data Link Coverage

Safety promotion

• NAT PBCS Workshop

– Task 4 of NAT PBCS Implementation Plan

– Training and education - Safety communication

– Exchange information and promote global harmonization

Overview – Session 1

• Global and regional ICAO and industry standards, recommended practices and guidance material

– Annexes 6 & 11, Doc 4444 (PANS/ATM), Doc 9869, GOLD

– RTCA / EUROCAE Interoperability (INTEROP) and Safety and Performance (SPR) standards

• Existing FANS 1/A and ATN B1 and future B2

Overview – Session 2

• Capacity and efficiency - Use of data link / mandates (NAT and EUR)

• Reduced separations predicated on communication and surveillance performance – 5-minute, 30 NM and 50 NM longitudinal separation

– 25 NM and 30 NM lateral separation

– ITP and CDP

• DARP and UPR

• Transition to performance based navigation, communication and surveillance

Overview – Session 3

• Approval requirements for ANSP and operator / aircraft equipment and capability

• Perspectives - ANSP (FAA), CSP (ARINC), SSP (Inmarsat), A/C mfgr (Airbus / Boeing), operator (Delta / IFALPA)

• Post-implementation monitoring (FAA / Airways New Zealand)

• Data link regional monitoring agencies (DLMA and CRO)

Discussion topics

• Amendments needed to ICAO Annexes, PANS, recommended practices and guidance material – Application and flight plan requirements (Doc 4444)

– ATS provision (Annex 11)

– Operational approvals (Annex 6)

– Guidance material – Doc 9869

• Post implementation monitoring

• Feedback to operators and other interested parties on performance issues

• Global coordination and consistent approach

• Adoption of RCP in the EUR Region

• Orderly transition to implement

Discussion topics

• Need to ensure continuous functioning of data link monitoring agencies. Solutions should address the following;

• - joint funding

• - security

• - resource management

• - consider if such solutions could be established under the ICAO administrative umbrella.

• Tightening up the requirements to operators to correct the problems identified by the monitoring agencies

Feedback

• Any follow-up? • Improved coordination between regional data link monitoring agencies is

required

• Was the workshop useful? • Overall assessment of the workshop was very positive

• Should there be another workshop and when? • Need for future workshops to be discussed in the regional groups and

more participation from aircraft operators is essential