Hywind Scotland Pilot Park
Presented by Rune T.AlmåsAS Stordbase
Hywind Demo – In operation since 2009
• 2.3MW WTG
• Located 10km off Norwegian coast at 200m water depth
• In operation since September 2009
• Produced over 140 GWh since start-up
• Capacity factor (overall) 41.4%
• Experienced maximum wind speed of ca.44m/s and maximum wave height of ca.19m
• Performance has been very good
• Best power producing 2.3 MW turbine delivered by Siemens!
Hywind Scotland Pilot Park
• Hywind Scotland
• Area (sea level) ~4 km2
• Water depth 95-120 m
• Average wind speed (@100 m) 10.1 m/s
• Mean waves, Hs 1.8 m
• Installed capacity (5 WTGs) 30 MW
• Offshore export cable length 30 km
• Onshore cable length 2-3 km
• Transmission voltage 33 kV
Hywind Scotland pilot park at a glance
Floating wind - Potential markets
Assembly at Stordbase – Stordbase overview
• Storage areas, inside and outside• Transport lanes between quay,
storage and assembly site• Offices• General assembly area• 5 erection stands• Elephant foot placement• Flotel• Temporary mooring of substructure• Security
SWT-6.0-154 turbine
Rotor Diameter: 154m Rotor Area : 18.600m2
Assembly at Stordbase
Marine Operation – Upending & Filling of solid ballast 38
Marine Operation – Lifting and installation of WTG Tower
Tow from Assembly Site and Hook-up at Installation Site
Takk for meg!!
Takk for meg