Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

19
Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Transcript of Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Page 1: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Hywind Scotland Pilot Park

Presented by Rune T.AlmåsAS Stordbase

Page 2: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase
Page 3: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase
Page 4: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Hywind Demo – In operation since 2009

• 2.3MW WTG

• Located 10km off Norwegian coast at 200m water depth

• In operation since September 2009

• Produced over 140 GWh since start-up

• Capacity factor (overall) 41.4%

• Experienced maximum wind speed of ca.44m/s and maximum wave height of ca.19m

• Performance has been very good

• Best power producing 2.3 MW turbine delivered by Siemens!

Page 5: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase
Page 6: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase
Page 7: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Hywind Scotland Pilot Park

• Hywind Scotland

• Area (sea level) ~4 km2

• Water depth 95-120 m

• Average wind speed (@100 m) 10.1 m/s

• Mean waves, Hs 1.8 m

• Installed capacity (5 WTGs) 30 MW

• Offshore export cable length 30 km

• Onshore cable length 2-3 km

• Transmission voltage 33 kV

Page 8: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Hywind Scotland pilot park at a glance

Page 9: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Floating wind - Potential markets

Page 10: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase
Page 11: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Assembly at Stordbase – Stordbase overview

• Storage areas, inside and outside• Transport lanes between quay,

storage and assembly site• Offices• General assembly area• 5 erection stands• Elephant foot placement• Flotel• Temporary mooring of substructure• Security

Page 12: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

SWT-6.0-154 turbine

Rotor Diameter: 154m Rotor Area : 18.600m2

Page 13: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase
Page 14: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Assembly at Stordbase

Page 15: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase
Page 16: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Marine Operation – Upending & Filling of solid ballast 38

Page 17: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Marine Operation – Lifting and installation of WTG Tower

Page 18: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Tow from Assembly Site and Hook-up at Installation Site

Page 19: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase

Takk for meg!!

Takk for meg