How to manufacture a conveyor for pcb handling

Post on 07-Jan-2017

405 views 0 download

Transcript of How to manufacture a conveyor for pcb handling

www.smthelp.com

Conveyor for PCB automatic

Board Handling System

www.smthelp.com

Design as your require:-Conveyor length: 0.5m;1.0m;1.5m or other- Working lighting- Power supply

www.smthelp.com

1 week lead time

www.smthelp.com

-Simple-Easy to operate

www.smthelp.com

-Long lifetime

www.smthelp.com

Machine ready in stock

www.smthelp.com

*Note: The component providing 'contact closure' may be a relay or a transistor. 'contacts open' will always be infinity but 'contacts closed' may not be 0 ohms. In the case of a transistor it will be approximately 10K ohms and polarity of pins 1 and 3 are positive. Wrong polarity while testing will give false readings.

This conveyor communicates with other machines through a SMEMA (Surface Mount Equipment Manufacturers Association) interface. SMEMA is an equipment standard for single board transfer for manufacturing systems of surface-mounted printed circuit boards. Reference the following chart for interface function

SMEMA Communication/Interface

www.smthelp.com

SMEMA Communication/Interface

www.smthelp.com

Do you need a buffer ?

www.smthelp.com

Buffer to balance your SMT line

www.smthelp.com

Machine ready in stock

www.smthelp.com

Machine Packing for delivery

www.smthelp.com

Buffer Conveyor S-350C• PCB Conveyor rail length: 0.5m;1.0m;1.5m• Rail Fix mode: Front Fix (Option: Rear fix)• PCB Conveyor direction: L→R (Or R→L)• Control System: Relay Board (2 sensor without stopper)• PCB Conveyor Height: 900±20 mm• PCB Conveyor Width: 50-250/300/400/500mm• PCB Conveyor Speed: 0-2M/min• Available to communications with other devices by

SMEMA signal plug• Exact thread shaft structure to ensure the adjustment

of rail Width parallel• Used durable Anti-static belt with strengthen

Aluminum Alloy rail to be reliable• Power Consumption: Approx. 40W• Power Supply: Single Phase 220V, 50HZ • Weight: Approx. 70kg

www.smthelp.com

SMT production line installation

www.smthelp.com

Installation Procedure 1) Set conveyor height

2) Locate in Position

3) Set final transfer height

4) Connect power to enclosure

5) Connect air (if required)

• Adjust to approximate transfer height (+1.00” with telescoping leg). (Hardware located on the backside of leg and control box.) • 0.38” – 0.50” gap between rails of adjacent equipment. • Ensure level transfer by adjusting leveling pads. • Ensure fixed rails are aligned.

• Adjust leveling feet to achieve final height (maintain level). • Tighten lock nuts on leveling pads.

• Connect power to disconnect via provided entry holes. - Line (brown or black) to position #1. - Neutral (blue or white) to position #3. • Connect the ground conductor to the ground block. (Note: It is the user’s responsibility to ensure that power wiring from the customer source to control enclosure meets all applicable local and national wiring codes.)

• 6 ft of ¼” diameter tubing is provided for air hookup.

5 Steps for installation

www.smthelp.com

SMT line in production

www.smthelp.com

Welcome inquiry

1,Please visit : www.smthelp.com

2, Find us more: https://www.facebook.com/autoinsertion

3, Know more our team: https://cn.linkedin.com/in/smtsupplier

4, Welcome to our factory in Shenzhen China

5, See more machine working video, please Youtobe: Auto Insertion

6, Google: Auto+insertion, to get more informations

7,Looking forward to your email: jasonwu@smthelp.com