SunStat® Thermostat

Mortar bed

TapeMat power lead in electrical conduit

Sensor wire

Floor sensor

SunTouch TapeMat

Tile or stone

4Heated

Floorsin

StepsEasy

*After you complete Step 4, wait 28 days for the mortar to cure completely before having a certified electrician connect a SunStat® thermostat.

Attach TapeMat®1.

Install tile*4.

Secure floor sensor2.

Apply thin set3.

electric floor heating & snow melting

TapeMat® electric floor warming mats make installation fast. With SunTouch’s open-weave TapeMat, installation can be completed in one day. There’s no need to wait for mortar to cure overnight.