Post on 15-Apr-2017
Hands-On
byEduardoRibeiroV1.0
edu.f.ribeiro@gmail.com@edu_f_ribeiro
CompanyX
• Company X is struggling to deliver what thecostumer really wants. Nevertheless, theirpaceandqualityforthedeliveredproducts islow.
• The bigger issue is regarding theirStakeholders. They lost their trust on theteams since they are always missing thedeliveries(targetdates).
Closerlook• ReleasesaremadeeveryquarterandsomeLmestheyneedtorollbackduetothenumberofdefects.
• Before every release they assign all the QA’s duringtwoweeks to validate thebuild leaving all the teamswithoutQA’s.
• Productpushalltheirrequeststotheteams.• Duetotheconstantdelay,teamschangesizeoTentorespondtothebadplanning.
• Some Lme there are implementaLons that are notaccordantlywithwhatwasrequested.
• AswespeakthereisallotoftensionbetweeneveryonecreaLngeachdaymorenoiseandbadbehaviors.
Myway
• TrainingandCoachingtotheteamsandstakeholdersaboutLeanAgile.
• ImprovetheircollaboraLonandcommunicaLon.• StriveforMVP.• HighBacklogQuality.• LimittheworkIn-• Fixandself-organizedteams.• ConLnuousIntegraLonandDeliverytoallowmorefrequentandsmallreleases.
QuesLons?