Hands-On at ISEP DEI | 9th of Apr 2016

13
Hands-On by Eduardo Ribeiro V 1.0

Transcript of Hands-On at ISEP DEI | 9th of Apr 2016

Page 1: Hands-On at ISEP DEI | 9th of Apr 2016

Hands-On

byEduardoRibeiroV1.0

Page 2: Hands-On at ISEP DEI | 9th of Apr 2016

[email protected]@edu_f_ribeiro

Page 3: Hands-On at ISEP DEI | 9th of Apr 2016
Page 4: Hands-On at ISEP DEI | 9th of Apr 2016
Page 5: Hands-On at ISEP DEI | 9th of Apr 2016
Page 6: Hands-On at ISEP DEI | 9th of Apr 2016
Page 7: Hands-On at ISEP DEI | 9th of Apr 2016

CompanyX

•  Company X is struggling to deliver what thecostumer really wants. Nevertheless, theirpaceandqualityforthedeliveredproducts islow.

•  The bigger issue is regarding theirStakeholders. They lost their trust on theteams since they are always missing thedeliveries(targetdates).

Page 8: Hands-On at ISEP DEI | 9th of Apr 2016

Closerlook•  ReleasesaremadeeveryquarterandsomeLmestheyneedtorollbackduetothenumberofdefects.

•  Before every release they assign all the QA’s duringtwoweeks to validate thebuild leaving all the teamswithoutQA’s.

•  Productpushalltheirrequeststotheteams.•  Duetotheconstantdelay,teamschangesizeoTentorespondtothebadplanning.

•  Some Lme there are implementaLons that are notaccordantlywithwhatwasrequested.

•  AswespeakthereisallotoftensionbetweeneveryonecreaLngeachdaymorenoiseandbadbehaviors.

Page 9: Hands-On at ISEP DEI | 9th of Apr 2016
Page 10: Hands-On at ISEP DEI | 9th of Apr 2016
Page 11: Hands-On at ISEP DEI | 9th of Apr 2016

Myway

•  TrainingandCoachingtotheteamsandstakeholdersaboutLeanAgile.

•  ImprovetheircollaboraLonandcommunicaLon.•  StriveforMVP.•  HighBacklogQuality.•  LimittheworkIn-•  Fixandself-organizedteams.•  ConLnuousIntegraLonandDeliverytoallowmorefrequentandsmallreleases.

Page 12: Hands-On at ISEP DEI | 9th of Apr 2016

QuesLons?

Page 13: Hands-On at ISEP DEI | 9th of Apr 2016

ThankYou!