Geoteknisk Forening 06.11.2014.ppt … · o Bar bending schedule from 3d models o Data filtering o...

Post on 07-Sep-2018

218 views 0 download

Transcript of Geoteknisk Forening 06.11.2014.ppt … · o Bar bending schedule from 3d models o Data filtering o...

Stockholm- on the rocks, not stirred, not shaken

Geoteknikerens hverdag

6. november 2014

René Mølgaard Jensen

Sidefod

Dias 1

Värtahamnen…future…

Sidefod

Dias 2

Færgelinier i Østersøen

Sidefod

Dias 3

Oversigtsplan

Sidefod

Dias 4

Involved parties

The Client

oStockholm Hamnar & Stockholm Stad

The Contractor

oAarsleff

o JV Värtahamnen HB

oAarsleff & Aarsleff Bygg och Anläggnings AB

The Consult

oCOWI

Sidefod

Dias 5

Mængder

– Piling

934 driven – 111 DTH drilled (Ø900-1,200): 36,000 lm. (20,500 ton)

Sheet piles, KC-piles, jet grouting etc.

– Construction:

Dredging: 14,000 m3

”Frysmuddring”: 3,000 m3

Excavation: 81,000 m3

Filling material: 107,000 m3

Concrete: 45,000 m3 (prefab. 30,000 m3) – pile cap, slabs and L

Reinforcement: 12,000 ton (266 kg/m3)

Sidefod

Dias 6

Tidsplan

Contract:

• Start: 2013-02-01

• Finish: 2016-12-01

• Duration: 46 Month

Phases:

• Phase 1 +2: 30 Month

• Phase 3: 7 Month

Sidefod

Dias 7

Aarsleff organisation

Sidefod

Dias 8

Anbefalede tekniske løsninger

Sidefod

Dias 9

Geoteknisk snit

Sidefod

Dias 10

3D-illustration

Sidefod

Dias 11

Tolket bjergniveau

-55m

-50m

-45m

-40m

-40m

-35m

-30m

-25m

-20m-15m

Jordparametre

Sidefod

Dias 13

F1, F2, F3, F4 og F5

Sidefod

Dias 14

KC-pelare

Snit i KC-pelar forstærkning

Snit i spunsvæg

Snit i spunsvæg for overgangszone

Driveability

Sidefod

Dias 19

IHC S280 whitout noise reduction

Sidefod

Dias 20

IHC S280 whit noise reduction

Sidefod

Dias 21

Stålpæle traditionel pælesko samt åben pælesko

Design af bjergsko

Sidefod

Dias 23

Hvilken bjergsko – hvor?

Sidefod

Dias 24

Alternative bjergsko

Sidefod

Dias 25

Clay – rock - friction

Sidefod

Dias 26

Produktion af bjergsko

Sidefod

Dias 27

Rør, rør og atter rør

Sidefod

Dias 28

Asien - Europa

Sidefod

Dias 29

Rørene ankommet i Stockholm

Sidefod

Dias 30

IHC S280

Sidefod

Dias 31

Installation in panels

Sidefod

Dias 32

Crawler crane LR 1300, LR1280 og LR1100

Sidefod

Dias 33

Template and supply barge

Sidefod

Dias 34

60 m rør, Ø1168 mm og mere end 30 t

Sidefod

Dias 35

KC pelare rig

Sidefod

Dias 36

KC pelare rig på A+A

Sidefod

Dias 37

KC pelare rig

Fryssmuddring

Sidefod

Dias 39

Pile Cap

Standard pladeelement

Armering af dækelementer

Sidefod

Dias 42

Forme til elementer

Sidefod

Dias 43

Armering af pile caps

Sidefod

Dias 44

Lastning af elementer

Sidefod

Dias 45

Lodbrok gi’r den gas

Sidefod

Dias 46

Building information model (BIM)

BIM advantages:

o Geometry

o Build ability

o Visualization of time schedule

o Quantity optimization and minimized waste

o Reporting

o Machine control

o Bar bending schedule from 3d models

o Data filtering

o Better understanding of construction

o Logistics

o Tolerances

Sidefod

Dias 47

BIM is used to optimize the project by building the model in 4D which incl. time schedule.

BIM will be used doing the planning- and execution phase.

Sidefod

Dias 48

Sidefod

Dias 49

Sidefod

Dias 50

Det former sig

Sidefod

Dias 51

Sidefod

Dias 52

Sidefod

Dias 53

Sidefod

Dias 54

Sidefod

Dias 55

3d surfacesPier excavation model for L-Walls

Dias 56

L-walls

Sidefod

Dias 57

ReinforcementBuildability

Dias 58

ReinforcementCut & Bent

2013-09-26

Dias 59

Elementært

Sidefod

Dias 60

Sidefod

Dias 61

Pladen fuld

Sidefod

Dias 62

Sheet PilesAnchors installation sequence

Dias 63

L-WallsAnchors installation sequence

Dias 64

Dias 65

L-WallsAnchors installation sequence

Dias 66

L-WallsGravel bed

Dias 67

L-WallsGravel bed machine

Rock surfaceMisleading anticipated rock level Before and after investigation

Dias 68

Rock surfaceDiff. before and after investigation

Dias 69

ReportingQuantity take-off

Dias 70

ReportingQuantity take-off

Dias 71

As BuiltDry Mix (KC-Piles) piles

2013-09-26

Dias 72

As BuiltDry Mix (KC-Piles) piles

Dias 73

LogisticsPiles / Pile Caps / Deck Elements

Available elements on a certain date are selected and ordered.

Dias 74

Dias 75

WorkflowPiles/Pile Caps/Deck Elements

In background dots – steel pile deliveriesDots in background – steel pile deliveries

Colorful squares – deck element deliveries

Bauer BG46

Sidefod

Dias 76

Planning sketchPiles/Pile Caps/Deck Elements

Dias 77

Sketch is made for distribution after determining workflow.

Dias 78

Planning sketchOverall planning

Sketch is made for distribution after determining workflow.

Dias 79

Sketch is made for distribution after determining workflow.

Planning sketchL-Wall installation

Dias 80

Planning sketchSheet Piles installtion

Dias 81