Post on 05-Jan-2016
description
1
Memorandum on Cooperation for theCLIC detector and physics study
Lucie LinssenCLIC project meeting 11/12/2012
2
groups involved in“world-wide LC detector work”
ILD SiD CALICE LC-TPC FCAL
R&D
R&D
R&D
group(ILC)
group(ILC)
“collab”(CLIC)
hostlab
“collab”(LC)
“collab”(LC)
“collab”(LC)
R&D
CLICd&p
R&DR&D
CLIC detector and physics study
3
CLIC detector and physics studyMemorandum of Cooperation
Basic notions of the organisation are described in the Memorandum of Cooperation
• Link with the LC organisation under ICFA• Link and synergy with the LC concept groups and the LC detector R&D
collaboration
• Institutes can join (semi)-formally
• Formation of an Institute board (IB) with representation from all institutes• IB gives direction to the project• IB appoints persons with roles of responsibility• Rotation of roles of responsibility• Small and enlarged executive bodies (ET and SB)• Link to the CLIC accelerator project via the CLIC Steering Committee • CERN as the host laboratory
CLICd&p
R&D
4
“CLIC detector and physics study”Implementation model based on typical HEP experiment model
CLIC Detector Institute Board (IB)
ChairpersonOne person from each institute
CLIC Detector Executive TeamSpokespersonTechnical CoordinatorMember(s)
Steering Board
Executive teamIB chairpersonAdditional members <= stakeholders for the study
working groups
CLIC Steering Committee
(CSC)acc. + det.
CLIC accelerator organisation here, with very similar structure
CLICd&p
R&D
5
The MoC document…..
Base text(generic and flexible)
Annex 1List of institutes
Annex 2Objectives of the study
Annex 3Organisation
Annex 4Publications / talks
Annex 5CERN host
Annex 6Signature template
“the MoC”
Defined and updated by the IB
CLICd&p
R&D
The MoC is set up in a very flexible way, allowing for future adaptations
6
Objectives of the studyCLICd&p
R&D
7
Admission of partners
Responsibility of the partners
All partners are welcome, initially, on a “best effort” basis.
The MoC “enters into force” once there are at least “8” Partners => the IB will startHope to have the first Institute Board meeting at the CLIC workshop in January 2013
From that moment onwards => the IB decides on the admission of new Partners
CLICd&p
R&D
8
Publications and talksCLICd&p
R&D
9
Signature formWelcome to join !
CLICd&p
R&D
10
MoC status and invitation to joinStatus today => since November 12th, 4 institutes have joined:
• Vinca Institute Belgrade Serbia• Bergen University, Bergen, Norway• Tel Aviv University, Tel Aviv, Israel• CERN
Expected to join within weeks: 4Discussions ongoing, expecting to join within 1-2 months: 4-7
Invitation to all CLIC/CTF3 institutes with interest in the detector & physics studies:
Please contact lucie.linssen@cern.ch for discussion on a possible participation
11
Spare slidesRecycled material, presented in spring 2012
12
These are all CERN-funded projects (e.g. CERN contribution to LHC experiments, accelerator operation, etc, etc)
CERN-LCD
project
this project stands for: “funding to work on LC detectors: ILC/CLIC concepts and R&D”
project leader is Lucie(nominated by CERN DG)
2 explanatory slides, serving just to give background info…
13
ILD SiDCLICd&p
CALICE
LC-TPC FCAL
R&D
R&D
R&D
group(ILC)
group(ILC)
“collab”(CLIC)
hostlab
“collab”(LC)
“collab”(LC)
“collab”(LC)
R&D
CERN LCD project participation
CERN-LCD
projectR&D
CERN-LCD
project
R&D
14
Possible future LC organisation
15
ILD SiDCLICd&p
CALICE
LC-TPC FCAL
R&D
R&D
R&D
group(ILC)
group(ILC)
“collab”(CLIC)
hostlab
“collab”(LC)
“collab”(LC)
“collab”(LC)
R&D
Possible future LC organisation
R&D
steering
review
‘director’coordinator/facilitator
bottom-up coordinating body representatives from blocks below
R&D