Annual Listing of Obligated Projects Federal requirement §450.332 stipulates that on an annual basis, no later than 90 calendar days following the end of the program year, the State, public transportation operator(s), and the MPO shall cooperatively develop a listing of projects for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were obligated in the preceding program year. SCAG in consultation and coordination with the State and county transportation commissions works to develop the annual listing of obligated projects. The county transportation commissions, working with the project sponsors and transit operators within their respective jurisdiction, update project obligation information through use of the SCAG FTIP database. SCAG compiles this information and produces the annual listing of projects utilizing the SCAG FTIP Database. Some of these projects may have additional federal funds programmed in future fiscal years. This information may be found in the current federally approved Transportation Improvement Program which is located on the following link http://scag.ca.gov/RTIP/index.htm
2011
Print Date: 12/23/2009 11:48:51 AM Page: 1 of 8
STP LOCAL 642 642 642 642IMP050509 Total 642 642 642 642
IMP050509 Imperial SSAB IMP050509 CAX63 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,837 Agency CALEXICO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCole Rd. Corridor Improvements; expansion of 2 lane road into 4 lane principal arterial (.5 miles) from Bowker Rd East to SR 98
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
895 895 895 895
IMP090101 Total 895 895 895 895
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalAsphalt Rehabilitation and Reconstruction of Western Avenue from State Highway 86 to Northern City Limits
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
IMP090101 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0PTC 895 Agency BRAWLEY
ARRA - TRANSPORTATION ENHANCEMENT
152 152 152 152
IMP071202 Total 152 152 152 152
IMP071202 Imperial SSAB 6TDL04 NCR25 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,300 Agency BRAWLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN BRAWLEY AT CATTLE CALL PARK. FROM WILLARD AVENUE, AROUND PARK, ENDING AT WILLARD AVENUE. BICYCLE AND PEDESTRIAN IMPROVEMENTS AND LANDSCAPING
CMAQ 836 836 836 836IMP070917 Total 836 836 836 836
IMP070917 Imperial SSAB 6TDL04 NCN25 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 962 Agency BRAWLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalConstruction of Bicycle/Pedestrian Path
DEMO-SAFETEA-LU 1,120 1,120 1,120 1,120IMP050901 Total 1,120 1,120 1,120 1,120
IMP050901 Imperial SSAB IMP050901 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,400 Agency BRAWLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalConstruct road surface improvements and improve road safety from Brawley Water Plant to HWY 86 to 9th Street to 18th Street, Brawley - (HPP 2176)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Imperial County $ In Thousands
2011
Print Date: 12/23/2009 11:48:51 AM Page: 2 of 8
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
302 302 302 302
IMP090402 Total 302 302 302 302
IMP090402 Imperial SSAB 6OM0701 LUM02 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 700 Agency EL CENTRO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRehabilitation of Adams Avenue from Imperial Avenue to La Brucherie Avenue. Curb/Gutter/Sidewalk
STP LOCAL 847 847 847 847
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
800 800 800 800
IMP050502 Total 1,647 1,647 1,647 1,647
PTC 2,472 Agency EL CENTROIMP050502 Imperial SSAB IMP050502 NCR31 L EXEMPT - 93.126 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRemoval and Reconstruction of existing 2 lane Dogwood Rd (1.2 miles) from I-8 Bridge to State Street St - Phase I
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
895 895 895 895
IMP090103 Total 895 895 895 895
IMP090103 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 895 Agency CALIPATRIA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalStreet Improvements of Rehabilitation and Reconstruction of North and South Portion of Main Street between Highway 111/115 and Lyerly Road
CMAQ 243 243 243 243IMP070918 Total 243 243 243 243
IMP070918 Imperial SSAB 6OM0701 VEN03 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 280 Agency CALIPATRIA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCNG Street Sweeper
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
895 895 895 895
IMP090102 Total 895 895 895 895
IMP090102 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,200 Agency CALEXICO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalStreet Rehabilitation of Emerson Avenue from Highway 98 to Third Street.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Imperial County $ In Thousands
2011
Print Date: 12/23/2009 11:48:51 AM Page: 3 of 8
STP LOCAL 1,066 1,066 1,066 1,066IMP050507 Total 1,066 1,066 1,066 1,066
IMP050507 Imperial SSAB IMP050507 NCR31 L EXEMPT - 93.128 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,701 Agency IMPERIAL CITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Rehabilitation of Aten Rd. (2.25 miles) from Vilore Way to Cross Rd and signalization of one intersection; Phase one in FY2007/08 of signalization and Phase two in FY2008/09 of rehabilitation
ARRA - TRANSPORTATION ENHANCEMENT
50 50 50 50
IMP090407 Total 50 50 50 50
IMP090407 Imperial SSAB 6OM0701 LUM04 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 50 Agency HOLTVILLE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRehabilitation of an existing sign located at the 4th Street/SR 115 junction
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
318 318 318 318
IMP090404 Total 318 318 318 318
IMP090404 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 441 Agency HOLTVILLE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalWalnut Avenue Rehabilitation between 5th Street (SR 115) and Fourth Street
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
247 247 247 247
IMP090403 Total 247 247 247 247
IMP090403 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 332 Agency HOLTVILLE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRehabilitation along North side of 9th street between Ceder Avenue and Holt Avenue
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
346 346 346 346
IMP090104 Total 346 346 346 346
IMP090104 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 347 Agency HOLTVILLE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalStreet Improvements of Rehabilitation and Reconstruction along West side of Holt Avenue between Ninth and Tenth Streets
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Imperial County $ In Thousands
2011
Print Date: 12/23/2009 11:48:51 AM Page: 4 of 8
HIGH RISK RURAL ROAD PROGRAM
812 812 812 812
IMP070601 Total 812 812 812 812
IMP070601 Imperial SSAB 6OM0701 NCN95 L EXEMPT - 93.127 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 992 Agency IMPERIAL COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalNear Westmorland - Forrester Rd. Intersection at Cady Rd.: new turning lanes and traffic channelization at nonsignalized intersection
DEMO-SAFETEA-LU 400 400 400 400IMP050905 Total 400 400 400 400
IMP050905 Imperial SSAB IMP050905 NCN29 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 610 Agency IMPERIAL COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalConstruct new sidewalks in the City of Heber-(HPP 3548)
DEMO-SAFETEA-LU 1,920 1,920 1,920 1,920IMP050902 Total 1,920 1,920 1,920 1,920
IMP050902 Imperial SSAB IMP050902 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,500 Agency IMPERIAL COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalKeystone Rd near Imperial, reconstruction of 6 miles to create truck lane from SR 111 to Austin Rd
STP LOCAL 266 266 266 266DEMO-SAFETEA-LU 440 440 440 440
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
552 552 552 552
IMP020801 Total 1,258 1,258 1,258 1,258
IMP020801 Imperial SSAB IMP020801 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,503 Agency IMPERIAL COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBaughman Road Reconstruction from State Route 78/86 to Forrester Road; 0.65 mile of County Road near Westmorland- HPP 2162
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
895 895 895 895
IMP090105 Total 895 895 895 895
IMP090105 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 905 Agency IMPERIAL CITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRehabilitation and Reconstruction of existing pavement on Barioni Road from B Street to P Street
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Imperial County $ In Thousands
2011
Print Date: 12/23/2009 11:48:51 AM Page: 5 of 8
CMAQ 39 39 39 39IMP070925 Total 39 39 39 39
IMP070925 Imperial SSAB 6TDL04 VEN03 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 153 Agency IMPERIAL COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalFour Hybrid Vehicles
CMAQ 65 65 65 65IMP070924 Total 65 65 65 65
IMP070924 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,290 Agency IMPERIAL COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPaving of Various Dirt County Roads
CMAQ 87 87 87 87IMP070920 Total 87 87 87 87
IMP070920 Imperial SSAB 6OM0701 VEN02 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 100 Agency IMPERIAL COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalDiesel Emission Compliant 2 Axle Truck Tractor
CMAQ 117 117 117 117IMP070919 Total 117 117 117 117
IMP070919 Imperial SSAB 6OM0701 VEN02 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 134 Agency IMPERIAL COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalDiesel Emission Compliant Water Truck
HIGH RISK RURAL ROAD PROGRAM
450 450 450 450
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
157 157 157 157
IMP070602 Total 607 607 607 607
IMP070602 Imperial SSAB 6OM0701 LUM02 L EXEMPT - 93.127 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 732 Agency IMPERIAL COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalNear Imperial - Worthington Rd. Intersection at McConnel Rd; new left turn lane at nonsignalized intersection
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Imperial County $ In Thousands
2011
Print Date: 12/23/2009 11:48:51 AM Page: 6 of 8
DEMO-SAFETEA-LU 3,040 3,040 3,040 3,040
FHWA CORRIDORS AND BORDERS PROGRAM
10,000 10,000 10,000 10,000
IMP0021 Total 13,040 13,040 13,040 13,040
IMP0021 Imperial SSAB IMP0021 CAN67 78 7.2 15.7 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 225,603 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
BRAWLEY BYPASS CORRIDOR -- IN AND NEAR BRAWLEY FROM 0.5 MILES SOUTH OF BAUGHMAN ROAD TO MEAD RD - 4 LANE EXPRESSWAY ON SR 86 TO 0.3 MILES NORTH OF MEAD RD. ON SR 111
DEMO-SAFETEA-LU 480 480 480 4800515 Total 480 480 480 480
PTC 8,202 Agency CALTRANS0515 Imperial SSAB 0515 CAN70 8 36.5 37.4 S NON-EXEMPT 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIn El Centro from 0.8 KM West to 0.6 KM East of Imperial Ave Reconstruct Interchange at I-8 and Imperial Ave
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
289 289 289 289
IMP090401 Total 289 289 289 289
IMP090401 Imperial SSAB 6TDL04 NCR31 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 289 Agency WESTMORLAND
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRehabilitation of 7th Street from "H" Street to Center Street
DEMO-SAFETEA-LU 108 108 108 108IMP051101 Total 108 108 108 108
IMP051101 Imperial SSAB IMP051101 NCR31 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 800 Agency WESTMORLAND
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIn Westmorland- South Center Street; Roadway surface improvements, street lighting and storm drain improvements from Baughman Rd. to SR 78/86
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
303 303 303 303
IMP090406 Total 303 303 303 303
IMP090406 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 328 Agency IMPERIAL COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalResurfacing Drew Road from Ross Road to Even Hewes Highway in Imperial County(0.4 miles)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Imperial County $ In Thousands
2011
Print Date: 12/23/2009 11:48:51 AM Page: 7 of 8
FTA 5310 ELD AND DISABI 115 115 115 115IMP090502 Total 115 115 115 115
IMP090502 Imperial SSAB 6OM0701 PAN93 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 130 Agency VARIOUS AGENCIES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalADA Para-Transit for County of Imperial - 2 new Large Type III Buses
FTA 5311 NON-UZA 420 420 420 420FTA 5307-OPERATING 900 900 900 900
IMP33000 Total 1,320 1,320 1,320 1,320
PTC 27,471 Agency IMPERIAL COUNTY
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
IMP33000 Imperial SSAB IMP33000 BUO00 T EXEMPT - 93.126 0
COUNTY WIDE TRANSIT SYSTEM - OPERATING and CAPITAL ASSISTANCEFund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ARRA - FTA 5307 63 1,159 1,222 1,222 1,222FTA 5307 UZA FORMULAR 203 203 203 203
IMP051104 Total 266 1,159 1,425 1,425 1,425
IMP051104 Imperial SSAB IMP051104 TRNH6 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4,906 Agency IMPERIAL COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIn El Centro; regional public bus transfer terminal and passenger waiting area at 7th and State Streets, with misc other bus stop improvements on fixed route system
ARRA - FTA 5311 151 470 621 621 621IMP090106 Total 151 470 621 621 621
IMP090106 Imperial SSAB 6TDL04 TRNH6 T NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 621 Agency BRAWLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTransit Transfer Terminal in the City of Brawley
DEMO-SAFETEA-LU 1,480 1,480 1,480 1,4808020 Total 1,480 1,480 1,480 1,480
8020 Imperial SSAB 8020 CAN76 98 30 32.6 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 8,200 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN CALEXICO FROM 0.5 KM WEST OF DOGWOOD ROAD TO 0.3KM EAST OF ROCKWOOD AVENUE - WIDEN CONVENTIONAL HIGHWAY FROM TWO LANES TO FOUR LANES
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Imperial County $ In Thousands
2011
Print Date: 12/23/2009 11:48:51 AM Page: 8 of 8
FTA 5310 ELD AND DISABI 115 115 115 115IMP090505 Total 115 115 115 115
PTC 130 Agency VARIOUS AGENCIES
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
ARC Paratransit Services for California Department of Developmentally Disabled Services (ARC-Imperial Valley) - Replacement of Paratransit Vehicles with 2 Large Type III Buses
IMP090505 Imperial SSAB 6OM0701 PAR16 T EXEMPT - 93.126 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FTA 5310 ELD AND DISABI 115 115 115 115IMP090504 Total 115 115 115 115
City of El Centro Dial-A-Ride (ARC-Imperial Valley) - Replacement of Paratransit buses with 2 Large Type III BusesFund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
IMP090504 Imperial SSAB 6OM0701 PAR16 T EXEMPT - 93.126 0PTC 130 Agency VARIOUS AGENCIES
FTA 5310 ELD AND DISABI 53 53 53 53IMP090503 Total 53 53 53 53
PTC 60 Agency VARIOUS AGENCIESIMP090503 Imperial SSAB 6OM0701 PAR16 T EXEMPT - 93.126 0
West Shores Dial-A-Ride (ARC-Imperial Valley) - Replacement of gasoline van with 1 Medium Type II Bus
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Grand Total 1,712 14,990 18,616 35,318 35,318 35,318
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Imperial County $ In Thousands
2011
Print Date: 12/23/2009 11:46:07 AM Page: 1 of 31
DEMO-SAFETEA-LU 4,800 4,800 4,800 4,800LAE2198 Total 4,800 4,800 4,800 4,800
LAE2198 Los Angeles SCAB LAE2198 CARH3 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 21,800 Agency CARSON, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
AVALON BLVD INTERCHANGE MODIFICATION AT I-405 IMPROVING AVALON/I-405 INTERCHANGE BY CONSTRUCTING A NEW SOUTHBOUND ON-RAMP, WIDENING NORTHBOUND OFF-RAMP AND ON-RAMP, Widening Avalon Blvd northbound.
DEMO-SAFETEA-LU 800 800 800 800LAE0726 Total 800 800 800 800
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LAE0726 Los Angeles SCAB LAE0726 NCN31 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
VANOWEN/EMPIRE/CLYBOURN RAILROAD CROSSING GRADE SEPARATION STUDY PROJECT
PTC 1,000 Agency BURBANK
DEMO-SAFETEA-LU 160 160 160 160LAE0882 Total 160 160 160 160
LAE0882 Los Angeles SCAB LAE0882 CART2 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,166 Agency BELL GARDENS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
EASTERN AVE IMPROVEMENTS - Reconstruct Eastern Ave from Muller St to Florence Avenue. WIDEN PORTION OF THE STREET 5 FT. TO MATCH EXISTING ULTIMATE WIDTH OF 84 FT. 2-INCH ASPHALT RUBBER OVERLAY & RECONSTRUCTION, RAISED LANDSCAPED MEDIANS, CONCRETE BUS PADS, STRIPING, UNDERGROUND STREET LIGHTING, TRAFFIC SIGNAL MODIFICATIONS/UPGRADES.
DEMO-SAFETEA-LU 4,000 4,000 4,000 4,000LA996343 Total 4,000 4,000 4,000 4,000
LA996343 Los Angeles SCAB LA996343 CARH3 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 24,460 Agency AGOURA HILLS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalU.S. 101 FWY/KANAN RD. INTERCHANGE IMPROVEMENTS - ADD 1 LANE TO NB OFF RAMP (1 TO 2). SAFETEA-LU # 3099
SCENIC BYWAYS DISCRET 994 994 994 994LA0D118 Total 994 994 994 994
LA0D118 Los Angeles SCAB LA0D118 NCN46 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,243 Agency AGOURA HILLS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
HIGHWAY BEAUTIFICATION PROJECT ALONG THE VENTURA FWY CORRIDOR IN AGOURA HILLS (NATIONAL SCENIC BYWAY PROJECT) AT KANAN ROAD INTERCHANGE INCLUDES LANDSCAPING
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:07 AM Page: 2 of 31
RECREATIONAL TRAILS 26 26 26 26LA0G006 Total 26 26 26 26
LA0G006 Los Angeles SCAB 1NL04 NCN27 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 347 Agency DIAMOND BAR
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Sycamore, Canyon Park Trail Phase IV - Recommended for funding under the non-motorized element of the Recreational Trails Program (Grant Award: $304,920). Decomposed granite 2/3 mi
CMAQ 41 41 41 41LAF1717 Total 41 41 41 41
LAF1717 Los Angeles SCAB 1TL104 ITS12 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,072 Agency CULVER CITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Real-Time Motorist Parking Information System Demonstration. This project will provide a real-time information system to communicate and guide motorists to available parking spaces in selected parking structures in the City of Culver City.
STP ENHANCE-RIP TEA 388 388 388 388LAOB7326 Total 388 388 388 388
LAOB7326 Los Angeles SCAB LAOB7326 NCR25 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 464 Agency COMPTON
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
COMPTON CREEK BIKEWAY EXTSN - PHASE III.DSIGN & CNSTRUCT .6 MI OF CLAS 1 BIKE/PED PATH FRM GREENLEAF BL TO ARTESIA FWY.WILL INC BIKE PATH, PED WALKWAY SIGNAGE, STRPNG. (PPNO 2869).
DEMO-SAFETEA-LU 1,200 2,000 3,200 3,200 3,200DEMO - ISTEA 240 6,160 6,400 6,400 6,400
LAE2819 Total 1,440 8,160 9,600 9,600 9,600
LAE2819 Los Angeles SCAB LAE2819 NCR36 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 15,000 Agency COMPTON
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalROSECRANS AVE OVERHEAD and ARTERIAL RECONSTRUCTION PROJECT(NON-CAPACITY).SAFTEA-LU 1321. ISTEA 36.
DEMO - ISTEA 388 388 388 388LA0D478 Total 388 388 388 388
LA0D478 Los Angeles SCAB LA0D478 CAR63 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,200 Agency COMMERCE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRECONSTRUCT OF WASHINGTON BLVD FROM I-5 FWY TO THE WEST; UPGRADE TRAFFIC SIGNALS AND IMPROVE THE EXISITING PAVEMENT
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:07 AM Page: 3 of 31
SECTION 112 428 428 428 428LA0D365 Total 428 428 428 428
LA0D365 Los Angeles SCAB 1AL04 NCR31 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 653 Agency LAWNDALE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCITY STREET IMPROVEMENTS THROUGH RECONSTRUCTION AND REHABILITATION PROJECTS
CMAQ 8 24 32 32 32LA0C8159 Total 8 24 32 32 32
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LA CANADA FLINTRIDGE EAST/WEST BIKEWAY CORRIDOR. DESIGN AND CONSTRUCTION OF 3.42 MILES OF EAST/WEST DIRECTIONAL CLASS II AND CLASS III BIKEWAY IN THE CITY OF LA CANADA FLINTRIDGE.
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
LA0C8159 Los Angeles SCAB 1NL04 NCN26 L TCM 0PTC 49 Agency LA CANADA-FLINTRIDGE
DEMO-SAFETEA-LU 600 1,700 1,700 4,000 4,000 4,000LA000720 Total 600 1,700 1,700 4,000 4,000 4,000
LA000720 Los Angeles SCAB LA000720 CAN72 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 12,553 Agency HAWTHORNE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ROSECRANS/AVIATION INTERSECTION (AVIATION WIDEN TO 3 LANES IN EACH DIRECTION) RAILROAD BRIDGE WIDENING (C-I:44419) SAFETEA-LU # 3799 and # 563
DEMO-SAFETEA-LU 320 320 320 320LAE1388 Total 320 320 320 320
LAE1388 Los Angeles SCAB LAE1388 NCR31 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 460 Agency HAWAIIAN GARDENS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
BLOOMFIELD ST IMPROVEMENT FROM CARSON ST TO N CITY LIMIT. RESURFACE EXISTING AC PAVEMENT, SIGNING AND STRIPING, CONCRETE REPAIR, CONCRETE BUS PAD, LANDSCAPED MEDIAN, LOOP DETECTOR
DEMO-SAFETEA-LU 3,200 3,200 3,200 3,200LA996330 Total 3,200 3,200 3,200 3,200
LA996330 Los Angeles SCAB LA996330 NCN31 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 38,564 Agency EL SEGUNDO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSBCOG - DOUGLAS ST. GAP CLOSURE/RAILROAD GRAD`E SEPARATION.PPNO 2377. (HP # 46) (91 APP ACT, 101-516, 1990)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:07 AM Page: 4 of 31
BRIDGE - LOCAL 1,745 1,745 1,745 1,745LA0C8063 Total 1,745 1,745 1,745 1,745
LA0C8063 Los Angeles SCAB LA0C8063 NCR36 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 61,241 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
RIVERSIDE DR. VIADUCT REPLACEMENT. REPLACEMENT OF EXISTING 2-LANE BRIDGE WITH 2 THROUGH LANES BRIDGE FLARING 4 LANES AT SAN FERNANDO ROAD WITH NEW ROUNDABOUT. BIKE LANE ADDED COMBINED WITH 53C-1932 - WILL RESULT IN INCR. CIRCULATION. PPNO 3105 (53C-0160)
BRIDGE - LOCAL 3,557 3,557 3,557 3,557LA0C8057 Total 3,557 3,557 3,557 3,557
LA0C8057 Los Angeles SCAB 1AL04 CAR60 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 82,500 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
REHAB. FIRST ST BRIDGE TO MAINTAIN 4 TRAFFIC LANES AND STRENGTHEN EXISTING GIRDERS (UNDER A SEPARATE CONSTR PHASE) TO ACCOMODATE THE LIGHT RAIL.PPNO 3104 (53C1166)
CMAQ 107 107 107 107LAF1514 Total 107 107 107 107
LAF1514 Los Angeles SCAB 1NL04 NCR26 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 503 Agency LOS ANGELES COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalEmerald Necklace Bike Trail Project. Design and construct 1.1 miles of Class I bike path to connect Duarte Road to the San Gabriel River Bicycle trail.
INTELLIGENT TRANS SYS 237 237 237 237LA0G074 Total 237 237 237 237
LA0G074 Los Angeles SCAB REG0701 ITS02 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,546 Agency LOS ANGELES COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ATMS INTEGRATION BUENA PARK (ORANGE COUNTY)WITH IEN (LOS ANGELES COUNTY)FIBER OPTIC CABLE ALONG IMPERIAL HIGHWAY FROM CARMENITA RD TO VALLEY VIEW AVENUE AND ALONG VALLEY VIEW AVENUE FROM IMPERIAL HIGHWAY TO ROSECRANS AVENUE
RECREATIONAL TRAILS 80 80 80 80LA0D326 Total 80 80 80 80
LA0D326 Los Angeles SCAB LA0D326 NCN25 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 89 Agency LOS ANGELES COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
DEPARTMENT OF PARKS & RECREATION-KENNETH HAHN TRAIL/WALKWAY PROJECT RT 19-021 PROJECT WILL PROVIDE A ONE MILE TRAIL CONNECTING THE PARK ACCESS BRIDGE WITH VISTA PACIFICA;
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:09 AM Page: 5 of 31
BRIDGE - LOCAL 7,453 7,453 7,453 7,453LA0G104 Total 7,453 7,453 7,453 7,453
LA0G104 Los Angeles SCAB REG0701 NCR36 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 665,002 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBridge No. 53C1880,53, Sixth Street, Over Los Angeles River, E Santa Ana FWY. LSSRP Seismic bridge replacement.
BRIDGE - LOCAL 616 616 616 616LA0F009 Total 616 616 616 616
LA0F009 Los Angeles SCAB LA0F009 CAR60 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,150 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
GLENDALE BLVD. OVER LA RIVER. REHABILITATE / RETROFIT BRIDGE AND WIDEN BY 12 FEET. UPGRADE BRIDGE RAILINGS. NO ADDED LANES. PRELIMINARY ENGINEERING ONLY. CONSTRUCTION TO BE DONE UNDER LA0F007 GLENDALE-HYPERION COMPLEX OF BRIDGES. (BRIDGE #53C1884, BHLS-5006(187))
BRIDGE - LOCAL 240 240 240 240LA0F008 Total 240 240 240 240
LA0F008 Los Angeles SCAB LA0F008 CAR60 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4,504 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
GLENDALE BLVD. OVER L.A RIVER, REHABILITATE / RETROFIT BRIDGE AND WIDEN BY 12 FEET, UPGRADE BRIDGE RAILINGS. NO ADDED LANES. PRELIMINARY ENGINEERING ONLY. CONSTRUCTION TO BE DONE UNDER LA0F007 (53C1881) GLENDALE-HYPERION COMPLEX OF BRIDGES. (#53C-1883)
STP ENHANCE-RIP TEA 1,525 1,525 1,525 1,525LA0D108 Total 1,525 1,525 1,525 1,525
LA0D108 Los Angeles SCAB LA0D108 NCN26 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,536 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
L.A RIVER BIKE PATH PHASE 1C- CLASS 1 BIKEWAY ALONG WEST BANK OF LA RIVER- FLETCHER DR TO BARCLAY ST INCLUDES LIGHTING, SIGNAGE, PAVEMNT MARKINGS & FENCING (LA996245) (PPNO 5006)
BRIDGE - LOCAL 1,692 1,692 1,692 1,692LA0C8086 Total 1,692 1,692 1,692 1,692
LA0C8086 Los Angeles SCAB LA0C8086 CAR60 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 79,640 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
NORTH SPRING ST BRIDGE WIDENING & REHABILITATION. INCLUDES WIDENING THE STRUCTURE & THE WEST APPROACH FROM 4 TO 6 LANES, BIKE ROUTES WILL BE MADE PART OF THE SHOULDERS (53C0859).
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:09 AM Page: 6 of 31
DEMO-SAFETEA-LU 99 99 99 99LAE0937 Total 99 99 99 99
LAE0937 Los Angeles SCAB LAE0937 NCR31 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 123 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
REHABILITATE STREET SURFACES IN SHERMAN OAKS; PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE SHERMAN OAKS AREA. PROJECT WILL NOT ENHANCE TRAFFIC CAP.
DEMO-SAFETEA-LU 640 640 640 640LAE0284 Total 640 640 640 640
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
SOUTHWEST SAN FERNANDO VALLEY RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS. PROJECT WILL NOT ENHANCE TRAFFIC CAPACITY.
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
LAE0284 Los Angeles SCAB LAE0284 NCR31 L EXEMPT 0PTC 2,300 Agency LOS ANGELES, CITY OF
DEMO-SAFETEA-LU 96 96 96 96LAE0180 Total 96 96 96 96
LAE0180 Los Angeles SCAB LAE0180 NCN34 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,200 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LAUREL CANYON BLVD BETWEEN HAMLIN STREET AND VICTORY BLVD. PROJECT WILL PROVIDE FOR PEDESTRIAN SAFETY AND BEAUTIFICATION TREATMENT. ELEMENTS INCLUDE LANDSCAPED MEDIAN ISLANDS.
CMAQ 750 14,250 15,000 15,000 15,000LA0G157 Total 750 14,250 15,000 15,000 15,000
LA0G157 Los Angeles SCAB 1TR08D7B ITS04 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 15,000 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalLACRD - City of Los Angeles Intelligent Parking Management Program.
CMAQ 200 200 200 200LA0G155 Total 200 200 200 200
LA0G155 Los Angeles SCAB 1TR08D7B ITS10 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,000 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalLACRD - Transit signal priority in the City of Los Angeles.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 7 of 31
DEMO-SAFETEA-LU 40 40 40 40LAE2651 Total 40 40 40 40
LAE2651 Los Angeles SCAB LAE2651 NCN27 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 500 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
CONSTRUCT CROSSWALK BUMP-OUTS AND RELATED STREETSCAPE IMPROVEMENTS ON TEMPLE ST BETWEEN HOOVER ST & GLENDALE. PROJECT WILL PROVIDE FOR VARIOUS STREETSCAPE IMPROVEMENTS.
DEMO-SAFETEA-LU 16 16 16 16LAE2591 Total 16 16 16 16
LAE2591 Los Angeles SCAB LAE2591 NCRH1 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 120 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalINSTALL TRAFFIC SIGNAL ON BALBOA BL. AT KNOLLWOOD SHOPPING CENTER
DEMO-SAFETEA-LU 208 208 208 208LAE2476 Total 208 208 208 208
LAE2476 Los Angeles SCAB LAE2476 NCN27 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,000 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ENHANCE PEDESTRIAN ENVIRONMENT AND INCREASE SAFETY ALONG OLYMPIC BL BETWEEN VERMONT AVE AND WESTERN AVE. PROJECT WILL PROVIDE VARIOUS STREETSCAPE IMPROVEMENTS ALONG LIMITS.
DEMO-SAFETEA-LU 84 84 84 84LAE1093 Total 84 84 84 84
LAE1093 Los Angeles SCAB LAE1093 NCR30 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,060 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
SAN FERNANDO RD NORTH - FROM ASTORIA ST TO SAYRE ST. WIDEN ROADWAY AND CONSTRUCT CONCRETE SIDEWALK, CURB, GUTTER, ACCESS RAMPS, AND BULKHEAD.
DEMO-SAFETEA-LU 80 80 80 80LAE1023 Total 80 80 80 80
LAE1023 Los Angeles SCAB LAE1023 NCR31 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 500 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IMPLEMENT VAN NUYS RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN AND AROUND THE VAN NUYS AREA OF THE CITY. NO TRAFFIC CAPACITY
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 8 of 31
CMAQ 229 229 229 229LAF1663 Total 229 229 229 229
LAF1663 Los Angeles SCAB 1TL104 TRRH6 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,671 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Sunset Junction Transit Plaza. Convert an unused roadway section into a Transit Plaza with new concrete platform, street furniture, ped lights, & landscaping, increasing accessibility, transfers & transit use.
CMAQ 153 153 153 153LAF1662 Total 153 153 153 153
LAF1662 Los Angeles SCAB 1TL104 TRRH6 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,115 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Solano Canyon-Zanja Madre-Chinatown-Broadway Bus Stop Improv. Improve 8 bus stops along Broadway-Bernard St to Solano Av with street furniture & landscaping, increasing accessibility, transfers & transit use
CMAQ 320 320 320 320LAF1615 Total 320 320 320 320
LAF1615 Los Angeles SCAB 1NL04 TRRH6 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,990 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalEastside Light Rail Pedestrian Linkage. Improve linkages within 1/4 mile of Metro's Gold Line LRT.
CMAQ 458 458 458 458LAF1613 Total 458 458 458 458
LAF1613 Los Angeles SCAB 1NL04 TRRH6 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,262 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Expo Line Stn Streetscape Project-East Crenshaw to Jefferson. Design & construction of pedestrian related streetscape improvements within 1/4 mile from each of 3 light rail stations along Exposition Blvd between Crenshaw & Jefferson.
CMAQ 172 172 172 172LAF1129 Total 172 172 172 172
LAF1129 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,632 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Widening San Fernando Rd at Balboa Rd. Install a right-turn lane on west side of San Fernando Rd at Balboa Rd to provide add'l capacity; will require ROW acquisition, retaining walls and re-striping
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 9 of 31
DEMO-SAFETEA-LU 200 200 200 200LAE3790 Total 200 200 200 200
LAE3790 Los Angeles SCAB LAE3790 ITS08 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,545 Agency PASADENA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
THE PASADENA ITS INTEGRATES 2 COMPONENTS; TRAFFIC SIGNAL COMMUNICATION AND CONTRL, AND PUBLIC PARKING AVAILABILITY INFO. SAFETEA-LU PRJ #3790
DEMO-SAFETEA-LU 320 320 320 320LAE3126 Total 320 320 320 320
LAE3126 Los Angeles SCAB LAE3126 NCR31 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 690 Agency PARAMOUNT
ROSECRANS AVE STREET IMPROVMENTS FROM GARFIELD AVE TO CENTURY BLVD. RESURACING PAVEMENT SIGNING AND STRIPING, INSTALLING CONCRETE BUS PADS, CONCRETE REPAIR, CROSSWALK REPLACMENTFund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
SECTION 129 - SURFACE TRANSPORTATION PRIORITIES
800 800 800 800
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
235 235 235 235
LA0G205 Total 1,035 1,035 1,035 1,035
LA0G205 Los Angeles SCAB 1AL04 NCR31 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,800 Agency MAYWOOD
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSlauson Avenue Corridor Improvement Project street & median improvements. ARHM overlay and reconstruction, installation of raised landscaped medians, striping.
DEMO-SAFETEA-LU 1,600 1,600 1,600 1,600LAE1696 Total 1,600 1,600 1,600 1,600
LAE1696 Los Angeles SCAB LAE1696 NCR27 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,920 Agency MANHATTAN BEACH
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
RECONSTRUCTION OF THE STRAND STAIRWAYS IN THE CITY OF MANHATTAN BEACH TO IMPROVE BEACH ACCESS AND ACCOMMODATE INCREASED PEDESTRIAN TRAFFIC.
CMAQ 153 153 153 153LAF1846 Total 153 153 153 153
LAF1846 Los Angeles SCAB 1NL04 NCR27 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 714 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalAngels Walk North Hollywood. To promote pedestrian activity within the project limits with a guidebook and 15 on-street information markers at strategic locations.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 10 of 31
DEMO - TEA 21 2,000 2,000 2,000 2,000LA0C8092 Total 2,000 2,000 2,000 2,000
LA0C8092 Los Angeles SCAB LA0C8092 CAN61 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 79,084 Agency SANTA FE SPRINGS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
VALLEY VIEW AVE GRADE SPARATN AT BNSF RAILWAY SOUTH OF STAGE RD. CONSTRUCT A GRADE SPARATN FOR VALLEY VIEW AVE FROM EXSTNG BNSF TRACKS BY CONSTRCTNG A HWY UNDERPASS PPNO 3117 (3022)
ADVANCED CONSTRUCTION CONVERSION
1,800 1,800 1,800 1,800
LA0B103 Total 1,800 1,800 1,800 1,800
LA0B103 Los Angeles SCAB LA0B103 CAX65 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 32,300 Agency SANTA CLARITA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
CONSTRUCT GOLDEN VALLEY ROAD FROM SOLEDAD CANYON TO NEWHALL RANCH ROAD.0 TO 6 LANES. LESS THAN 0.5 MILES-INCLUDES TWO SEPERATE PARALLEL BRIDGE STRUCTURES IDENTIFIED AS BRIDGES 4009 AND 4022 OVER THE SANTA CLARA RIVER, EACH STRUCTURE WILL HAVE 3 LANES.
Section 125 - Surface Transportation Priorities
570 570 570 570
PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE
8,232 8,232 8,232 8,232
FEDERAL RAILROAD ADMINISTRATION EARMARK
1,109 1,109 1,109 1,109DEMO-SAFETEA-LU 4,490 9,155 13,645 13,645 13,645
LA990359 Total 6,169 17,387 23,556 23,556 23,556
LA990359 Los Angeles SCAB LA990359 NCN31 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,345,818 Agency SAN GABRIEL VALLEY COG
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
GRADE SEP XINGS SAFETY IMPR; 35- MI FREIGHT RAIL CORR. THRGH SAN.GAB. VALLEY - EAST. L.A. TO POMONA ALONG UPRR ALHAMBRA &L.A. SUBDIV - ITS 2318 SAFETEA #2178;1436 #1934 PPNO 2318
DEMO-SAFETEA-LU 2,960 2,960 2,960 2,960LA0C57 Total 2,960 2,960 2,960 2,960
LA0C57 Los Angeles SCAB LA0C57 CAN61 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 44,530 Agency PICO RIVERA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ACE/GATEWAY CITIES-CONSTRUCT GRADE SEP. AT PASSONS BLVD IN PICO RIVERA (& MODIFY PROFILE OF SERAPIS AV,)(PART OF ALAMEDA CORR EAST PROJ.)SAFETEA-LU HPP # 1666 (TCRP #54.3)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 11 of 31
DEMO-SAFETEA-LU 800 800 800 800
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
2,000 2,000 2,000 2,000
LAE2843 Total 2,800 2,800 2,800 2,800
LAE2843 Los Angeles SCAB LAE2843 NCR31 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,730 Agency TORRANCE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCRENSHAW BLVD REHABILITATION, MARICOPA ST TO SEPULVEDA BLVD, CITY OF TORRANCE
DEMO-SAFETEA-LU 640 640 640 640LAE2157 Total 640 640 640 640
LAE2157 Los Angeles SCAB LAE2157 CAR63 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,953 Agency TORRANCE
CRENSHAW BLVD REHABILITATION. BETWEEN 182ND ST & 190TH. NEW RIGHT TURN LANES NEAR I-405 RAMPS - NO NEW THROUGH-TRAVEL LANES.Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
STP LOCAL - REGIONAL 7,000 7,000 7,000 7,000
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
2,355 2,355 2,355 2,355
LA000389 Total 9,355 9,355 9,355 9,355
LA000389 Los Angeles SCAB LA000389 CAN61 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 32,439 Agency TORRANCE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalDEL AMO BLVD FROM MADRONA AVE TO CRENSHAW BLVD CONSTRUCT 0 TO 4 LANES NEW GRADE SEPARATION (CFP 6361, 4314; PPNO 2371).
STP LOCAL 642 642 642 642DEMO-SAFETEA-LU 800 800 800 800
LAE2663 Total 1,442 1,442 1,442 1,442
LAE2663 Los Angeles SCAB LAE2663 NCR30 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 6,687 Agency TEMPLE CITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ROSEMEAD BLVD SAFETY ENHANCEMENT AND BEAUTIFICATION: ACTIVITIES BETWEEN PENTLAND ST/ RAILROAD TRACKS AND ROSEMEAD/ CALLITA RD. No additional lanes, or road width.
CMAQ 52 52 52 52LAF1534 Total 52 52 52 52
LAF1534 Los Angeles SCAB 1NL04 NCR26 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 399 Agency SANTA MONICA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Bike Technology Demonstration. Project will consist of design, installation and evaluation of several bicycle technologies, including bicycle activated detection at intersections, bike boxes, and bike parking.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 12 of 31
DEMO-SAFETEA-LU 556 556 556 556LAE1407 Total 556 556 556 556
LAE1407 Los Angeles SCAB LAE1407 CARH3 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 721 Agency WEST COVINA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PLAZA DRIVE FROM VINCENT AVE. TO CALIFORNIA AVE. INCLUDING INSTALLATION OF TRAFFIC SIGNAL SYS AT INTERSECTION OF PLAZA DR. & CALIF. THE SYNC. OF TWO TRAFFIC SY, & ADD TURN LANES.
DEMO-SAFETEA-LU 400 400 400 400LAE0884 Total 400 400 400 400
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IMPROVEMENTS TO THE SOUTH AZUSA AVE./AMAR RD. INTERSECTION (500 FEET IN ALL DIRECTIONS FROM INTERSECTION) IMPROVEMENTS INCLUDE WIDENING, ADDING LEFT LANE, TRAFFIC SIGNAL MODIFICATI
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
LAE0884 Los Angeles SCAB LAE0884 CARH3 L EXEMPT 0PTC 4,200 Agency WEST COVINA
STP LOCAL 3,853 2,395 25,455 31,703 31,703 31,703LA450022 Total 3,853 2,395 25,455 31,703 31,703 31,703
LA450022 Los Angeles SCAB 1AL04 ADM83 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 529,111 Agency VARIOUS AGENCIES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
GROUP PROJECT FOR HIGHWAY SAFETY, REHABILITATION & RECONSTRUCTION, OPERATION, AND SYSTEM BETTERMENTS ACTIVITIES. Projects are consistent with 40CFR part 93.126,127,128, exempt tables 2 & 3
STP ENHANCE - PRIOR STIP 445 445 445 445LA0B100 Total 445 445 445 445
LA0B100 Los Angeles SCAB 1AL04 ADM83 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 66,684 Agency VARIOUS AGENCIES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
TRANSPORTATION ENHANCEMENT ACTIVITIES GROUP (TEA) PROJECT (EXCLUDING CATEGORY 7, PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)
BRIDGE - LOCAL 3,356 3,356 3,356 3,356LA000800 Total 3,356 3,356 3,356 3,356
LA000800 Los Angeles SCAB LA000800 CAR60 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 709,097 Agency VARIOUS AGENCIES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalHBRR LOCAL BRIDGE LUMP SUM - (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 13 of 31
CMAQ 3,000 3,000 3,000 3,000LA0C8012 Total 3,000 3,000 3,000 3,000
LA0C8012 Los Angeles SCAB LA0C8012 NCR87 5 27.4 28.1 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 33,615 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Route 005: I-5 WESTERN AVENUE I/C PHASE I -REALIGNMENT OF I-5 NB OFF & ON RAMPS @ WESTERN. NB EXIT RAMP BEGINS AS 2 AND WIDENS TO 4 LANES AT FLOWER ST. (EA# 1786A, PPNO 2120)
DEMO-SAFETEA-LU 400 400 400 400CMAQ 13,289 13,289 13,289 13,289
LA000358 Total 13,689 13,689 13,689 13,689
LA000358 Los Angeles SCAB LA000358 CAN69 5 26.7 36.4 S TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 699,669 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Route 005: --- FROM ROUTE 134 TO ROUTE 170 HOV LANES (8 TO 10 LANES) (CFP 346)(2001 CFP 8355). (EA# 12180, 12181,12182,12183,12184, 13350 PPNO 0142F,151E,3985,3986,3987) SAFETEA LU # 570. CONSTRUCT MODIFIED IC @ I-5 EMPIRE AVE, AUX LNS NB & SB BETWEEN BURBANK BLVD & EMPIRE AVE; AND MODIFY EXISTING STRUCTURES. ADD AUXILIARY LANE BETWEEN ALAMEDA AND OLIVE FROM PM 28.43 to PM 29.78
DEMO - TEA 21 15,090 15,090 15,090 15,090LA0D73B Total 15,090 15,090 15,090 15,090
LA0D73B Los Angeles SCAB LA0D73B CARH3 5 1.8 3 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 379,730 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRoute 5: IN NORWALK: FROM ORANGE COUNTY LINE TO ROUTE 605: CARMENITA INTERCHANGE IMPROVEMENT (EA 2159C0, PPNO 2808A) (TCRP 42.3, & 43)
DEMO-SAFETEA-LU 1,150 1,150 1,150 1,150LAE1610 Total 1,150 1,150 1,150 1,150
LAE1610 Los Angeles SCAB LAE1610 NCR34 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,632 Agency WHITTIER
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
RECONSTRUCT WHITTIER BLVD AND IMPROVE PARKWAY DRAINAGE FROM PHILADELPHIA STREET TO FIVE POINTS (WASHINGTON BOULEVARD) IN WHITTIER
DEMO-SAFETEA-LU 1,800 1,800 1,800 1,800LAE0191 Total 1,800 1,800 1,800 1,800
LAE0191 Los Angeles SCAB LAE0191 NCN25 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4,890 Agency WHITTIER
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalDESIGN,RIGHT-OF-WAY, AND CONSTRUCT 2.8 MILE BIKEWAY AND PEDESTRIAN PATH FROM MILLS AVE. TO VALLEY HOME IN WHITTIER.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 14 of 31
CMAQ 3,800 5,000 8,800 8,800 8,800LA0G138 Total 3,800 5,000 8,800 8,800 8,800
LA0G138 Los Angeles SCAB 1HL08D01 CAX69 10 9.06 20.7 S TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 8,800 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Route 010: LACRD - HOT lanes on the I-10 from Alameda St./Union Station to I-605, and on I-110 from 182 St./Artesia Transit Center to Adams Blvd. Conversion of HOV lanes to HOT lanes.(Infrastructure/pavement)(1HL08D01, 1HL08D03)
DEMO-SAFETEA-LU 1,600 1,600 1,600 1,600LA0G440 Total 1,600 1,600 1,600 1,600
LA0G440 Los Angeles SCAB LAE0465 CAN69 5 44.9 59 S EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 280,000 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Route 005: PHASE 2 AND 3 OF 3-- IN LA/SANTA CLARITA: PHASE 2 (N/B FR RTE 14 TO WELDON CNYN ROAD; CONSTRUCT HOV LANE )& PHASE 3 (FR SR14 TO PARKER RD OC; CONSTRUCT HOV, TRUCK & AUX LANES (EA 2332C, PPNO 3189A & EA 2332E PPNO 3189B), SAFTETEA-LU#465.
CMAQ 4,500 4,500 4,500 4,500LA996134 Total 4,500 4,500 4,500 4,500
LA996134 Los Angeles SCAB LA996134 CAN71 5 44.3 46 S TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 161,100 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Route 5: RTE. 5/14 INTERCHANGE & HOV LNS ON RTE 14 - CONSTRUCT 2 ELEVATED LANES - HOV CONNECTOR (DIRECT CONNECTORS) (EA# 16800)(2001 CFP 8343) (PPNO 0168M)
STP LOCAL - REGIONAL 650 3,019 3,669 3,669 3,669CMAQ 27,360 27,360 27,360 27,360
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
15,420 15,420 15,420 15,420
LA000357 Total 650 45,799 46,449 46,449 46,449
LA000357 Los Angeles SCAB LA000357 CAR62 5 36.4 39.4 S TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 281,046 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Route 5: --- FROM ROUTE 170 TO ROUTE 118 ONE HOV LANE IN EACH DIRECTION (10 TO 12 LANES) INCLUDING THE RECONSTRUCTION OF THE I-5/SR-170 MIXED FLOW CONNECTOR AND THE CONSTRUCTION OF THE I-5/SR-170 HOV TO HOV CONNECTOR (CFP 345) (2001 CFP 8339; CFP2197). (EA# 121901, PPNO 0158K) (TCRP#41.2)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 15 of 31
DEMO - TEA 21 244 244 244 244LA960142 Total 244 244 244 244
LA960142 Los Angeles SCAB LA960142 NCRH3 101 37.54 38.03 S TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 16,782 Agency WESTLAKE VILLAGE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Rte 101/Lindero Canyon Road Interchange Improvement Project. Lindero Cyn Rd between Via Colinas and Agoura Rd will be widened from 2 to 3 lanes in each direction. Ramp G-6 will be widened to 2 lanes and will provide for 2 free right turn lanes for eastbound Via Colinas traffic at Lindero Cyn Rd. The existing northbound auxiliary lane will be extended southerly from its terminus at Ramp G-6 to Ramp G-3. Also includes bike path construction.
TRANS AND COMM AND SYS PRESRV PILOT PROG
226 226 226 226
INTERSTATE MAINTENANC - EARMARK
732 732 732 732
FHWA CORRIDORS AND BORDERS PROGRAM
1,282 1,282 1,282 1,282
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
690 690 690 690
LA0D344 Total 2,930 2,930 2,930 2,930
LA0D344 Los Angeles SCAB LA0D344 CAR75 101 36.1 36.3 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 11,072 Agency AGOURA HILLS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalWIDENING OF THE REYES ADOBE ROAD OVERCROSSING OF THE 101 FREEWAY FROM 3 LANES TO 6 LANES, ALONG WITH BIKE LANES AND SIDEWALKS
DEMO-SAFETEA-LU 10,632 10,632 10,632 10,632LA0D45 Total 10,632 10,632 10,632 10,632
LA0D45 Los Angeles SCAB LA0D45 CAYT1 47 2.7 5.8 S TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 687,000 Agency ALAMEDA TRANSPORTATION CORRIDOR AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
SR-47 EXPRESSWAY:REPLACEMENT OF SCHUYLER HEIM BRIDGE to include 2 thru lanes and 1 aux lane NB; and 3 thru lanes and 1 aux lane SB; construct expressway and 2-lane flyover. SAFETEA-LU #712 & #3797
CMAQ 3,200 3,200 3,200 3,200LA0G139 Total 3,200 3,200 3,200 3,200
LA0G139 Los Angeles SCAB 1HL08D01 CAX69 10 17.12 32.6 S TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,200 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Route 010: LACRD - Expand capacity of the I-10 HOT lane (restriping and buffer changes). Restripe to add a second lane (WB - Santa Anita to I-710; EB - I-710 to Baldwin Ave) for HOT Lanes on the I-10. (RTP# 1HL08D01)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 16 of 31
NAT'L CORRIDOR INFRASTRUCTURE IMP PROGRAM
3,000 97,000 100,000 100,000 100,000DEMO-SAFETEA-LU 30,000 30,000 30,000 30,000
ARRA - SURFACE TRANSPORTATION PROGRAM
89,900 89,900 89,900 89,900
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
100,000 100,000 100,000 100,000
LA0B408 Total 33,000 97,000 189,900 319,900 319,900 319,900
PTC 1,034,000 Agency LOS ANGELES COUNTY MTALA0B408 Los Angeles SCAB LA0B408 CAX69 405 28.8 39 S NON-EXEMPT 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Route 405: IN LA FROM RTE 10 TO RTE 101 WIDEN FOR HOV LANE & MODIFY RAMPS, ADD NEW WB ON RAMP AT SUNSET & HOV INGRESS/EGRESS AT SANTA MONICA BLV(EA 12030, PPNO 0851G, SAFETLU SECTION 1302 #18, 1934 #20)
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
TRANS AND COMM AND SYS PRESRV PILOT PROG
245 245 245 245
LA0G121 Total 245 245 245 245
LA0G121 Los Angeles SCAB 1AL04 NCR42 210 S EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 294,000 Agency LA CANADA-FLINTRIDGE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
La Canada Flintridge, CA I-210 - Design of Two Soundwall Segments. Design/Engineering of two soundwall segments:Foothill Blvd. Off Ramp to Berkshire Place Westbound On Ramp (North Side of I-210)Georgian Road Eastbound On Ramp to Berkshire Place Eastbound Off Ramp (South Side of I-210)
DEMO-SAFETEA-LU 800 800 800 800LA0D174 Total 800 800 800 800
LA0D174 Los Angeles SCAB LA0D174 CAR63 138 61.5 63.6 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 14,365 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRoute 138: ROUTE 138 WIDENING FROM 2 LANES TO 4 LANES-WIDENING AT TWIN BRIDGES (SEG.11B) EA# 127261, PPNO 3330 (SAFETEALU # 2542)
DEMO-SAFETEA-LU 520 600 1,120 1,120 1,120LAE2713 Total 520 600 1,120 1,120 1,120
LAE2713 Los Angeles SCAB LAE2713 LUM02 110 20 33.2 S EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,450 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Route 110: IN L.A. ON ROUTE 110 -CONDUCT NECESSARY PLANNING, ENGINEERING AND IMPLEMENT COMPREHENSIVE CORRIDOR MANAGEMENT PLAN FOR ARROYO SECO HISTORIC PKWAY
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 17 of 31
CMAQ 424 424 424 424LAF1716 Total 424 424 424 424
LAF1716 Los Angeles SCAB 1TL104 TDM20 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 530 Agency ACCESS SERVICES INC.
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Regional Integration of Paratransit Resources. This project will allow local dial-a-ride agencies and other third-party entities to transmit their unused vehicle capacity into Access Services Uniform Scheduling system.
ARRA - SHOPP 12,225 12,225 12,225 12,225LALS04 Total 12,225 12,225 12,225 12,225
LALS04 Los Angeles Various REG0701 SHP03 999 S EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 132,501 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Route 999: LUMP SUM AT VARIOUS LOCATIONS IN L.A. COUNTY BRIDGE PRESERVATION PROJECTS (PRJS CONSISTENT W/40 CFR PART 93.126,127,128, EXEMPT TBLS 2 & 3) BR LOC = PROP 192 SEISMIC RET. BOND
ARRA - SHOPP 125,610 125,610 125,610 125,610
ARRA - HIGHWAY MAINTENANCE (HM)
2,775 2,775 2,775 2,775
LALS02 Total 128,385 128,385 128,385 128,385
LALS02 Los Angeles Various REG0701 SHP03 999 S EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,142,648 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Route 999: IN LOS ANGELES COUNTY, LUMP SUM ROADWAY PRESERVATION PROJECTS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)
STP ENHANCE-IIP TEA 425 1,328 1,753 1,753 1,753
ARRA - TRANSPORTATION ENHANCEMENT
2,400 2,400 2,400 2,400
LA0D479 Total 425 3,728 4,153 4,153 4,153
LA0D479 Los Angeles SCAB LA0D479 LUM04 999 S EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 14,132 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRoute 999: LOS ANGELES COUNTY ITIP TRANSPORTATION ENHANCEMENT PROJECT LUMP SUM (PPNO 3546, 3547, 3548, 3549, 3550, etc)
STP LOCAL - REGIONAL 145 145 145 145LA996143 Total 145 145 145 145
LA996143 Los Angeles SCAB LA996143 NCR31 710 5.5 6.8 S EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 7,496 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRoute 710: RTE 710 PCH TO DOWNTOWN L.B., PAVEMENT RECON, MEDIAN, LANDSCAPING IMPROVE (EA 2203U, 23640, PPNO: 2945,3248)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 18 of 31
FTA 5307 UZA FORMULAR 1,159 1,159 1,159 1,159LA0D127 Total 1,159 1,159 1,159 1,159
LA0D127 Los Angeles SCAB LA0D127 FUL52 T NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,085 Agency COMMERCE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCONSTRUCT CNG FUELING STATION ON EXISTING FACILITY
STP RAILROAD LOCAL 1,600 1,600 1,600 1,600LA0F063 Total 1,600 1,600 1,600 1,600
LA0F063 Los Angeles SCAB LA0F063 CAN61 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 90,000 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LA-FULLERTON TRIPLE TRACK & GRADE SEP (ROSECRANS) (IN SANTA FE SPRINGS, LA ON THE BNSF LINE. CONSTRUCT TRIPLE TRACK & GRADE SEPARATION AT ROSECRANS AND MARQUARDT AVE. (PPNO 2002A) & Eliminate hazards at railroad grade crossing.
FTA 5309(c) BUS 177 177 177 177LAE0119 Total 177 177 177 177
LAE0119 Los Angeles SCAB LAE0119 BUR17 T NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 640 Agency BURBANK
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCNG REPLACEMENT TRANSIT VEHICLES PURCHASE FOR LOCAL TRANSIT NETWORK
FTA 5309(c) BUS 246 246 246 246LA0D281 Total 246 246 246 246
LA0D281 Los Angeles SCAB REG0702 TRRH6 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 308 Agency BALDWIN PARK
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalDESIGN AND CONSTRUCT PARKING IMPROVEMENTS AT AND ADJACENT TO THE CITY'S EXISTING METROLINK STATION
FTA 5307 UZA FORMULAR 304 304 304 304CMAQ 194 194 194 194
LA9811004 Total 498 498 498 498
LA9811004 Los Angeles SCAB LA9811004 PAR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 618 Agency ARCADIA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPURCHASE OF TEN (10) DIAL-A-RIDE VANS FOR THE ARCADIA TRANSIT SYSTEM REPLACEMENT VEHICLES (MODEL YEAR 1998) RTAA PROJECT
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 19 of 31
FTA 5307 UZA FORMULAR 810 810 810 810LA52101 Total 810 810 810 810
LA52101 Los Angeles SCAB LA52101 BUO00 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 6,480 Agency CULVER CITY MUNI BUS LINES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCertificates of Participation (COP) have been issued for the Culver City Transportation Facility. Payments will be made bi-annually through January 2016.
ARRA - FTA 5307 2,500 2,500 2,500 2,500LA0B358 Total 2,500 2,500 2,500 2,500
LA0B358 Los Angeles SCAB LA0B358 TRR07 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 12,500 Agency CULVER CITY MUNI BUS LINES
Preventative maintenance for the Culver CityBus fleetFund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ARRA - FTA 5307 828 828 828 828FTA 5309(c) BUS 657 657 657 657
LA0G080 Total 1,485 1,485 1,485 1,485
LA0G080 Los Angeles SCAB 1TL204 TRNH6 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4,000 Agency CULVER CITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCulver City Aerial Station for Exposition Light Rail Station.
ARRA - FTA 5307 162 162 162 162LAES744 Total 162 162 162 162
LAES744 Los Angeles SCAB 1TL204 TRR06 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 162 Agency COMMERCE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPurchase of transit performance software. This will assist our City in complying with FTA requirements.
ARRA - FTA 5307 420 420 420 420LAES740 Total 420 420 420 420
LAES740 Los Angeles SCAB 1TL204 BUR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 430 Agency COMMERCE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPurchase new CNG-powered transit bus to replace 1997 diesel bus (327)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 20 of 31
FTA 5309(c) BUS 320 320 320 320
LA0D308 Los Angeles SCAB LA0D308 BUN07 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 400 Agency GARDENA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalDRIVER TRAINING SIMULATOR. PART OF SAFETEA-LU TRANSIT PROJECT #260 ALONG WITH LA000507, LA0D340, AND LA0D307
ARRA - FTA 5307 5,600 5,600 5,600 5,600LA0F048 Total 5,600 5,600 5,600 5,600
LA0F048 Los Angeles SCAB LA0F048 BUO00 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 21,800 Agency FOOTHILL TRANSIT ZONE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPREVENTIVE MAINTENANCE - OPERATING
ARRA - FTA 5307 6,950 6,950 6,950 6,950LA0D12 Total 6,950 6,950 6,950 6,950
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalFACILITY IMPROVEMENTS - POMONA, ARCADIA, ADMIN. OFFICE-SEISMIC RETROFIT
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
LA0D12 Los Angeles SCAB 1OM0702 TRRH6 T EXEMPT 0PTC 8,450 Agency FOOTHILL TRANSIT ZONE
ARRA - FTA 5307 6,565 6,565 6,565 6,565LA0B310 Total 6,565 6,565 6,565 6,565
LA0B310 Los Angeles SCAB LA0B310 BUR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 52,585 Agency FOOTHILL TRANSIT ZONE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalREPLACEMENT CNG & ELECTRIC BUSES - 20 IN FY10 AND 20 IN FY11
ARRA - FTA 5307 1,750 1,750 1,750 1,750LA0B0825 Total 1,750 1,750 1,750 1,750
LA0B0825 Los Angeles SCAB 1OM0702 TRN07 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 7,650 Agency FOOTHILL TRANSIT ZONE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM OPERATING EQUIPMENT - Seat Replacement, Spray Booth, Wash Racks & Wheel Polishers.
FTA 5307 UZA FORMULAR 64 64 64 64LA52105 Total 64 64 64 64
LA52105 Los Angeles SCAB LA52105 BUN07 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 480 Agency CULVER CITY MUNI BUS LINES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPayments for the leaseing of bus tires for the Culver CityBus fleet.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 21 of 31
FTA 5307 UZA FORMULAR 960 960 960 960LA0G144 Total 960 960 960 960
LA0G144 Los Angeles SCAB 1TR204 BUN94 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,200 Agency GARDENA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalLACRD - 2 new gasoline electric hybrid 40 foot buses for the I-110 Harbor Transitway. HOT Lane (Gardena Transit)(RTP# 1TR204).
FTA 5307 UZA FORMULAR 80 80 80 80LA0G053 Total 80 80 80 80
LA0G053 Los Angeles SCAB 1TL104 VEN02 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 100 Agency GARDENA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPurchase of one heavy duty replacement truck for servicing bus stops and zones.
FTA 5307 UZA FORMULAR 2,880 2,880 2,880 2,880LA0D437 Total 2,880 2,880 2,880 2,880
LA0D437 Los Angeles SCAB LA0D437 BUR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 6,040 Agency GARDENA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTEN (10) ALTERNATE FUEL 40 FT. TRANSIT BUSES TO REPLACE:THREE (3) 1995 MODEL & (7) SEVEN 1997 MODEL YEAR BUSES.
FTA 5307 UZA FORMULAR 960 960 960 960LA0D436 Total 960 960 960 960
LA0D436 Los Angeles SCAB LA0D436 BUR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 6,375 Agency GARDENA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalELEVEN (11) ALTERNATE FUEL 40 FT. TRANSIT BUSES TO REPLACE ELEVEN (11) 1995 MODEL YEAR BUSES.
FTA 5309(c) BUS 2,400 2,400 2,400 2,400LA0D340 Total 2,400 2,400 2,400 2,400
LA0D340 Los Angeles SCAB LA0D340 BUN94 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,000 Agency GARDENA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PURCHASE FIVE (5) 40 FT. ALTERNATIVE FUEL BUSES FOR SERVICE EXPANSION. PART OF SAFETEA-LU TRANSIT PROJECT #260 ALONG WITH LA0D308, LA000507, AND LA0D307. Grant #CA-04-0129-00
LA0D308 Total 320 320 320 320
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:10 AM Page: 22 of 31
FTA 5307 UZA FORMULAR 3,751 3,751 3,751 3,751LA0G024 Total 3,751 3,751 3,751 3,751
LA0G024 Los Angeles SCAB 1TL104 BUR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 32,787 Agency LONG BEACH PUBLIC TRANSPORTATION COMPANY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalOn-going fleet replacement (40' & 30', ADA compliant, alternative fuel)
ARRA - FTA 5307 7,970 7,970 7,970 7,970LA0G017 Total 7,970 7,970 7,970 7,970
PTC 9,182 Agency LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA0G017 Los Angeles SCAB REG0702 NCR10 T EXEMPT 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBus Stop Improvements/ Amenities includes: the purchase of Benches, Shelters, Signage, Trash receptacles, Landscaping, Lighting, Artwork and other bus stop related amenities.
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
FTA 5307 UZA FORMULAR 478 478 478 478LA0D396 Total 478 478 478 478
LA0D396 Los Angeles SCAB LA0D396 NCR10 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,519 Agency LONG BEACH PUBLIC TRANSPORTATION COMPANY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total1ST STREET TRANSIT MALL ENHANCEMENTS PHASE II AND CSULB BUS STOP ENHANCEMENTS
ARRA - FTA 5307 3,585 3,585 3,585 3,585LAES412 Total 3,585 3,585 3,585 3,585
LAES412 Los Angeles SCAB 1TL104 BUR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,588 Agency GARDENA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalAdvance the purchase of six (6)alternative fuel replacement buses to FY 2009. Buses will replace six (6) 1997 model year diesel buses.
FTA 5307 UZA FORMULAR 180 180 180 180LA0G185 Total 180 180 180 180
LA0G185 Los Angeles SCAB 1TL204 BUN07 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 225 Agency GARDENA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPurchase of fifteen (15) electronic fareboxes for fixed route buses.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:11 AM Page: 23 of 31
FTA 5309(c) BUS 677 677 677 677LAE0410 Total 677 677 677 677
LAE0410 Los Angeles SCAB 1TL104 BUR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,022 Agency LONG BEACH PUBLIC TRANSPORTATION COMPANY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPURCHASE TEN CLEAN FUEL (HYBRID ELECTRIC), LARGE CAPACITY, ADA COMPLIANT, REPLACEMENT BUSES (SAFETEA-LU # 410)
FTA 5309(c) BUS 677 677 677 677LAE0295 Total 677 677 677 677
LAE0295 Los Angeles SCAB LAE0295 FEN93 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,135 Agency LONG BEACH PUBLIC TRANSPORTATION COMPANY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PURCHASE ONE LARGER EXPANSION (75 PASSENGERS) AND TWO SMALLER REPLACEMENT (40 PASS.) FERRYBOATS & CONST. RELATED DOCK WORK TO FACILITATE THE USE & ACCESSIBILITY OF THE FERRYBOATS
FTA 5309(c) BUS 429 429 429 429LAE0276 Total 429 429 429 429
LAE0276 Los Angeles SCAB LAE0276 NCR10 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,414 Agency LONG BEACH PUBLIC TRANSPORTATION COMPANY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPurchase of transit vehicles and enhancement of bus stops for senior transportation services.
FTA 5307 UZA FORMULAR 8,413 8,413 8,413 8,413LA0G222 Total 8,413 8,413 8,413 8,413
LA0G222 Los Angeles SCAB 1TL204 BUR05 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 49,909 Agency LONG BEACH PUBLIC TRANSPORTATION COMPANY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCapitalization of Preventative Maintenance (equipment maintenance expenses)
ARRA - FTA 5307 8,527 8,527 8,527 8,527FTA 5307 UZA FORMULAR 2,320 2,320 2,320 2,320
LA0G221 Total 10,847 10,847 10,847 10,847
LA0G221 Los Angeles SCAB 1TL204 NCR86 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 20,756 Agency LONG BEACH PUBLIC TRANSPORTATION COMPANY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
The On-going Bus capital project includes: bus components, project administration/ facility improvements, computer equipment, safety/ security equipment, shop equipment, support vehicles and tires.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:11 AM Page: 24 of 31
CMAQ 16,100 16,100 16,100 16,100LA0G150 Total 16,100 16,100 16,100 16,100
LA0G150 Los Angeles SCAB 1TR08D7B BUO00 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 16,100 Agency LOS ANGELES COUNTY MTA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LACRD - I-10 and I-110 HOT lane operations (O & M), including security, TVM and revenue collection services, marketing, new transit (RTP ID 1TR08D7B & 10M08D01; LA0G150, LA0G151, LA0G152,1OM08D02)
FTA 5317 NEW FREEDOM PROGRAM
656 656 656 656
LA0D471 Total 656 656 656 656
NEW FREEDOM PROGRAM ADMINISTRATION, OPERATIONS AND CAPITAL for UZA 2 and UZA 123Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
LA0D471 Los Angeles SCAB LA0D471 BUO00 T EXEMPT 0PTC 66,120 Agency LOS ANGELES COUNTY MTA
FTA 5307 UZA FORMULAR 3,282 3,282 3,282 3,282LA0D337 Total 3,282 3,282 3,282 3,282
LA0D337 Los Angeles SCAB LA0D337 NCR10 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 31,352 Agency LOS ANGELES COUNTY MTA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTRANSIT ENHANCEMENT ACTIVITIES: 1% FORMULA FUNDS - LOS ANGELES COUNTY
FTA 5311 NON-UZA 455 455 455 455LA0D285 Total 455 455 455 455
LA0D285 Los Angeles SCAB 1TL104 PAO00 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 8,773 Agency LOS ANGELES COUNTY MTA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCOUNTYWIDE NON-URBANIZED AREA CAPITAL,OPERATING AND ADMINISTRATIVE ASSISTANCE
FTA 5309(c) BUS 5,400 5,400 5,400 5,400LA0D198 Total 5,400 5,400 5,400 5,400
LA0D198 Los Angeles SCAB LA0D198 NCR10 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,057,000 Agency LOS ANGELES COUNTY MTA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCRENSHAW TRANSIT CORRIDOR (SAFETEA- LU #140): ROW ANALYSIS, ALTERNATIVES ANALYSIS, ENV. DOCUMENTATION, PE
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:11 AM Page: 25 of 31
ARRA - FTA 5309 8,185 8,185 8,185 8,185ARRA - FTA 5307 141,085 141,085 141,085 141,085FTA 5307 UZA FORMULAR 2,000 2,000 2,000 2,000
LA963546 Total 151,270 151,270 151,270 151,270
LA963546 Los Angeles SCAB 1TR08D08 NCR86 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 992,884 Agency LOS ANGELES COUNTY MTA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
BUS & RAIL CAPITAL, INCLUDES FACILITY UPGRADE, EQUIP, SPARE PARTS, NON-REV VEHICLES, MAINTENANCE SUPPORT, ITS, ETC. INCLUDES $5.3 MIL FOR LACRD IMPROVEMENTS.(INCLUDES RTP ID 1TR08D08 & 1TR08D07A & 1TR08D07B)
FTA 5309(a) GUIDEWY 41,400 41,400 41,400 41,400FTA 5307 UZA FORMULAR 43,500 43,500 43,500 43,500
LA963543 Total 84,900 84,900 84,900 84,900
LA963543 Los Angeles SCAB LA963543 BUR05 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,878,025 Agency LOS ANGELES COUNTY MTA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPREVENTIVE MAINTENANCE (CAPITAL & OPERATING MAINTENANCE ITEMS ONLY)
ARRA - FTA 5307 84,000 84,000 84,000 84,000FTA 5309(c) BUS 5,000 5,000 5,000 5,000FTA 5307 UZA FORMULAR 28,449 28,449 28,449 28,449CMAQ 45,059 45,059 45,059 45,059
LA963542 Total 162,508 162,508 162,508 162,508
LA963542 Los Angeles SCAB 1TR08D08 BUN94 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 619,858 Agency LOS ANGELES COUNTY MTA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ACQUISTION REVENUE VEHICLES - 2,554 CLEAN FUEL BUSES: LEASED VEH, FY02 (370) FY03 (30 HC)+FY04(70 HC)+(200 ARTICS);TOTAL OF 1000 BUSES. INCLUDES 28.5 Mil for ACQ OF 41 VEHICLES FOR LACRD (RTP ID 1TR08D08 & 1TR08D07A)
FTA 5307 UZA FORMULAR 3,360 3,360 3,360 3,360LA0G154 Total 3,360 3,360 3,360 3,360
LA0G154 Los Angeles SCAB 1TR08D7A TRRH6 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 55,300 Agency LOS ANGELES COUNTY MTA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LACRD - El Monte Transit Center improvements and El Monte Busway improvements, including bike lockers, ticket vending machines at El Monte Busway stations and up to 10 bus bays.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:11 AM Page: 26 of 31
ARRA - FTA 5307 8,023 8,023 8,023 8,023LAES430 Total 8,023 8,023 8,023 8,023
LAES430 Los Angeles SCAB 1TL204 BUR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 11,025 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPurchase 16 Replacement Buses Alt-Fuel Buses
FTA 5309(c) BUS 1,050 1,050 1,050 1,050LAE0567 Total 1,050 1,050 1,050 1,050
LAE0567 Los Angeles SCAB LAE0567 TRNH6 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,125 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalINTERMODAL TRANSPORTATION CENTER WHICH WOULD ENHANCE PASSENGER SERVICE BETWEEN AREA RAIL AND BUS TRANSIT AND THE LAX AIRPORT.
FTA 5309(c) BUS 850 850 850 850LAE0566 Total 850 850 850 850
LAE0566 Los Angeles SCAB LAE0566 BUN94 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,124 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PURCHASE OF SIX (6) ALTERNATIVE FUELED VEHICLES TO BE USED IN THE EXPANSION OF THE LAX REMOTE TERMINAL FLYAWAY SHUTTLE BUS SYSTEM. LOS ANGELES WORLD AIRPORTS WILL OPERATE THESE BUSES BETWEEN NEW PARK-N-RIDE LOTS AND LAX AIRPORT.
FTA 5307 UZA FORMULAR 20,086 20,086 20,086 20,086LA0G004 Total 20,086 20,086 20,086 20,086
LA0G004 Los Angeles SCAB 1TL104 BUR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 25,107 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPURCHASE 57 REPLACEMENT ALTERNATIVE FUEL 40' BUSES
FTA 5316 JOB ACCESS PROGRAM
4,248 4,248 4,248 4,248
LA990764 Total 4,248 4,248 4,248 4,248
LA990764 Los Angeles SCAB LA990764 TDM24 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 168,726 Agency LOS ANGELES COUNTY MTA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalJOB ACCESS & REVERSE COMMUTER PROGRAM ADMINISTRATION, OPERATIONS AND CAPITAL FOR UZA 2 AND UZA 123
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011 F
Print Date: 12/23/2009 11:46:11 AM Page: 27 of 31
FTA 5307 UZA FORMULAR 960 960 960 960LA55205 Total 960 960 960 960
LA55205 Los Angeles SCAB LA55205 BUN07 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 7,361 Agency MONTEBELLO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalASSOCIATED CAPITAL MAINTENANCE ITEMS (ONGOING)
FTA 5307 UZA FORMULAR 11,462 11,462 11,462 11,462LA0D287 Total 11,462 11,462 11,462 11,462
LA0D287 Los Angeles SCAB LA0D287 BUR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 24,990 Agency MONTEBELLO
PURCHASE OF 40 REPLACEMENT BUSES TOTAL: 32 GASOLINE-ELECTRIC HYBRID LOW FLOOR 40'. 8 GASOLINE-ELECTRIC HYBRID LOW FLOOR 35'.Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FTA 5309(c) BUS 3,386 3,386 3,386 3,386FTA 5309(b) NEW RAIL 3,000 3,000 3,000 3,000
LA29212XY Total 6,386 6,386 6,386 6,386
LA29212XY Los Angeles SCAB LA29212XY LRN92 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 720,464 Agency METRO GOLD LINE FOOTHILL EXTENSION CONSTRUCTION AU
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
METRO RAIL GOLD LINE EXTENSION- PASADENA TO MONTCLAIR 24- MILE, 12- STATION LRT EXTENSION. SAFETEA-LU # 285 LEAD AGENCY WILL CHANGE TO METRO GOLD LINE
CMAQ 85 254 339 339 339LAF1451 Total 85 254 339 339 339
LAF1451 Los Angeles SCAB 1TL104 TRRH6 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 424 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Olive/Pico Bus Stop Improvement. Lengthen the Olive/Pico bus zone by enlarging the island where multiple agency bus stops are located, installing lighting, and constructing a concrete bus pad.
CMAQ 1,036 1,036 1,036 1,036LAF1450 Total 1,036 1,036 1,036 1,036
LAF1450 Los Angeles SCAB 1TL104 TDR64 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,295 Agency LOS ANGELES, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Encino Park-and-Ride Facility Renovation. Renovation of the Encino Park-and-Ride facility in order to address physical and structural deficiencies and add capacity to this heavily utilized facility. Includes 50 new parking spaces and bike lockers.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:11 AM Page: 28 of 31
ARRA - FTA 5307 500 500 500 500LA0D92 Total 500 500 500 500
LA0D92 Los Angeles SCAB 1TL204 TRN08 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,545 Agency SANTA CLARITA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCOUNTYWIDE UNIVERSAL FARE SYSTEM (UFS) PROJECT
ARRA - FTA 5307 80 80 80 80LAES758 Total 80 80 80 80
LAES758 Los Angeles SCAB 1OM0702 TRRH6 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 80 Agency MONTEBELLO
Transit Facility Improvement: Transit Maintenance Facility Improvement, including gas line relocation.Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ARRA - FTA 5307 1,000 1,000 1,000 1,000FTA 5307 UZA FORMULAR 326 326 326 326
LAES757 Total 1,326 1,326 1,326 1,326
LAES757 Los Angeles SCAB 1TL204 ITS01 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,500 Agency MONTEBELLO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCustomer Information System Project: Including automatic vehicle location and real-time passenger information systems.
ARRA - FTA 5307 1,500 1,500 1,500 1,500LAES755 Total 1,500 1,500 1,500 1,500
LAES755 Los Angeles SCAB 1OM0702 TRRH6 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,500 Agency MONTEBELLO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTransit Facility Improvement: Existing Fuel Island Modification. To accomodate Compressed Natural Gas (CNG) fueling infrastructure.
ARRA - FTA 5307 1,500 1,500 1,500 1,500LAES746 Total 1,500 1,500 1,500 1,500
LAES746 Los Angeles SCAB 1OM0702 TRRH6 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,500 Agency MONTEBELLO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Transit Facility Improvement: Fuel Island Underground Storage Tank Modification. Existing facility will be modified to phase out deisel infrastructure and meet fuel demand for MBL's new fleet of 40 Gasoline-Electric Hybrid vehicles.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:11 AM Page: 29 of 31
ARRA - FTA 5307 8,061 8,061 8,061 8,061LA0F094 Total 8,061 8,061 8,061 8,061
LA0F094 Los Angeles SCAB 1TL204 BUR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 8,061 Agency SANTA MONICA MUNICIPAL BUS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalREPLACE TEN (10) THOMAS BUSES (DIESEL WITH LNG BUSES)
ARRA - FTA 5307 1,875 1,875 1,875 1,875LA0F093 Total 1,875 1,875 1,875 1,875
PTC 17,261 Agency SANTA MONICA MUNICIPAL BUSLA0F093 Los Angeles SCAB 1TL104 BUR17 T EXEMPT 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalREPLACE 1997 NEW FLYER BUSES (40 FT-DIESEL WITH LNG BUSES)
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
FTA 5307 UZA FORMULAR 2,400 2,400 2,400 2,400LA0F022 Total 2,400 2,400 2,400 2,400
LA0F022 Los Angeles SCAB 1TL204 NCR10 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 9,375 Agency SANTA MONICA MUNICIPAL BUS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SHELTER PROGRAM (INSTALLATION OF BUS SHELTERS AND REAL TIME TRANSIT INFORMATION)
ARRA - FTA 5307 300 1,136 1,436 1,436 1,436LAF1424 Total 300 1,136 1,436 1,436 1,436
LAF1424 Los Angeles SCAB 1TL104 TDN64 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 5,868 Agency SANTA CLARITA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
McBean Regional Transit Center Park and Ride. Purchase land, design, and construct a regional park-and-ride lot adjacent to the McBean Regional Transit Center in the City of Santa Clarita.
ARRA - FTA 5307 500 500 500 500LAES534 Total 500 500 500 500
LAES534 Los Angeles SCAB 1TL204 BUN07 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 500 Agency SANTA CLARITA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalOn-Board Camera Upgrade
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:11 AM Page: 30 of 31
FTA 5307 UZA FORMULAR 48 48 48 48LA0D11 Total 48 48 48 48
LA0D11 Los Angeles SCAB LA0D11 TRRH6 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 327 Agency TORRANCE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTRANSIT - ENHANCEMENTS
FTA 5307 UZA FORMULAR 120 120 120 120LA0B203 Total 120 120 120 120
LA0B203 Los Angeles SCAB LA0B203 BUN07 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 480 Agency TORRANCE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPURCHASE OF SUPPORT EQUIPMENT - TIRES
FTA 5307 UZA FORMULAR 1,800 1,800 1,800 1,800LA01B111 Total 1,800 1,800 1,800 1,800
LA01B111 Los Angeles SCAB LA01B111 BUR05 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 13,598 Agency TORRANCE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM - PREVENTIVE MAINTENANCE
FTA 5309(c) BUS 836 836 836 836LAE0364 Total 836 836 836 836
LAE0364 Los Angeles SCAB LAE0364 TDR64 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,000 Agency SANTA MONICA MUNICIPAL BUS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSanta Monica's Big Blue Bus/Santa Monica College Transit Service Improvments
ARRA - FTA 5307 2,854 2,854 2,854 2,854FTA 5309(c) BUS 846 846 846 846FTA 5307 UZA FORMULAR 1,600 1,600 1,600 1,600CMAQ 4,266 4,266 4,266 4,266
LAE0172 Total 9,566 9,566 9,566 9,566
LAE0172 Los Angeles SCAB LAE0172 BUR17 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 21,000 Agency SANTA MONICA MUNICIPAL BUS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPURCHASE 21 REPLACEMENT BUSES FOR SANTA MONICA'S BIG BLUE BUS TRANSIT SERVICE
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:11 AM Page: 31 of 31
FTA 5307 UZA FORMULAR 50 50 50 50LA0G216 Total 50 50 50 50
PTC 126 Agency TORRANCE
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
Computer Hardware and Software Upgrade
LA0G216 Los Angeles SCAB 1TL204 TRR07 T EXEMPT 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
CMAQ 1,200 1,200 1,200 1,200LA0G148 Total 1,200 1,200 1,200 1,200
LACRD - I-110 HOT lane operations - new transit services. (RTP# 1TR204)Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
LA0G148 Los Angeles SCAB 1TR204 BUO00 T TCM 0PTC 1,200 Agency TORRANCE
FTA 5307 UZA FORMULAR 2,324 2,324 2,324 2,324LA0G145 Total 2,324 2,324 2,324 2,324
PTC 2,800 Agency TORRANCELA0G145 Los Angeles SCAB 1TR204 BUN94 T TCM 0
LACRD - 4 Buses for the I-110 Harbor Transitway HOT Lane(Torrance Transit). (RTP# 1TR204)
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Grand Total 89,512 129,154 1,102,498 1,321,164 1,321,164 1,321,164
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Los Angeles County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 1 of 14
DEMO-SAFETEA-LU 671 671 671 671ORA020115 Total 671 671 671 671
ORA020115 Orange SCAB ORA020115 PLN40 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,678 Agency MISSION VIEJO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCABOT ROAD BRIDGE TO CAMINO CAPISTRANO -PROVIDE ALT ACCESS TO METROLINK STATION & RELIEF TO INTERCHANGE AT I-5 & AVERY
RECREATIONAL TRAILS 392 392 392 392ORA020802 Total 392 392 392 392
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSALT CREEK TRAIL ENHANCEMENT PROJECT
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
ORA020802 Orange SCAB REG0704 NCR26 L EXEMPT 0PTC 637 Agency LAGUNA NIGUEL
FFY 2006 APPROPRIATIONS EARMARKS
1,980 1,980 1,980 1,980
ORA170602 Total 1,980 1,980 1,980 1,980
ORA170602 Orange SCAB REG0703 LUM01 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,980 Agency LAGUNA BEACH
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalFLAMINGO ROAD RECONSTRUCTION
STP LOCAL - REGIONAL 215 215 215 215ORA120522 Total 215 215 215 215
ORA120522 Orange SCAB ORA120522 CAR63 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,623 Agency HUNTINGTON BEACH
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalHUNTINGTON BEACH - ATLANTA AVE WIDENING (FRM HUNTINGTON TO DELEWARE; FRM 2 TO 4 LNS)
ADVANCED CONSTRUCTION CONVERSION
160 160 160 160
ORA100509 Total 160 160 160 160
ORA100509 Orange SCAB ORA100509 ITS14 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,179 Agency GARDEN GROVE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalDESIGN AND IMPLEMENT HARBOR BOULEVARD ITS IN GARDEN GROVE.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 2 of 14
DEMO-SAFETEA-LU 135 135 135 135ORA990451 Total 135 135 135 135
ORA990451 Orange SCAB ORA990451 NCN25 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 12,779 Agency SAN CLEMENTE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalMULTI-USE TRAIL IN SAN CLEMENTE CONSTRUCTED PARALLEL TO RAILROAD TRACKS. 2.6 MILES LONG.
ADVANCED CONSTRUCTION CONVERSION
20 20 20 20DEMO-SAFETEA-LU 80 80 80 80
ORA100506 Total 100 100 100 100
PTC 145 Agency RANCHO SANTA MARGARITAORA100506 Orange SCAB ORA100506 ITS02 L EXEMPT 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSIGNAL UPGRADES ON AVENIDA DE LAS FLORES, MELINDA ROAD, AVENIDA DE LAS BANDERAS, AND ALMA ALDEA, IN RSM.
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
ARRA - TRANSPORTATION ENHANCEMENT
1,889 1,889 1,889 1,889
ORA990452 Total 1,889 1,889 1,889 1,889
ORA990452 Orange SCAB ORA990452 NCN26 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,436 Agency ORANGE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
TUSTIN BRANCH RAIL TRAIL ALONG THE SANTIAGO CREEK FROM TUSTIN ST. TO WALNUT AVE. AND CITY OWNED RW FROM WALNUT AVE. TO COLLINS AVE. FILLS 2 MILE GAP IN A REGIONAL TRAIL.
DEMO-SAFETEA-LU 1,200 1,200 1,200 1,200ORA020507 Total 1,200 1,200 1,200 1,200
ORA020507 Orange SCAB ORA020507 STUDY L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,500 Agency ORANGE COUNTY COUNCIL OF GOVERNMENTS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalORANGE COUNTY COUNCIL OF GOVERNMENTS (OCCOG) - REDUCE ORANGE COUNTY CONGESTION (ROCC) PROGRAM (INCLUDES STUDIES AND PLANNING)
RECREATIONAL TRAILS 250 250 250 250ORA100605 Total 250 250 250 250
ORA100605 Orange SCAB REG0704 NCR27 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 324 Agency MISSION VIEJO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalOSO CREEK TRAIL - COMPREHENSIVE SIGNAGE INCLUDING 4 KIOSKS AND WAYFINDING SIGNS ALONG 5.5 MILES OF TRAIL
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 3 of 14
STP LOCAL - REGIONAL 2,153 2,153 2,153 2,153
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
32,369 32,369 32,369 32,369
ORA55013 Total 34,522 34,522 34,522 34,522
ORA55013 Orange SCAB ORA55013 NCR31 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 79,771 Agency VARIOUS AGENCIES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
COUNTYWIDE: ROADWAY REHABILITATION OF MAJOR AND PRIMARY ARTERIALS NON-CAPACITY ADDING IMPROVEMENTS (PROJECTS CONSISTENT W/40 CFR PART 93.126,127,128,EXEMPT TABLES 2 & 3
DEMO-SAFETEA-LU 3,800 3,800 3,800 3,800ORA125 Total 3,800 3,800 3,800 3,800
PTC 159,696 Agency SANTA ANAORA125 Orange SCAB ORA125 CAX63 L NON-EXEMPT 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
BRISTOL ST (WARNER TO MEMORY LANE) WIDEN FROM 4 TO 6 LANES (IMPV AT BRISTOL/WARNER (ADD NB/EB/SB THRU LNS; WB RT TRN LN) AND BRISTOL/FIRST (ADD NB/SB THRU LNS; SB LFT/RT/TRN LNS
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
STP LOCAL - REGIONAL 5,443 5,443 5,443 5,443ORA120520 Total 5,443 5,443 5,443 5,443
ORA120520 Orange SCAB ORA120520 CAR63 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 12,437 Agency SANTA ANA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSANTA ANA - GRAND AVE WIDENING (FRM 1ST TO 4TH; FRM 2 TO 3 LNS )
RECREATIONAL TRAILS 116 116 116 116ORA100603 Total 116 116 116 116
ORA100603 Orange SCAB REG0704 NCN25 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 150 Agency SANTA ANA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSANTA ANA RIVER TRAIL FAIRVIEW TRIANGLE HABITAT RESTORATION PROJECT IMPROVEMENTS FOR AND ALONG THE SANTA ANA RIVER TRAIL
STP LOCAL - REGIONAL 2,740 2,740 2,740 2,740ORA120525 Total 2,740 2,740 2,740 2,740
ORA120525 Orange SCAB ORA120525 NCN25 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 6,419 Agency SAN JUAN CAPISTRANO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
SAN JUAN CAPISTRANO - DEL OBISPO WIDENING (WIDEN FRM ALIPAZ TO CAMINO CAPISTRANO; TO ACCOMMODATE BIKE LANES AND SIDEWALK IN EACH DIRECTION)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 4 of 14
STP LOCAL - REGIONAL 2,800 2,800 2,800 2,800ORA000122 Total 2,800 2,800 2,800 2,800
ORA000122 Orange SCAB ORA000122 CAN76 5 16.53 16.53 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 8,943 Agency LAGUNA HILLS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalI-5 @ LA PAZ INTERCHANGE IMPROVEMENTS. EXPAND LA PAZ RD. FROM 4 TO 6 LANES TOTAL. (99-LHILL-GMA-1125)
ARRA - TRANSPORTATION ENHANCEMENT
13 1,499 1,512 1,512 1,512
ORA110607 Total 13 1,499 1,512 1,512 1,512
ORA110607 Orange SCAB ORA110607 NCR31 5 6.1 31.2 S EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,873 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN ORANGE COUNTY, ON ROUTE 5 FROM CALLE JUANITA TO 4TH STREET. PROVIDE ENHANCED PAVING AND LANDSCAPING PPNO #2592
ADVANCED CONSTRUCTION CONVERSION
320 320 320 320
ORA102905 Total 320 320 320 320
ORA102905 Orange SCAB ORA102905 NCN46 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4,360 Agency YORBA LINDA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
CONSTRUCT A BERM & WALL ALONG THE SOUTH SIDE OF ESPERANZA RD FROM IMPERIAL HWY TO WEIR CNYN RD/YORBA LINDA BLVD INCLUDING LANDSCAPING
STP ENHANCE-RIP TEA 1,000 1,000 1,000 1,000
ARRA - TRANSPORTATION ENHANCEMENT
2,150 2,150 2,150 2,150
ORA990907 Total 3,150 3,150 3,150 3,150
ORA990907 Orange SCAB ORA990907 NCN46 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 27,315 Agency VARIOUS AGENCIES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LUMP SUM. TEA FUNDS FOR LANDSCAPING AND OTHER SCENIC IMPROVEMENTS THROUGHOUT ORANGE COUNTY (PROJECTS CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)
STP ENHANCE-RIP TEA 1,092 1,092 1,092 1,092ORA990906 Total 1,092 1,092 1,092 1,092
ORA990906 Orange SCAB ORA990906 NCN25 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 28,672 Agency VARIOUS AGENCIES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LUMP SUM. TEA FUNDS FOR BICYCLE AND PEDESTRIAN FACILITY PROJECTS THROUGHOUT ORANGE COUNTY (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 5 of 14
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
47,888 47,888 47,888 47,888
ORA120336 Total 47,888 47,888 47,888 47,888
ORA120336 Orange SCAB ORA120336 CAX63 91 15.9 2.9 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 77,575 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
SR-91 EASTBOUND LANE ADDITION BETWEEN SR-241 & SR-71, & IMPROVE NB SR-71 CONNECTOR FROM SR-91 TO STD ONE LANE AND SHOULDER WIDTH. 0G0400
ADVANCED CONSTRUCTION CONVERSION
118 118 118 118
ORA040601 Total 118 118 118 118
PTC 1,089 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)ORA040601 Orange SCAB ORA040601 ITS04 91 S EXEMPT 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalACQUIRE AND INSTALL VALUE PRICING PILOT SYSTEM ON THE 91 EXPRESS LANES TO TEST VIABILITY OF DYNAMIC PRICING OF TOLL LANES
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
STP LOCAL - REGIONAL 5,285 5,285 5,285 5,285ORA120506 Total 5,285 5,285 5,285 5,285
ORA120506 Orange SCAB ORA120507 CAY62 74 1.9 3 S EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 40,905 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
WIDEN ROUTE 74 FROM 2 TO 4 LANES - COUNTY SEGMENT (ON ROUTE 74 FROM CITY/COUNTY LINE TO ANTONIO PARKWAY / LA PATA AVE. WIDEN FROM 2 LANES TO 4 LANES) PPNO 4110A EA 08691 SPLIT FROM ORA120507
DEMO - TEA 21 985 985 985 985ORA120320 Total 985 985 985 985
ORA120320 Orange SCAB ORA120320 NCRH3 57 20.9 20.9 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 36,216 Agency BREA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSR-57/LAMBERT RD INTERCHANGE IMPROVEMENTS - RECONFIG EXISTING DIAMOND INTERCHANGE TO LOOP RAMP, ADD SB LN ON OFFRAMP
ADVANCED CONSTRUCTION CONVERSION
1,040 1,040 1,040 1,040
ORA100510 Total 1,040 1,040 1,040 1,040
ORA100510 Orange SCAB ORA100510 CAX62 22 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 13,520 Agency GARDEN GROVE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalREPLACE SR22 INTERCHANGES, CONSTRUCT HOV LANES AND LENGTHEN BRIDGES IN GARDEN GROVE ( MAGNOLIA )
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 6 of 14
FTA 5307 UZA FORMULAR 21,143 21,143 21,143 21,143
ORA020106 Orange SCAB ORA020106 BUO00 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 201,898 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPREVENTATIVE MAINTENANCE (OCTA)
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
500 500 500 500
ORA081501 Total 500 500 500 500
ORA081501 Orange SCAB 2L206 BUR16 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 700 Agency LAGUNA BEACH
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCITY OF LAGUNA BEACH - TROLLEYS (3 REPLACEMENT) OCTA CO-LEAD
INTERSTATE MAINTENANC 1,500 1,500 1,500 1,500
ADVANCED CONSTRUCTION CONVERSION
514 514 514 514
ORA030605 Total 2,014 2,014 2,014 2,014
ORA030605 Orange SCAB ORA030605 CAX63 405 10.3 24.1 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,694,000 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalI-405 FROM SR-73 TO I-605 ADD 1 MF LANE EACH DIR AND PROVIDE ADDITIONAL CAPITAL IMPROVEMENTS. #317
ADVANCED CONSTRUCTION CONVERSION
80 80 80 80DEMO-SAFETEA-LU 320 320 320 320
ORA100507 Total 400 400 400 400
ORA100507 Orange SCAB ORA100507 NCRH3 405 10.2 24.1 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,500 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
CONSTRUCT FOURTH NB THROUGH LANE ON BEACH BLVD AT THE I-405 INTERCHANGE AND REMOVE OFF-RAMP ON I-405 AT BEACH (NORTH-EAST CORNER OF BEACH/EDINGER). CO LEAD WITH WESTMINSTER
SURFACE TRANS PROG-SHOPP 450 462 912 912 912
INTERSTATE MAINTENANC - EARMARK
453 453 453 453
ORA080916 Total 450 915 1,365 1,365 1,365
ORA080916 Orange SCAB REG0701 LUM02 405 9.9 10.8 S EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,365 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN ORANGE COUNTY, I-405 FROM BEAR STREET TO FAIRVIEW ROAD. PROVIDE ROADWAY REHABILITATION INCLUDING PAVEMENT REPAIR.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 7 of 14
FTA 5317 NEW FREEDOM PROGRAM
500 500 500 500
ORA020819 Total 500 500 500 500
ORA020819 Orange SCAB ORA110618 NCRT4 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,126 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FTA SECTION 5317 NEW FREEDOM (MISSION VIEJO) VARIOUS PROJECTS AND TRANSPORTATION SERVICES BEYOND THOSE REQUIRED BY ADA INCLUDING VOUCHER PROGRAMS
FTA 5316 JOB ACCESS PROGRAM
466 466 466 466
ORA020818 Total 466 466 466 466
ORA020818 Orange SCAB ORA110619 STUDY T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,896 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FTA SECTION 5316 JOBS ACCESS REVERSE COMMUTE (MISSION VIEJO) - VARIOUS PROJECTS TO INCREASE TRANSPORTATION ACCESS TO JOBS FOR LOW INCOME INDIVIDUALS, INCLUDING VOUCHER PROGRAMS
FTA 5307 UZA FORMULAR 16 16 16 16ORA020811 Total 16 16 16 16
ORA020811 Orange SCAB 2L206 BUR05 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 32,478 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPURCHASE (66) 40' REPLACEMENT VEHICLE IN ORANGE COUNTY - (66) FY 10/11
FTA 5309(c) BUS 490 490 490 490ORA020810 Total 490 490 490 490
ORA020810 Orange SCAB 2L206 BUR05 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 590 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPURCHASE (1) 40' REPLACEMENT VEHICLE FOR EXPRESS SERVICE IN ORANGE COUNTY FTA# E-2008-BUSP-677
ARRA - FTA 5307 7,680 7,680 7,680 7,680ORA020120 Total 7,680 7,680 7,680 7,680
ORA020120 Orange SCAB REG0702 BUO00 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,537,414 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalFIXED ROUTE OPERATING COSTS
ARRA - FTA 5307 37,470 37,470 37,470 37,470ORA020106 Total 58,613 58,613 58,613 58,613
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 8 of 14
FTA 5307 UZA FORMULAR 479 479 479 479ORA080907 Total 479 479 479 479
ORA080907 Orange SCAB 2TR0709 SEC54 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 19,482 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total1% TRANSIT SECURITY PROJECTS
FTA 5307 UZA FORMULAR 10,926 10,926 10,926 10,926ORA080804 Total 10,926 10,926 10,926 10,926
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRADIO COMMUNICATION SYSTEM UPGRADE
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
ORA080804 Orange SCAB REG0702 BUN07 T EXEMPT 0PTC 28,943 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
ARRA - FTA 5307 22,900 22,900 22,900 22,900ORA080803 Total 22,900 22,900 22,900 22,900
ORA080803 Orange SCAB 2OM0701 BUO00 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 398,313 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCAPITAL COST OF CONTRACTING (COSTS ASSOCIATED WITH CONTRACTING FOR SERVICES SUCH AS PARATRANSIT)
ARRA - FTA 5307 8,002 8,002 8,002 8,002ORA021203 Total 8,002 8,002 8,002 8,002
ORA021203 Orange SCAB ORA021203 BUO00 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 71,342 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPREVENTATIVE MAINTENANCE (MISSION VIEJO)
FTA 5307 UZA FORMULAR 1,011 1,011 1,011 1,011ORA021202 Total 1,011 1,011 1,011 1,011
ORA021202 Orange SCAB ORA021202 PAO00 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 9,921 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS OPERATING ASSISTANCE FTA9 - FOR PARATRANSIT - MISSION VIEJO - UZA
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 9 of 14
FTA 5309(c) BUS 836 836 836 836ORA110616 Total 836 836 836 836
ORA110616 Orange SCAB ORA110616 BUN94 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,009 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS RAPID TRANSIT (BRT) - PURCHASE (3) 40' EXPANSION VEHICLES FOR SERVICE IN ORANGE COUNTY
FTA 5309(c) BUS 4,423 4,423 4,423 4,423ORA110613 Total 4,423 4,423 4,423 4,423
ORA110613 Orange SCAB ORA110613 SEC54 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 5,528 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSECURITY SURVEILLANCE AND MONITORING EQUIPMENT FOR TRANSIT
FTA 5309(c) BUS 41 41 41 41ORA110612 Total 41 41 41 41
ORA110612 Orange SCAB ORA110612 PLN40 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 52 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCITY OF YORBA LINDA SENIOR MOBILITY PROGRAM
FTA 5309(c) BUS 156 156 156 156ORA110611 Total 156 156 156 156
ORA110611 Orange SCAB ORA110611 PAR16 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 195 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCITY OF LA HABRA SENIOR TRANSPORTATION PROGRAM - PURCHASE 2 REPLACEMENT PARATRANSIT VEHICLES
FTA 5307 UZA FORMULAR 10,108 10,108 10,108 10,108ORA090302 Total 10,108 10,108 10,108 10,108
ORA090302 Orange SCAB ORA090302 CON93 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 208,958 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
OCTA SHARE OF THE METROLINK ROLLING STOCK AQUISITION. CARS & LOCOS, UP TO 87 CARS/CABS ORDERED IN FY 06 & IN FUTURE YRS, UP TO 22 CARS/CABS, UP TO 11 LOCOS ORDERED BY FY06, & UP TO 4 LOCOS IN FUTURE
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 10 of 14
FTA 5309(c) BUS 836 836 836 836ORA110625 Total 836 836 836 836
ORA110625 Orange SCAB ORA110625 PLN40 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,047 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
VARIOUS PLANNING & TRANSPORTATION PROJECTS DETERMINED BY THE ORANGE COUNTY COUNCIL OF GOVERNMENTS (OCCOG) TO REDUCE CONGESTION IN OC, INCLUDING SMARTH GROWTH AND INCREASED TRANSIT
FTA 5309(c) BUS 226 226 226 226ORA110624 Total 226 226 226 226
ORA110624 Orange SCAB ORA110624 TRRH6 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,007 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSANTA ANA TRANSIT TERMINAL FACILITY IMPROVEMENTS, INC. INCREASE VENTILATION / SAFETY
FTA 5309(c) BUS 297 297 297 297ORA110621 Total 297 297 297 297
ORA110621 Orange SCAB ORA110621 TDR64 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 372 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalINTERMODAL PARK AND RIDE FACILITY AT DISCOVERY SCIENCE CENTER IN SANTA ANA
FTA 5316 JOB ACCESS PROGRAM
6,867 6,867 6,867 6,867
ORA110619 Total 6,867 6,867 6,867 6,867
ORA110619 Orange SCAB ORA110619 TDM24 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 43,820 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FTA SECTION 5316 JOBS ACCESS REVERSE COMMUTE (JARC)(OCTA) VARIOUS PROJECTS TO INCREASE TRANSPORTATION ACCESS TO JOBS FOR LOW INCOME INDIVIDUALS, INCLUDING VOUCHER PROGRAMS AND VANPOOLS
FTA 5317 NEW FREEDOM PROGRAM
2,923 2,923 2,923 2,923
ORA110618 Total 2,923 2,923 2,923 2,923
ORA110618 Orange SCAB ORA110618 PAN07 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 18,708 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FTA SECTION 5317 NEW FREEDOMS (OCTA) VARIOUS PROJECTS AND TRANSPORTATION SERVIES BEOND THOSE REQUIRED BY ADA, INCLUDING VOUCHER PROGRAMS
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 11 of 14
FTA 5307 UZA FORMULAR 1,014 1,014 1,014 1,014ORA187 Total 1,014 1,014 1,014 1,014
ORA187 Orange SCAB ORA187 BUR16 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,600 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalDEBT SERVICE FOR 1990 AND 1993 COPS FUNDING OF CAPITAL PROJECTS
FTA 5307 UZA FORMULAR 4,793 4,793 4,793 4,793ORA174 Total 4,793 4,793 4,793 4,793
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS OPERATING ASSISTANCE FTA9 - FOR PARATRANSIT (OCTA)
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
ORA174 Orange SCAB ORA174 PAO00 T EXEMPT 0PTC 47,024 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
FTA 5309(c) BUS 1,485 1,485 1,485 1,485ORA120357 Total 1,485 1,485 1,485 1,485
ORA120357 Orange SCAB ORA120357 PLN40 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 13,673 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS RAPID TRANSIT (BRT) GUIDEWAY - ORANGE COUNTY
FTA 5307 UZA FORMULAR 479 479 479 479ORA110634 Total 479 479 479 479
ORA110634 Orange SCAB ORA110634 NCR25 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4,702 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total1% TRANSIT ENHANCEMENTS - BICYCLE AND PEDESTRIAN FACILITIES COUNTYWIDE (OCTA)
FTA 5307 UZA FORMULAR 101 101 101 101ORA110632 Total 101 101 101 101
ORA110632 Orange SCAB ORA110632 NCR25 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 993 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total1% TRANSIT ENHANCEMENTS - BICYCLE AND PEDESTRIAN FACILITIES COUNTYWIDE (MISSION VIEJO)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 12 of 14
FTA 5317 NEW FREEDOM PROGRAM
1,553 1,553 1,553 1,553
FTA 5316 JOB ACCESS PROGRAM
1,068 1,068 1,068 1,068
ORA990909 Total 2,621 2,621 2,621 2,621
ORA990909 Orange SCAB ORA110619 BUO00 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,602 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FTA 5316 - Job Access Reverse Commute (JARC), FTA 5317 New Freedoms Lump Sum (PROJECTS CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3) CAPITAL + 20% MATCH
CMAQ 748 748 748 748ORA65002 Total 748 748 748 748
ORA65002 Orange SCAB ORA65002 TDM20 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 5,984 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
RIDESHARE SERVICES RIDEGUIDE, DATABASE, CUSTOMER INFO, AND MARKETING (ORANGE COUNTY PORTION).Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ARRA - FTA 5307 750 750 750 750FTA 5307 UZA FORMULAR 50 50 50 50
ORA55134 Total 800 800 800 800
ORA55134 Orange SCAB ORA55134 NCR86 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,297 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FACILITY MODIFICATIONS FOR BUS TRANSIT (ELEVATOR UPGRADES, JOINT SEALANT, FALL PROTECTION, VEHICLE LIFTS AND OTHER FACILITY MODIFICATIONS)
FTA 5307 UZA FORMULAR 50 50 50 50ORA37122 Total 50 50 50 50
ORA37122 Orange SCAB ORA37122 BUN07 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 8,047 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalVEHICLE MODIFICATIONS/MISC, REPLACE SUPP VEHICLES AND SUPPORT EQUIP, BUS AND FACILITY EQUIPMENT
FTA 5309(a) GUIDEWY 16,398 16,398 16,398 16,398ORA37111 Total 16,398 16,398 16,398 16,398
ORA37111 Orange SCAB ORA37111 TRR15 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 90,212 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
CAPITAL MAINTENANCE ON METROLINK SYSTEM. (REHAB OF TRACK, SIGNAL, COMMUNICATIONS, STRUCTURES, FACILITIES, MAINTENANCE OF WAY RAIL SPURS, AND ROLLING STOCK)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 13 of 14
FTA 5310 ELD AND DISABI 592 592 592 592ORA080906 Total 592 592 592 592
ORA080906 Orange SCAB 2TR0703 PAN93 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 669 Agency VARIOUS AGENCIES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalORANGE COUNTY ARC - TEN (SE) LARGE BUSES TYPE III, CAMERAS
FTA 5310 ELD AND DISABI 205 205 205 205ORA080905 Total 205 205 205 205
ORA080905 Orange SCAB 2TR0703 PAN93 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 232 Agency VARIOUS AGENCIES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCITY OF HUNTINGTON BEACH SENIORS - Two (R) Large Bus - VII, One (SE) Mini Van-Type IV
FTA 5310 ELD AND DISABI 265 265 265 265ORA080904 Total 265 265 265 265
ORA080904 Orange SCAB 2TR0703 PAN93 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 299 Agency VARIOUS AGENCIES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalABRAZAR - Three (R) Small Buses Type1A ,Three SE Small Buses Type1A, Eight MRs
ARRA - FTA 5309 1,234 1,234 1,234 1,234ORA080801 Total 1,234 1,234 1,234 1,234
ORA080801 Orange SCAB 2TR0704 CON07 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 250,000 Agency SOUTHERN CALIF REGIONAL RAIL AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
POSTIVE TRAIN CONTROL FOR METROLINK WILL HELP TO PREVENT TRAIN-TO-TRAIN COLLISIONS, SPEEDING AND OVER-SPEED DERAILMENTS, AND MOVEMENT OF A TRAIN THROUGH A WRONG RAIL SEGMENT OR INTO TRACK WORK ZONES. THE IMPLEMENTATION OF THE PROJECT WILL ENHANCE THE SAF
FTA 5317 NEW FREEDOM PROGRAM
1,689 1,689 1,689 1,689
FTA 5316 JOB ACCESS PROGRAM
1,222 1,222 1,222 1,222
ORA990910 Total 2,911 2,911 2,911 2,911
ORA990910 Orange SCAB ORA110619 BUO00 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 5,880 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FTA 5316 - Job Access Reverse Commute (JARC), FTA 5317 New Freedoms Lump Sum (PROJECTS CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3) OPERATING + 50% MATCH
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:46:59 AM Page: 14 of 14
FTA 5310 ELD AND DISABI 135 135 135 135ORA110617 Total 135 135 135 135
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 270 Agency VARIOUS AGENCIES
ABRAZAR - PURCHASE (1) SMALL BUS, (2) MINVANS, (8) RADIOS, BASE STATION, COMPUTER EQUIPMENT TO EXPAND PARATRANSIT SERVICE (FY07 CYCLE)
ORA110617 Orange SCAB 2TR0703 PAN93 T EXEMPT 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FTA 5310 ELD AND DISABI 77 77 77 77ORA110610 Total 77 77 77 77
ORA110610 Orange SCAB ORA110610 PAR16 T EXEMPT 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalST JUDE HOSPITAL - PURCHASE (2) REPLACEMENT MINI VANS FOR PARATRANSIT SERVICE (FY07 CYCLE)
PTC 87 Agency VARIOUS AGENCIES
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
FTA 5310 ELD AND DISABI 45 45 45 45ORA110609 Total 45 45 45 45
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ORA110609 Orange SCAB ORA110609 PAR16 T EXEMPT 0
GOLDEN RAIN FOUNDATION LAGUNA WOODS PRUCHASE (1) REPLACEMENT LARGEST BUS FOR PARATRANSIT SERVICE (FY07 CYCLE)
PTC 51 Agency VARIOUS AGENCIES
FTA 5310 ELD AND DISABI 45 45 45 45ORA110608 Total 45 45 45 45
PTC 51 Agency VARIOUS AGENCIESORA110608 Orange SCAB ORA110608 PAR16 T EXEMPT 0
EASTER SEALS SOUTHERN CALIFORNIA - PURCHASE (1) REPLACEMENT MODIFIED VAN FOR PARATRANSIT SERVICE (FY07 CYCLE)
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Grand Total 7,044 9,471 277,361 293,876 293,876 293,876
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Orange County $ In Thousands
2011
Print Date: 12/23/2009 11:48:07 AM Page: 1 of 24
STP LOCAL 92 92 92 92RIV52001 Total 92 92 92 92
RIV52001 Riverside SCAB RIV52001 LUM02 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 14,256 Agency CITIES & COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN RIVERSIDE CNTY LUMP SUM - REHABILITATION & RECONSTRUCTION PROJECTS (PROJECTS CONSISTENT W/ 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3).
STP LOCAL 3,483 3,483 3,483 3,483RIV031223 Total 3,483 3,483 3,483 3,483
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
RIV031223 Riverside SCAB RIV031223 LUM02 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
IN RIVERSIDE COUNTY LUMP SUM FOR REHABILITATION AND RECONSTRUCTION PROJECTS (NON CAPACITY ENHANCING PROJECTS) (CONSISTENT W/ 40 CFR PART 93.126, 127, 128, EXEMPT TABLE 2 &3)
PTC 25,440 Agency CITIES & COUNTY
CMAQ 32 32 32 32RIV071247 Total 32 32 32 32
RIV071247 Riverside SSAB 3ITS0701 ITS02 L EXEMPT - 93.128 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 253 Agency CATHEDERAL CITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN CATHEDRAL CITY - SIGNAL SYNCHRONIZATION ALONG EAST PALM CANYON FROM EAST BUDDY ROGERS TO ALLEN AVE: SYNCHRONIZE LIGHTS AT FOUR INTERSECTIONS WHERE ROADWAY LANES VARY FROM A 6 LN ARTERIAL TO A 4 LN ARTERIAL AT INTERVALS.
CMAQ 9 9 9 9RIV071245 Total 9 9 9 9
RIV071245 Riverside SSAB 3AL104 NCR30 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 156 Agency CATHEDERAL CITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN CATHEDRAL CITY – NORTH & SOUTH SIDES OF VARNER RD. (MOUNTAIN VIEW TO PALM DR.), & ON THE WEST AND EAST SIDES OF PALM DRIVE (VARNER RD TO ¼ MILE N/O I-10): PM-10 STABILIZATION - PLACE ASPHALT GRINDINGS ALONG ROADSIDE FOR ROADSIDE STABILIZATION.
SURFACE TRANS PROG - HR4818
2,952 2,952 2,952 2,952
RIV070301 Total 2,952 2,952 2,952 2,952
RIV070301 Riverside SCAB 3AL204 NCRT1 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 6,835 Agency BEAUMONT
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN BEAUMONT ON OAK VALLEY PKWY AT NOBLE CREEK - RECONSTRUCT AND REPLACE EXISTING 2 LANE BRIDGE WITH A NEW 2 LANE ALL WEATHER BRIDGE WITH BIKE LANES (FY 05 HR4818)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:07 AM Page: 2 of 24
CMAQ 124 124 124 124
RIV050504 Riverside SSAB RIV050504 NCR30 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 175 Agency INDIO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
CVAG PM-10 PROGRAM PHASE 5: IN THE CITY OF INDIO - PAVE EXISTING CITY OWNED DIRT PARKING LOT AT SOUTHWEST CORNER OF MILES AVE AND KING ST
CMAQ 215 215 215 215RIV050503 Total 215 215 215 215
RIV050503 Riverside SSAB RIV050503 NCR30 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 304 Agency INDIO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
CVAG PM-10 PROGRAM PHASE 5: IN ITHE CITY OF INDIO - PAVE EXISTING CITY OWNED DIRT PARKING LOT AT NORTHWEST CORNER OF DR. CARREON BLVD AND BRISTOL ST
CMAQ 27 27 27 27RIV071237 Total 27 27 27 27
RIV071237 Riverside SSAB 3ITS07 NCNH2 L EXEMPT - 93.128 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 517 Agency DESERT HOT SPRINGS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN THE CITY OF DESERT HOT SPRINGS - AT THE INTERSECTION OF PALM DR. & CAMINO CAMPANERO: INSTALL NEW TRAFFIC SIGNAL AT THE INTERSECTION OF PALM DR./CAMINO CAMPANERO, AND THE SYNCHRONIZATION OF FIVE SIGNALIZED INTERSECTIONS ALONG PALM DRIVE (CAMINO CAMPANERO TO PIERSON BLVD), WITH HARD WIRE INTERCONNECT.
SECTION 115 1,925 1,925 1,925 1,925
FFY 2006 APPROPRIATIONS EARMARKS
450 450 450 450
RIV050304 Total 2,375 2,375 2,375 2,375
RIV050304 Riverside SSAB RIV050304 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,545 Agency DESERT HOT SPRINGS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
REHAB/RECON 100+ CITY BLOCKS OF STREETS (1ST, 2ND, 3RD, & 8TH STREETS PLUS CACTUS DR) INCLUDING CURB/GUTTERS, SPLASH APRONS, ADA RAMPS, SIDEWALKS, STORM DRAINS, ETC. (FY 04 App)
PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE
1,100 1,100 1,100 1,100
RIV011241 Total 1,100 1,100 1,100 1,100
RIV011241 Riverside SCAB RIV011241 NCN31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 32,000 Agency CORONA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN CORONA ON AUTO CENTER DRIVE - CONSTRUCT 4 LANE OVERCROSSING (GRADE SEPARATION) OVER EXISTING BNSF TRACKS.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:07 AM Page: 3 of 24
BRIDGE - LOCAL 260 260 260 260RIV031206 Total 260 260 260 260
RIV031206 Riverside SSAB RIV031206 CAR63 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4,875 Agency PALM SPRINGS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ON S. PALM CANYON DR OVER ARENAS CANYON SOUTH DRAINAGE CHANNEL: REPLACE EXISTING 4 LANE LOW-WATER CROSSING WITH A NEW 4-LANE BRIDGE, INCLUDING DRAINAGE IMPROVEMENTS CONSISTING OF LEVEE CHANNELIZATION (HBRR #: 00L0027).
STP LOCAL 4,038 4,038 4,038 4,038RIV010213 Total 4,038 4,038 4,038 4,038
RIV010213 Riverside SSAB RIV010213 CAX60 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 6,133 Agency PALM SPRINGS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
WIDEN GENE AUTRY TRAIL FROM 2 TO 6 LANES (3 IN EACH DIRECTION), INCLUDING WIDENING OF EXISTING UPRR OVERCROSSING (BRIDGE 56C0082) FROM 1700' S/O UPRR BRIDGE TO SALVIA ROAD.
CMAQ 44 44 44 44RIV071243 Total 44 44 44 44
RIV071243 Riverside SSAB 3AL104 NCRH1 L EXEMPT - 93.127 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 775 Agency PALM DESERT
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN THE CITY OF PALM DESERT – FREE RIGHT TURN LANE-WB FRED WARING DR TO NB HWY 111: RECONFIGURATION OF A FREE RIGHT TURN LANE AT THEINTERSECTION FROM WEST BOUND FRED WARING DR TO NORTH BOUND HWY 111..
CMAQ 233 233 233 233RIV071239 Total 233 233 233 233
RIV071239 Riverside SSAB 30M0701 VEN03 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 270 Agency INDIO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN THE CITY OF INDIO - CLEAN VEHICLE ACQUISITION PROGRAM: REPLACE 1997 DIESEL STREET SWEEPER AND 1981 BOOM TRUCK WITH LNG VEHICLES.
CMAQ 790 790 790 790RIV071238 Total 790 790 790 790
RIV071238 Riverside SSAB 30M0701 NCNH2 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 992 Agency INDIO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN THE CITY OF INDIO - AVE 48 TRAFFIC SIGNAL INTERCONNECT & TRAFFIC SIGNAL INSTALLATION: INSTALL TWO NEW TRAFFIC SIGNALS AT THE INTERSECTIONS OF AVENUE 48/SHIELD ROAD AND AT AVENUE 48/ARABIA STREET, AND INTERCONNECT 7 EXISTING TRAFFIC SIGNALS AND THE 2 NEW TRAFFIC SIGNALS ON AVE 48 BTWN JEFFERSON AND CALHOUN ST.
RIV050504 Total 124 124 124 124
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:07 AM Page: 4 of 24
DEMO-SAFETEA-LU 600 600 600 600RIV050301 Total 600 600 600 600
RIV050301 Riverside SCAB RIV050301 STUDY L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 10,388 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
CETAP - RIVERSIDE CNTY TO ORANGE CNTY CORRIDOR: FOR PA&ED & PRE-DESIGN WORK IN SUPPORT OF ENVIRONMENTAL DOCUMENT DEVELOPMENT (Earmarks: FY05 HR4818 + SAFETEA LU #122+363)
STP ENHANCE-RIP TEA 3,877 3,877 3,877 3,877
ARRA - TRANSPORTATION ENHANCEMENT
2,198 2,198 2,198 2,198
RIV041047 Total 6,075 6,075 6,075 6,075
RIV041047 Riverside SCAB RIV041047 LUM04 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 19,557 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTHROUGHOUT RIVERSIDE COUNTY - LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS (LS Projects per Title 40 CFR Section 93.126 Table 2).
PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE
2,500 2,500 2,500 2,500
RIV060123 Total 2,500 2,500 2,500 2,500
RIV060123 Riverside SCAB RIV060123 NCN31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 37,350 Agency RIVERSIDE COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN NORTHWEST RIVERSIDE COUNTY ON CLAY ST FROM APPROX 100' SW OF GENERAL DR TO APPROX 500' N/O LINARES AVE: REPLACE EXISTING 4-LANE (2 LNS IN EACH DIRECTION) AT GRADE R/R X-ING WITH A 4-LN (2 LNS IN EACH DIRECTION - NON-CAPACITY) UNDERCROSSING (UPRR).
BRIDGE - LOCAL 80 80 80 80RIV990727 Total 80 80 80 80
RIV990727 Riverside SSAB RIV990727 CAX63 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 5,019 Agency PALM SPRINGS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN PALM SPRINGS: WIDEN INDIAN CANYON DR FROM 2 TO 6 LANES (3 IN EACH DIRECTION), FROM UPRR OVERCROSSING (BRIDGE 56C0025) TO GARNET AVE (HBRR#:56C0025)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 5 of 24
STP LOCAL 472 472 472 472RIV080601 Total 472 472 472 472
RIV080601 Riverside SCAB RIV080601 NCN46 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 652 Agency SAN JACINTO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN THE CITY OF SAN JACINTO – ON SEVENTH STREET, DILLON, ASH ST., AND MAIN ST.: INSTALL LANDSCAPE IMPROVEMENTS IN THE PUBLIC RIGHT-OF-WAY ENCIRCLING THE ESTUDILLO MANSION HERITAGE PARK.
DEMO-SAFETEA-LU 1,000 1,000 1,000 1,000CMAQ 317 317 317 317
RIV990703 Total 1,317 1,317 1,317 1,317
RIV990703 Riverside SCAB RIV990703 CAN72 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 24,048 Agency RIVERSIDE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN RIVERSIDE AT JURUPA AVE AND UP RR - CONSTRUCT UNDERPASS AND CLOSE DOWN MOUNTAIN VIEW AVE AT UPRR TRACKS (SAFETEA LU HPP #3774)
STP LOCAL 400 400 400 400
PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE
4,050 4,050 4,050 4,050
RIV070703 Total 4,450 4,450 4,450 4,450
RIV070703 Riverside SCAB 3GL04 NCN31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 32,000 Agency RIVERSIDE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN RIVERSIDE ON IOWA AVE: REPLACE EXISTING 4 LANE (2-LNS IN EA DIR) R/R X-ING WITH A 4 LANE (2-LNS IN EA DIR - NON-CAPACITY) O.C. GRADE SEPARATION ON IOWA AVE BTWN SPRING ST & PALMYRITA AVE W/PEDESTRIAN IMPROVEMENTS & RECONSTRUCT CITRUS ST INTERSECTION (NON-CAPACITY ENHANCING).
CMAQ 75 75 75 75RIV061162 Total 75 75 75 75
RIV061162 Riverside SCAB RIV061162 TDM24 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 100 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
AT DOWNTOWN RIVERSIDE METROLINK STATION FOR UCR (CE-CERT): IMPLEMENT UCR INTELLISHARE SYSTEM (INTELLIGENT SHARED-USE VEHICLE SYSTEM) AT 2 DESIGNATED PARKING SPACES
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 6 of 24
INTERSTATE MAINTENANC 475 475 475 475
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
23,553 23,553 23,553 23,553
45600 Total 24,028 24,028 24,028 24,028
PTC 52,269 Agency CALTRANS45600 Riverside SSAB 45600 CAX70 10 41.3 44.6 S NON-EXEMPT 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ON I-10 NEAR RANCHO MIRAGE FROM 3.3 KM WEST TO 2.0 KM EAST OF RAMON RD IC - CONSTRUCT BOB HOPE DR EXTENSION (6 LANES) W/ A NEW DIAMOND IC & MODIFY RAMON RD IC & RAMPS (PPNO: 0007D, EA: 45600)
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
DEMO-SAFETEA-LU 2,200 2,200 2,200 2,200
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
10,415 10,415 10,415 10,415
45580 Total 12,615 12,615 12,615 12,615
45580 Riverside SSAB 45580 CAXT3 10 35.7 36.5 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 35,393 Agency RIVERSIDE COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
NEAR PALM SPRINGS ON I-10 AT GENE AUTRY TR/PALM DR IC FROM I-10 IC SOUTH TO SALVIA ROAD - WIDEN 2 TO 6 THROUGH LANES, I-10 IC IMPROVEMENTS, WIDEN/MODIFY RAMPS FROM 1 TO 2 LNS (SAFETEA LU CA451 #1369) (EA: 45580)
BRIDGE - LOCAL 987 987 987 987RIV050201 Total 987 987 987 987
RIV050201 Riverside SCAB RIV050201 NCR36 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 101,843 Agency VARIOUS AGENCIES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalHBP - LOCAL BRIDGE LUMP SUM PROGRAM FOR 2008/2009 - 2011/2012 (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3).
STP LOCAL 2,958 2,958 2,958 2,958RIV031216 Total 2,958 2,958 2,958 2,958
RIV031216 Riverside SCAB RIV031216 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,370 Agency TEMECULA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN SOUTHWEST RIVERSIDE COUNTY - CITY OF TEMECULA PAVEMENT REHABILITATION - RANCHO CALIFORNIA RD (NON CAPACITY ENHANCING) (CONSISTENT W/ 40 CFR PART 93.126,127,128 EXEMPT TABLES 2 & 3)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 7 of 24
CMAQ 194 194 194 194RIV990709 Total 194 194 194 194
RIV990709 Riverside SCAB RIV990709 NCNH2 74 27.53 27.53 S EXEMPT - 93.128 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 265 Agency PERRIS
IN THE CITY OF PERRIS - INSTALL NEW SIGNAL AT 4TH ST (SR74) AND REDLANDS AVEFund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
STP LOCAL 1,770 1,770 1,770 1,770DEMO - TEA 21 4,500 4,500 4,500 4,500
32300 Total 6,270 6,270 6,270 6,270
32300 Riverside SCAB 32300 CAXT3 60 18.1 18.9 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 25,493 Agency MORENO VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
AT SR60/NASON ST IC - MODIFY/RECONSTRUCT IC & NASON ST FROM ELDER AVE TO FIR AVE: REALIGN EB, WB EXIT RAMPS PLUS EB & WB ENTRY RAMPS, ADD EB & WB ENTRY RAMP HOV LANES, & ADD EB AND WB AUX LANES (EA: 32300)
CMAQ 3,100 3,100 3,100 3,10046360 Total 3,100 3,100 3,100 3,100
46360 Riverside SCAB 46360 CAX62 60 12.2 20.4 S TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 39,285 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN RIVERSIDE AND MORENO VALLEY ON SR60 FROM RT 215 TO REDLANDS BLVD ADD 2 HOV LANES
CMAQ 250 350 600 600 600
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
4,482 4,482 4,482 4,482
RIV990701 Total 250 350 4,482 5,082 5,082 5,082
RIV990701 Riverside SCAB RIV990701 CAXT3 60 6.7 7.5 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 9,635 Agency RIVERSIDE COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
SR60/VALLEY WAY IC - RELOCATE WB OFF-RAMP (1 TO 2 LANES) AND ADD NEW EB ON-RAMP (2 LANES), SIGNALS & WIDEN VALLEY WAY/MISSION BLVD INTERSECTION (EA: 46350)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 8 of 24
NATIONAL HIGHWAY SYSTEM (GARVEE)
26,600 26,600 26,600 26,600
0121D Total 26,600 26,600 26,600 26,600
0121D Riverside SCAB 0121D CAX62 215 37.7 43.9 S TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 382,730 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ON I-215/SR91/SR60, RIV I215 COR IMPROV PROJ - FROM 60/91/215 JCT TO 60/215 SPLIT - WIDEN 6 TO 8 LNS, INCLUDING MAINLINE/IC IMPROVS, ADD HOV, AUX, & SB TRUCK CLIMB LN (EA: 3348U1)
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
9,999 9,999 9,999 9,999
RIV010203 Total 9,999 9,999 9,999 9,999
RIV010203 Riverside SCAB RIV010203 CAXT3 215 12.3 12.8 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 35,668 Agency MURRIETA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
AT I-215/CLINTON KEITH RD IC - CONSTRUCT PARTIAL CLOVERLEAF: WIDEN OC 2 TO 6 THROUGH LANES, RECONSTRUCT RAMPS (WIDENING TO EXISTING NB/SB DIAMOND RAMPS) & CONSTRUCT NEW NB/SB LOOP ENTRY RAMPS (EA: 32780)
DEMO - TEA 21 157 157 157 15745661 Total 157 157 157 157
45661 Riverside SCAB 45661 CAXT3 91 .62 1.24 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 24,668 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
NEAR CORONA ON RTE 91 FROM GREEN RIVER DR IC TO RTE 71/91 SEPARATION - RECONSTRUCT/REPLACE IC INCLUDING OC WIDENING 3 TO 6 LANES AND WB RAMPS WIDENING (PPNO:0076B)
DEMO-SAFETEA-LU 2,040 2,040 2,040 2,040
FFY 2006 APPROPRIATIONS EARMARKS
693 693 693 693
RIV62024 Total 2,733 2,733 2,733 2,733
RIV62024 Riverside SCAB RIV62024 CAX63 79 15.78 33.8 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,400,000 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ON SR79 IN SOUTHWESTERN RIVERSIDE COUNTY BETWEEN 2.0 KILOMETERS SOUTH OF DOMENIGONI PKWY TO GILMAN SPRINGS ROAD: REALIGN AND WIDEN SR79 FROM 2 TO 4 THROUGH LANES
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 9 of 24
FTA 5310 ELD AND DISABI 97 97 97 97RIV061150 Total 97 97 97 97
RIV061150 Riverside SSAB RIV061150 PAN93 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 110 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN COACHELLA VALLEY AREA FOR FOUNDATION FOR THE RETARDED OF THE DESERT - PURCHASE EXPANSION 1 LARGE BUS & 1 MODIFIED VAN (APPROX 16 & 8 PASS., GAS/DIESEL) (FY 06/07 5310 CYCLE)
FTA 5310 ELD AND DISABI 88 88 88 88RIV061149 Total 88 88 88 88
RIV061149 Riverside SCAB RIV061149 PAN93 T TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 100 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR PEPPERMINT RIDGE - PURCHASE 2 EXPANSION MODIFIED VANS (APPROX 8 PASS EACH, GAS/DIESEL) (FY 06/07 5310 CYCLE)
FTA 5310 ELD AND DISABI 49 49 49 49RIV061147 Total 49 49 49 49
RIV061147 Riverside SSAB RIV061147 PAR16 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 56 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN THE COACHELLA VALLEY AREA FOR ANGEL VIEW CRIPPLED CHILDREN'S FOUNDATION - PURCHASE 1 REPLACEMENT MEDIUM BUS (APPROX 12 PASSENGERS, GAS/DIESEL) (FY 06/07 5310 CYCLE)
FTA 5310 ELD AND DISABI 27 27 27 27RIV061146 Total 27 27 27 27
RIV061146 Riverside SCAB RIV061146 PAN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 31 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR PEPPERMINT RIDGE: PURCHASE 2 BASE STATIONS, 13 MOBILE RADIOS, COMPUTER EQUIPMENT, AND SOFTWARE (FY 06/07 5310 CYCLE)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 10 of 24
FTA 5310 ELD AND DISABI 1 1 1 1RIV090115 Total 1 1 1 1
RIV090115 Riverside SSAB REG0702 TRN06 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN THE COACHELLA VALLEY FOR ANGEL VIEW CRIPPLED CHILDREN'S FOUNDATION: PURCHASE COMPUTER HARDWARE FOR GPS SYSTEM (TPC IS $1k - .885 IS FTA-5310 & .115 IS AGENCY SHARE) (FY 08 - 5310).
FTA 5310 ELD AND DISABI 49 49 49 49RIV090114 Total 49 49 49 49
RIV090114 Riverside SCAB REG0702 PAR16 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 55 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN WESTERN RIVERSIDE COUNTY FOR CARE-A-VAN TRANSIT, INC.: PURCHASE ONE REPLACEMENT MINI VAN (GAS/DIESEL) (FY 08 - 5310).
FTA 5310 ELD AND DISABI 84 84 84 84RIV090113 Total 84 84 84 84
RIV090113 Riverside SSAB REG0702 BUR16 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 95 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN COACHELLA VALLEY AREA FOR DESERT ARC: PURCHASE ONE REPLACEMENT LARGE BUS - VII (FY 08 - 5310).
FTA 5310 ELD AND DISABI 112 112 112 112RIV090112 Total 112 112 112 112
RIV090112 Riverside SCAB REG0702 PAN93 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 126 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR MOUNTAIN SHADOWS SUPPORT GROUP - RIVERSIDE: PURCHASE TWO EXPANSION VEHICLES (MED. BUSES - II) (FY 08 - 5310).
FTA 5310 ELD AND DISABI 45 45 45 45RIV090111 Total 45 45 45 45
RIV090111 Riverside SCAB REG0702 PAR16 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 51 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR PEPPERMINT RIDGE: PURCHASE ONE REPLACEMENT MODIFIED VAN (TYPE V - APPROX. 8 PASSENGER, GAS/DIESEL) WITH MOBILE RADIO (FY 08 -5310).
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 11 of 24
FTA 5309(c) BUS 343 343 343 343
RIV031207 Riverside SCAB RIV031207 TRNH6 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 9,000 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY IN THE CITY OF CORONA - CONSTRUCT NEW CORONA TRANSIT CENTER AT 31 EAST GRAND BLVD (5309c FY 03+04+06+08 (E-2006-BUSP-080 & E-2008-BUSP-0688) EARMARKS)).
ARRA - FTA 5307 760 760 760 760RIV090303 Total 760 760 760 760
RIV090303 Riverside SCAB 3CR104 NCR86 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 760 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
SCRRA CENTRAL MAINTENANCE FACILITY AND KELLER STREET YARD MAINTENANCE FACILITY: INSTALLATION OF A GUARD GATE AND MODIFICATION OF AN EXISTING LOCKING DOCK FOR BETTER ACCESS AND ADDITIONAL STORAGE FOR NEW EQUIPMENT (FY 09 - ARRA FTA 5307).
ARRA - FTA 5307 1,670 1,670 1,670 1,670RIV090302 Total 1,670 1,670 1,670 1,670
RIV090302 Riverside SCAB 3CR104 TRR15 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,670 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
SCRRA REHAB & RENOVATION OF METROLINK RAIL: REHABILITATION OF METROLINK TRACK, SIGNAL, COMMUNICATIONS, STRUCTURES AND EQUIPMENT (FY 09 - ARRA FTA 5307).
ARRA - FTA 5307 4,786 4,786 4,786 4,786RIV090301 Total 4,786 4,786 4,786 4,786
RIV090301 Riverside SCAB 3CR104 RAN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4,786 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
METROLINK POSITIVE TRAIN CONTROL (PTC): SYSTEM WIDE IMPLEMENTATION OF PTC - JOINT PROJECT FUNDED BY LACMT, OCTA, SANBAG, AND VCTC (RCTC PROGRAMMING ONLY ITS SHARE OF THE PROJECT COST) (FY 09 - ARRA FTA 5307).
FTA 5310 ELD AND DISABI 84 84 84 84RIV090116 Total 84 84 84 84
RIV090116 Riverside SCAB REG0702 BUR16 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 95 Agency RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR CARE CONNEXXUS, INC: PURCHASE ONE REPLACEMENT LARGE BUS (APPROX. 16 PASSENGERS, GAS/DIESEL) W/LIFT AND TIEDOWNS (FY 08 - 5310).
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 12 of 24
FTA 5307 UZA FORMULAR 138 138 138 138RIV061118 Total 138 138 138 138
RIV061118 Riverside SCAB RIV061118 TRN08 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 173 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE 13 GFI ODYSSEY FAREBOXES (8 FOR LAIDLAW CONTRACTED & 5 FOR RTA) (FY 07 5307) (UZA: RIV-SAN)
FTA 5307 UZA FORMULAR 174 174 174 174RIV061117 Total 174 174 174 174
RIV061117 Riverside SCAB RIV061117 ADR55 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 218 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
AT EXISTING RTA RIVERSIDE & HEMET FACILITIES: YARD & SHOP FACILITY REPAIRS (E.G. CONCRETE REPLACEMENT, PARKING LOT REPAIRS, ASPHALT REPAIRS, ETC.) (FY 07 5307) (UZA: RIV-SAN)
FTA 5307 UZA FORMULAR 50 50 50 50RIV061116 Total 50 50 50 50
RIV061116 Riverside SCAB RIV061116 TRR07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 63 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
AT RTA EXISTING RIVERSIDE MAINT. FACILITY: MAINTENANCE SUPPORT UPGRADES (E.G. EXHAUST SYSTEM MODIFICATION, METHANE DETECTION SYSTEM UPGRADE, ETC.) (FY 07 5307) (UZA: RIV-SAN)
FTA 5309(c) BUS 109 109 109 109RIV050553 Total 109 109 109 109
RIV050553 Riverside SCAB RIV050553 TRNH6 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 8,000 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN TEMECULA - CONSTRUCT NEW TEMECULA TRANSIT CENTER AT 27199 JEFFERSON AVE. (SW OF JEFFERSON AVE & SE OF CHERRY ST) (04, 05, 06, 07, E-2006-091, E-2007-0131, & 2008-BUSP-0131, SAFETEA-LU).
FTA 5309(c) BUS 1,806 1,806 1,806 1,806FTA 5307 UZA FORMULAR 216 216 216 216
RIV041029 Total 2,022 2,022 2,022 2,022
RIV041029 Riverside SCAB RIV041029 TRNH6 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 7,510 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN RIVERSIDE - CONSTRUCT NEW RIVERSIDE TRANSIT CENTER AT 4141 VINE ST., IN THE VICINITY OF DOWNTOWN METROLINK STATION (5309c FY 03+04+06+08, E-2006-BUSP-156 & E-2008-BUSP-0688 EARMARKS) (FY 09 5309) (UZA: RIV-SAN) (TE)
RIV031207 Total 343 343 343 343
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 13 of 24
FTA 5307 UZA FORMULAR 7,736 7,736 7,736 7,736RIV071202 Total 7,736 7,736 7,736 7,736
RIV071202 Riverside SCAB REG0702 BUR05 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 9,670 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN WESTERN RIVERSIDE COUNTY FOR RTA CAPITALIZED PREVENTATIVE MAINTENANCE (FY 09 5307)
FTA 5311 NON-UZA 466 466 466 466FTA 5307 UZA FORMULAR 8,590 8,590 8,590 8,590
RIV071201 Total 9,056 9,056 9,056 9,056
PTC 45,677 Agency RIVERSIDE TRANSIT AGENCYRIV071201 Riverside SCAB REG0702 BUO00 T EXEMPT - 93.126 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR RTA IN FY 08/09 - OPERATING ASSISTANCE : FIXED ROUTE & DIAL-A-RIDE (FY 09 5307 + $377 transfer FROM FY 09 5307 - RIV071202 + $68 from FY 06 5307 LA/LB/STA ANA UZA).
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
FTA 5307 UZA FORMULAR 182 182 182 182RIV061133 Total 182 182 182 182
RIV061133 Riverside SCAB RIV061133 BUO01 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 227 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITALIZED COST OF TIRE LEASE (FY 08 5307) (UZA: RIV-SAN)
FTA 5307 UZA FORMULAR 315 315 315 315RIV061131 Total 315 315 315 315
RIV061131 Riverside SCAB RIV061131 NCR10 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 769 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
BUS STOP AMENITIES: PURCHASE BENCHES, POLES/EXTENSIONS, SIGNS, TRASH RECEPTACLES, ETC. TO REHAB & EXPAND EXISTING STOPS/SHELTERS (FY 08 5307) (UZA: RIV-SAN) (TE)
FTA 5307 UZA FORMULAR 168 168 168 168RIV061120 Total 168 168 168 168
RIV061120 Riverside SCAB RIV061120 TRR06 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 210 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PURCHASE ADP HARD/SOFTWARE (E.G. NEW & REPLACE. SERVERS, TEL RECORDING/TRANS TRAK SYS FOR DAILY OPS, UPGRADE TIME KEEPING SYSTEM & GIS ANNUAL UPDATE) (FY 07 5307) (UZA: RIV- SAN)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 14 of 24
FTA 5307 UZA FORMULAR 400 400 400 400RIV071207 Total 400 400 400 400
RIV071207 Riverside SCAB REG0702 TRR07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 500 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
CAPITAL MAINTENANCE SPARES: PURCHASE ROLLING STOCK CAPITAL PARTS (E.G., ALTERNATOR, MANIFOLDS, PUMPS, CONTROLLER, TRANSMISSIONS, COMPRESSOR, ETC.) (FY 09 5307)
FTA 5307 UZA FORMULAR 43 43 43 43RIV071206 Total 43 43 43 43
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR RTA - PURCHASE REPLACEMENT SUPPORT VEHICLES: 1 RELIEF SUPPORT VEHICLE, AND 1 VEHICLE FOR STOPS AND ZONE OPERATIONS (FY 09 5307)
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
RIV071206 Riverside SCAB REG0702 VER02 T EXEMPT - 93.126 0PTC 54 Agency RIVERSIDE TRANSIT AGENCY
FTA 5307 UZA FORMULAR 40 40 40 40RIV071205 Total 40 40 40 40
RIV071205 Riverside SCAB REG0702 TRR07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 50 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalEZ RIDER RETROFIT: PURCHASE AND INSTALL EXHAUST TREATMENT DEVICES ON 3 BUSES (EL DORADO EZ RIDER DIESEL BUSES) (FY 09 5307)
FTA 5307 UZA FORMULAR 2,327 2,327 2,327 2,327RIV071204 Total 2,327 2,327 2,327 2,327
RIV071204 Riverside SCAB REG0702 PAR16 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,909 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN WESTERN RIVERSIDE COUNTY - PURCHASE 8 REPLACEMENT TYPE VII BUSES (25-27 PASSENGERS) (FY 09 5307)
FTA 5307 UZA FORMULAR 1,092 1,092 1,092 1,092RIV071203 Total 1,092 1,092 1,092 1,092
RIV071203 Riverside SCAB REG0702 PAR16 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,316 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPURCHASE 20 REPLACEMENT TYPE VII VEHICLES (GAS/DIESEL, APPROX. 12 PASSENGER) WITH LIFTS AND ACCESSORIES (FY 09 5307).
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 15 of 24
FTA 5307 UZA FORMULAR 120 120 120 120RIV071214 Total 120 120 120 120
RIV071214 Riverside SCAB 3TL1207 TRR06 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 150 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
AT RTA EXISTING RIVERSIDE FACILITY: RELOCATE COIN ROOM TO BE ADJACENT TO MAINTENANCE BUS GARAGE FOR INCREASED SECURITY AND OPERATIONAL EFFICIENCY (FY 09 5307)
FTA 5307 UZA FORMULAR 200 200 200 200RIV071213 Total 200 200 200 200
RIV071213 Riverside SCAB REG0702 BUN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 250 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalAT RTA EXISTING RIVERSIDE FACILITY: RELOCATE EXISTING BUS WASH TO AREA ADJACENT TO MAINTENANCE BUS GARAGE (FY 09 5307)
FTA 5307 UZA FORMULAR 24 24 24 24RIV071212 Total 24 24 24 24
RIV071212 Riverside SCAB REG0702 SEC54 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 30 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalAT RTA EXISTING HEMET AND RIVERSIDE FACILITIES: CONSTRUCT A SECURITY GUARD HOUSE AT EACH FACILITY (FY 09 5307)
FTA 5307 UZA FORMULAR 3 3 3 3RIV071210 Total 3 3 3 3
RIV071210 Riverside SCAB REG0702 BUN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PURCHASE NEW SHOP TOOLS AND EQUIPMENT: (E.G., BRAKE LATHE UPGRADE , PRESSURE WASHER, CHASSIS WASHER, LAP TOP COMPUTERS AND SOFTWARE, TWO BRAKE DRUM DOLLY'S TRANSMISSION JACK, BUS LIFT REPLACEMENT, ETC.) (FY 09 5307)
FTA 5307 UZA FORMULAR 32 32 32 32RIV071208 Total 32 32 32 32
RIV071208 Riverside SCAB REG0702 TRN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 40 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
BUS STOP MAINT EQUIP: PURCHASE VARIOUS EQUIP (E.G., PRESSURE WASHER, VACUUM BROOM, RAKES, SHOVELS, AIRLESS PAINT SRAYER, ETC.) FOR EXISTING BUS STOPS (FY 09 5307)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 16 of 24
FTA 5307 UZA FORMULAR 1,626 1,626 1,626 1,626RIV071219 Total 1,626 1,626 1,626 1,626
RIV071219 Riverside SCAB REG0702 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,032 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR RTA - DEBT FINANCING (FY 08/09 PORTION) FOR 55 CNG REPLACEMENT 40-FT BUSES PURCHASED IN 2001 THROUGH THE CTFC (FY 09 5307).
FTA 5307 UZA FORMULAR 560 560 560 560RIV071218 Total 560 560 560 560
PTC 1,050 Agency RIVERSIDE TRANSIT AGENCYRIV071218 Riverside SCAB REG0702 TRN06 T EXEMPT - 93.126 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PURCHASE SCHEDULING AND RUNCUTTING SOFTWARE FOR IMPROVED OPERATIONS COST/BENEFIT ANALYSIS OF TRIP TIMES, REVENUE HOURS, HEADWAYS, OPERATOR PAY SHEETS, ETC. (FY 07 5307 & FY 09 5307 ).
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
FTA 5307 UZA FORMULAR 254 254 254 254RIV071217 Total 254 254 254 254
RIV071217 Riverside SCAB REG0702 TRN06 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 317 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PURCHASE REPLACEMENT IT OFFICE EQUIPMENT (E.G., PRINTERS, SERVERS, TELEPHONE SYSTEM, INCLUDING REPLACEMENT OF PBX SYSTEM WITH VOIP SYSTEM) (FY 09 5307)
FTA 5307 UZA FORMULAR 4 4 4 4RIV071216 Total 4 4 4 4
RIV071216 Riverside SCAB REG0702 TRN06 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 5 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPURCHASE GEOGRAPHIC INFORMATION SYSTEMS (GIS) MAPPING SYSTEM FOR ENHANCED MAPPING AND PLANNING CAPABILITIES (FY 09 5307)
FTA 5307 UZA FORMULAR 316 316 316 316RIV071215 Total 316 316 316 316
RIV071215 Riverside SCAB 3TC0702 NCR86 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 395 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalFACILITY IMPROVEMENTS AT EXISTING RTA HEMET FACILITY: REHAB AND REPLACE ASPHALT (FY 09 5307)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 17 of 24
FTA 5307 UZA FORMULAR 344 344 344 344RIV080927 Total 344 344 344 344
RIV080927 Riverside SCAB RIV080927 ADR55 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 430 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
AT RTA EXISTING HEMET AND RIVERSIDE FACILITIES: MAINTENANCE FACILITY UPGRADES (UNLEADED FUEL DISPENSERS, FIRE DOOR, ENERGY EFFICIENT LIGHTING, ROOF REPAIRS, EASEMENT RESTORATION (RIVERSIDE YARD PROPERTY), AND RE-KEY AND INSTALL FUEL FORCE SYSTEM TO STANDARIZE AND UPDATE MAINTENANCE AND SECURITY PROCEDURES)) (FY 09 5307).
FTA 5316 JOB ACCESS PROGRAM
20 20 20 20
RIV071287 Total 20 20 20 20
RIV071287 Riverside SCAB RIV071287 ADM83 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 75 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITALIZED COST OF MOBILITY MANAGEMENT FOR THE HEMET OPPORTUNITY PROJECT EXPRESS (HOPE) BUS (SEC 5316 - 2006 FUNDS).
FTA 5316 JOB ACCESS PROGRAM
140 140 140 140
RIV071286 Total 140 140 140 140
RIV071286 Riverside SCAB RIV071286 PAO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 883 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR RTA - OPERATING ASSISTANCE FOR THE HEMET OPPORTUNITY PROJECT EXPRESS (HOPE) BUS TO PROVIDE SPECIALIZED TRANSPORTATION SERVICES TO DPSS CLIENTS IN THE HEMET AREA (SEC 5316 - 2006 FUDNS).
FTA 5317 NEW FREEDOM PROGRAM
254 254 254 254
FTA 5316 JOB ACCESS PROGRAM
605 605 605 605
RIV071284 Total 859 859 859 859
RIV071284 Riverside SCAB RIV071284 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,437 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR RTA - OPERATING ASSISTANCE: FIXED ROUTE SERVICE FOR SAN JACINTO-HEMET-PERRIS-RIVERSIDE, AND SAN JACINTO-HEMET-MURRIETA-TEMECULA-ESCONDIDO (FY 06 5316 AND 5317) (UZAs: HEM/SAN JAC + TEM/MURR).
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 18 of 24
FTA 5307 UZA FORMULAR 598 598 598 598RIV050522 Total 598 598 598 598
RIV050522 Riverside SCAB RIV050522 PAR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 720 Agency RIVERSIDE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PURCHASE 8 REPLACEMENT ALT-FUEL (CNG) (APPROX 12 PASS) DIAL-A-RIDE PARATRANSIT VEHICLES W/ LIFTS, TIEDOWNS, FAREBOXES, RADIOS, CAMERAS, & ACCESSORIES (FY 07 5307) (UZA: RIV-SAN)
FTA 5307 UZA FORMULAR 80 80 80 80RIV050521 Total 80 80 80 80
RIV050521 Riverside SCAB RIV050521 BUR04 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 100 Agency RIVERSIDE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 07 5307) (UZA: RIV-SAN)
FTA 5309(c) BUS 109 109 109 109RIV090609 Total 109 109 109 109
RIV090609 Riverside SCAB 3TL807 ITS01 T TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 612 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR RTA: INSTALL ADVANCE TRAVELER INFORMATION SYSTEMS (ATIS) ON VARIOUS FIXED ROUTE VEHICLES AND INSTALLATION OF ELECTRONIC MESSAGE SIGNS AT APPROX. 60 BUS STOPS (FY 's 05, 07, 08, 09, and 10 - 5309).
FTA 5317 NEW FREEDOM PROGRAM
18 18 18 18
FTA 5316 JOB ACCESS PROGRAM
41 41 41 41
RIV090105 Total 59 59 59 59
RIV090105 Riverside SCAB REG0702 TDM24 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,764 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR RTA - JOB ACCESS & REVERSE COMMUTE PROGRAM & NEW FREEDOM PROJECTS LUMP SUM FOR NON-PROFIT ORGANIZATIONS (CONSISTENT W/40 CFR PART 93 EXEMPT TABLES 2 AND 3) (FY 07 & 08 5316 & 5317).
FTA 5307 UZA FORMULAR 303 303 303 303RIV080928 Total 303 303 303 303
RIV080928 Riverside SCAB RIV080928 ADM83 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 379 Agency RIVERSIDE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN WESTERN RIVERSIDE COUNTY FOR RTA: UPGRADE AND REPLACE ORACLE SERVERS AND IMPLEMENT A DATA CENTER SERVER VIRTUALIZATION SYSTEM IN RIVERSIDE CONNECTED WITH A LIVE REPLICATED DISASTER RECOVERY SITE IN HEMET (FY 09 5307).
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 19 of 24
FTA 5307 UZA FORMULAR 415 415 415 415RIV061107 Total 415 415 415 415
RIV061107 Riverside SCAB RIV061107 PAR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 500 Agency RIVERSIDE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PURCHASE 5 REPLACEMENT ALT-FUEL (CNG) (APPROX 12 PASS) DIAL-A-RIDE PARATRANSIT VEHICLES W/ LIFTS, TIEDOWNS, FAREBOXES, RADIOS, CAMERAS, & ACCESSORIES (FY 08 5307) (UZA: RIV-SAN)
FTA 5307 UZA FORMULAR 80 80 80 80RIV061106 Total 80 80 80 80
RIV061106 Riverside SCAB RIV061106 BUR05 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 100 Agency RIVERSIDE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 08 5307) (UZA: RIV-SAN)
FTA 5307 UZA FORMULAR 120 120 120 120RIV061105 Total 120 120 120 120
RIV061105 Riverside SCAB RIV061105 PAN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 260 Agency RIVERSIDE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FOR RIV SS - PURCHASE/INSTALL VEHICLE LOCATOR EQUIPMENT FOR PROVIDING A 25 VEHICLE FLEET MOBIL DATA & GPS INFO FOR INCREASED PASSENGER/DRIVER SECURITY (FY 07 5307) (UZA: RIV-SAN)
FTA 5307 UZA FORMULAR 800 800 800 800RIV050524 Total 800 800 800 800
RIV050524 Riverside SCAB RIV050524 NCR86 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,000 Agency RIVERSIDE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FOR RIV SS - CONSTRUCT EXPANDED SERVICE BAY FOR VEHICLE MAINTENANCE AT EXISTING RIVERSIDE MAINT. FACILITY OPS AREA SUPPORTING EXISTING VEHICLE FLEET (FY 07 5307) (UZA: RIV-SAN)
FTA 5307 UZA FORMULAR 40 40 40 40RIV050523 Total 40 40 40 40
RIV050523 Riverside SCAB RIV050523 TRR06 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 50 Agency RIVERSIDE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FOR RIV SS - PURCHASE REPLACEMENT OFFICE & MISC. EQUIPMENT (E.G. DESKS, CHAIRS, PHONES, RADIO EQUIP, FILE CABINETS, ETC.) FOR EXISTING ADMIN FACILITY (FY 07 5307) (UZA: RIV-SAN)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 20 of 24
FTA 5311 NON-UZA 283 283 283 283RIV061154 Total 283 283 283 283
RIV061154 Riverside SSAB RIV061154 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 18,308 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN THE COACHELLA VALLEY FOR SUNLINE - FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEAR 2007/08
FTA 5307 UZA FORMULAR 824 824 824 824RIV080926 Total 824 824 824 824
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FOR RIVERSIDE SPECIAL SERVICES - CONSTRUCT FLEET BAY FOR PARARANSIT VEHICLES, PER APPROVED 2008/2009 SRTP, TABLE 4 - CAPITAL PROJECT NO. FY 09-3 (FY 09 5307) (UZA: RIV-SAN)
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
RIV080926 Riverside SCAB RIV080926 NCN86 T EXEMPT - 93.126 0PTC 1,030 Agency RIVERSIDE, CITY OF
FTA 5307 UZA FORMULAR 24 24 24 24RIV080925 Total 24 24 24 24
RIV080925 Riverside SCAB RIV080925 TRN09 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 30 Agency RIVERSIDE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FOR RIVERSIDE SPECIAL SERVICES - PURCHASE COMMUNICATION EQUIPMENT FOR DRIVERS AND DISPATCHERS, PER APROVED 2008/2009 SRTP - TABLE 4, PROJECT NO. FY 09-2 (FY 09 5307) (UZA: RIV-SAN)
FTA 5307 UZA FORMULAR 16 16 16 16RIV080922 Total 16 16 16 16
RIV080922 Riverside SCAB RIV080922 TRR06 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 20 Agency RIVERSIDE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FOR RIVERSIDE SPECIAL SERVICES - PURCHASE REPLACEMENT OFFICE AND MISCELLANEOUS EQUIPMENT (E.G., FILING CABINETS, CHAIRS, DESKS, PHONES, & RADIO EQUIPMENT), FOR EXISTING ADMINISTRATIVE FACILITY, PER APPROVED 2008/2009 SRTP - TABLE 4, PROJECT NO. FY 09-1 (FY 09 5307) (UZA: RIV-SAN).
FTA 5307 UZA FORMULAR 80 80 80 80RIV070704 Total 80 80 80 80
RIV070704 Riverside SCAB 30M0701 BUR04 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 100 Agency RIVERSIDE, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 09 5307)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 21 of 24
FTA 5307 UZA FORMULAR 330 330 330 330RIV071228 Total 330 330 330 330
RIV071228 Riverside SSAB 3TL104 PAN94 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 412 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE 4 EXPANSION PARATRANSIT DAR BUSES (CNG, 30 FT., APPROX. 12 PASSENGER), WITH LIFTS, RADIOS, FARE BOXES, AND ACCESSORIES (PER SUNLINE'S REV. 2008/2009 SRTP T-4 - SL09-08).
FTA 5309(c) BUS 391 391 391 391RIV070712 Total 391 391 391 391
RIV070712 Riverside SSAB 3RL04 BUR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 489 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
JOINT PARTNERSHIP W/ CALSTART/WESTSTART FOR FUEL CELL BUS RESEARCH & DEMONSTRATION PROJECT TO DEVELOP & OPERATE A ZERO EMISSION BUS (E-2006-BUSP-149 + E-2007-BUSP-0102)
FTA 5309(c) BUS 100 100 100 100FTA 5307 UZA FORMULAR 1,326 1,326 1,326 1,326
RIV070708 Total 1,426 1,426 1,426 1,426
RIV070708 Riverside SSAB 3TL504 BUR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 5,226 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN COACHELLA VALLEY - PURCHASE 16 REPLACEMENT BUSES (ALT-FUEL 30-40 FT, 30-43 PASSENGER) W/ LIFTS, RACKS, FARE BOXES, RADIOS & ACCESSORIES (FY 08 5307) (UZA: INCCPS) (E-BUSP-0101)
FTA 5307 UZA FORMULAR 448 448 448 448RIV061157 Total 448 448 448 448
RIV061157 Riverside SSAB RIV061157 NCR10 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 799 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PURCHASE TRANSIT ENHANCE. BUS STOP AMENITIES (E.G. BENCHES, TRASH CONTAINERS, KIOSK LEXANS & SCHEDULES, SHELTERS, SUPPLIES, ETC.) FOR VARIOUS STOPS (FY 08 5307) (UZA: INDCCPS) (TE)
FTA 5307 UZA FORMULAR 1,051 1,051 1,051 1,051RIV061155 Total 1,051 1,051 1,051 1,051
RIV061155 Riverside SSAB RIV061155 BUR05 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,582 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN THE COACHELLA VALLEY AREA FOR SUNLINE - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 08 5307) (UZA: INCCPS)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 22 of 24
FTA 5316 JOB ACCESS PROGRAM
163 163 163 163
RIV071283 Riverside SSAB 3TL104 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 477 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN THE COACHELLA VALLEY FOR SUNLINE - OPERATING ASSISTANCE TO PROVIDE COMMUNITY BASED FLEX ROUTE IN THE CITY OF DESERT HOT SPRINGS (FY 06 5316 AND 5317) .
CMAQ 664 664 664 664RIV071266 Total 664 664 664 664
RIV071266 Riverside SSAB 3TC04TR3 TRNH6 T NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,344 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN COACHELLA VALLEY - TRANSFER HUB/LOCATION AT SUNLINE'S HEAD OFFICE IN THOUSAND PALMS: DEVELOP AND CONSTRUCT A TRANSIT HUB AND PARK AND RIDE FACILITY AT SUNLINE'S HEAD OFFICE IN THOUSAND PALMS (FTA 5309C - E-2009-BUSP-171; 2009 HR 1105, PUBLIC LAW 111-8).
CMAQ 310 310 310 310RIV071263 Total 310 310 310 310
RIV071263 Riverside SSAB 30M0701 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 350 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN COACHELLA VALLEY - FRED WARING CORRIDOR EXPRESS SERVICE DEMONSTRATION PROJECT: PROVIDE LIMITED EXPRESS SERVICE FROM THE INDIO TRANSFER LOCATION TO THE TRANSFER LOCATION ON TOWN CENTER WAY WITH SERVICE TO COLLEGE OF THE DESERT AND LIMITED STOPS ALONG THE CORRIDOR.
ARRA - FTA 5307 3,250 3,250 3,250 3,250RIV071232 Total 3,250 3,250 3,250 3,250
RIV071232 Riverside SSAB 3TL0407 ADR55 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,250 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN COACHELLA VALLEY AT EXISTING SUNLINE FACILITIES/MAINTENACE BUILDING: MAINTENANCE BUILDING CAPABILITY EXPANSION AND REHABILITATION/ENHANCEMENTS OF THE EXISTING MAINTENANCE BUILDING. (FY 09 - ARRA 5307).
ARRA - FTA 5307 500 500 500 500FTA 5307 UZA FORMULAR 600 600 600 600
RIV071229 Total 1,100 1,100 1,100 1,100
RIV071229 Riverside SSAB 3TL607 NCR10 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,250 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PURCHASE TRANSIT ENHANCEMENT BUS STOP AMENITIES (E.G., BENCHES, TRASH CONTAINERS, KIOSK LEXANS & SCHEDULES, SHELTERS, SUPPLIES, ETC.) FOR VARIOUS STOPS (FY 09 5307 + FY 09 - ARRA-FTA 5307) (UZA: INDCCPS) (TE)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 23 of 24
FTA 5309(c) BUS 109 109 109 109RIV090407 Total 109 109 109 109
RIV090407 Riverside SSAB REG0702 BUR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
IN COACHELLA VALLEY FOR SUNLINE TRANSIT: PURCHASE 1-CNG 40 FT. (43 PASSENGER) BUS - FIXED ROUTE, W/LIFT, BIKE RACK, FARE BOX, RADIO, & ACCESSORIES, PER REVISED 2008/2009 SRTP TABLE 4 - SL-09-07 (FY 09 - 5309).Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PTC 450 Agency SUNLINE TRANSIT AGENCY
FTA 5317 NEW FREEDOM PROGRAM
76 76 76 76
FTA 5316 JOB ACCESS PROGRAM
163 163 163 163FTA 5311 NON-UZA 289 289 289 289CMAQ 310 310 310 310
RIV080923 Total 838 838 838 838
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEAR 2008/2009 (PER REVISED 2008/2009 SRTP - TABLE 4).Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
RIV080923 Riverside SSAB RIV080923 BUO00 T EXEMPT - 93.126 0PTC 21,536 Agency SUNLINE TRANSIT AGENCY
ARRA - FTA 5311 453 453 453 453ARRA - FTA 5307 964 964 964 964
RIV080921 Total 1,417 1,417 1,417 1,417
RIV080921 Riverside SSAB RIV080921 ITS01 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,417 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE VARIOUS ITS EQUIPMENT, SOFTWARE AND HARDWARE FOR EXISTING AND EXPANSION SERVICE, AS WELL AS FOR PLANNING RELATED ACTIVITIES ON BUS STOP IMPROVEMENT PROJECTS. ITS EQUIPMENT TO BE PURCHASED INCLUDES: AUTOMATED VEHICLE LOCATORS (AVL), GEOGRAPHIC POSITIONING SYSTEM (GPS), AND MOBILE DATA TERMINALS (MDT) (FY 09 - ARRA 5307).
FTA 5309(c) BUS 217 217 217 217RIV080919 Total 217 217 217 217
RIV080919 Riverside SSAB RIV080919 BUR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 271 Agency SUNLINE TRANSIT AGENCY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
JOINT PARTNERSHIP W/CALSTAR/WESTSTART FOR FUEL CELL BUS RESEARCH & DEMONSTRATION PROJECT TO DEVELOP AND OPERATE A ZERO EMISSION BUS (E-2008-BUSP-0102).
FTA 5317 NEW FREEDOM PROGRAM
76 76 76 76
RIV071283 Total 239 239 239 239
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:08 AM Page: 24 of 24
FTA 5307 UZA FORMULAR 412 412 412 412RIV090912 Total 412 412 412 412
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN COACHELLA VALLEY AREA - PURCHASE FIVE (5) REPLACEMENT ALT FUEL PARATRANSIT VEHICLES (2008/2009 SRTP - TABLE 4 - SL 09-13, Updated 9/16/2009) (FTA 5307 - FY 09).
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
RIV090912 Riverside SSAB 3TL507 PAR17 T EXEMPT 0PTC 515 Agency SUNLINE TRANSIT AGENCY
Grand Total 6,535 5,900 166,213 178,648 178,648 178,648
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Riverside County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 1 of 17
DEMO - TEA 21 500 500 500 500SBD55034 Total 500 500 500 500
SBD55034 San Bernardino SCAB SBD55034 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 14,130 Agency MONTCLAIR
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
MISSION BLVD. FROM LA COUNTY LINE TO BENSON AVE (2.2 MILES) RECONSTRUCT RDWAY, LANDSCAPE MEDIAN ISLANDS, STORM DRAINS, UPGRADED SIGNALS (NO ADDTL LANES) (T21-#60)
BRIDGE - LOCAL 258 258 258 25820061015 Total 258 258 258 258
GREENSPOT ROAD BRIDGE AT SANTA ANA RIVER - GREENSPOT RD.CONSTRUCT NEW 4 LANE BRIDGE (STRIPING FOR 2 LANES) AT SAR W/ CHANNEL IMPROVMENTS-REALIGN APPROX 2400' OF 2 LANE RD.Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
20061015 San Bernardino SCAB 200212 L NON-EXEMPT 0PTC 13,100 Agency HIGHLAND
SECTION 115 607 607 607 607
PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE
1,000 1,000 1,000 1,000
200018 Total 1,607 1,607 1,607 1,607
200018 San Bernardino SCAB 200018 CAR63 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 21,773 Agency HIGHLAND
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
BOULDER AV ACROSS CITY CREEK S/O BASELINE - RECONSTRUCT EXISTING BRIDGE FROM 2 TO 4 LANES; ALSO WIDEN BOULDER AVE FROM 300' NORTH TO 1,430' SOUTH OF BRIDGE FROM 2-4 LANES
RECREATIONAL TRAILS 250 250 250 250200431 Total 250 250 250 250
200431 San Bernardino SCAB 200431 NCN26 L TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,054 Agency FONTANA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalINLAND PACIFIC ELECTRIC TRAIL - ON OLD SP ABANDONED RR BETWEEN I-15 TO MAPLE AVE.-CONSTRUCT CLASS 1 BIKE LANE (APPROX. 7 MILES LONG)
RECREATIONAL TRAILS 284 284 284 28420080201 Total 284 284 284 284
20080201 San Bernardino MDAB REG0704 LUM06 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 625 Agency CALIF DEPARTMENT OF PARKS & RECREATION
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
2008 MOTORIZED RECREATIONAL TRAILS PROJECTS FOR RTIP - OFF ROAD RECREATION VEHICLE PROGRAM (BARSTOW OHV ROUTE SIGNING AND CLEAN-UP AND BLM SIGNING AND CLEAN-UP AND OHV EDUCATION AND SAFETY PROGRAM
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 2 of 17
CMAQ 4,025 4,025 4,025 4,02520040827 Total 4,025 4,025 4,025 4,025
20040827 San Bernardino SCAB 4RL04 TDM20 L TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 7,512 Agency SANBAG
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRIDESHARE PROGRAM FOR SOUTHCOAST AIR DISTRIST
STP LOCAL 2,479 2,479 2,479 2,479SBD031426 Total 2,479 2,479 2,479 2,479
SBD031426 San Bernardino MDAB SBD031426 NCRH4 L EXEMPT - 93.127 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 80,000 Agency SAN BERNARDINO COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
NEEDLES HIGHWAY FROM 'N' STREET TO NEVADA STATE LINE-REALIGN, REHABILITATE, WIDEN SHOULDERS, TURN LANES, PASSING LANES, AND ACCELERATION LANES (1 LANE IN EACH DIR.) RELOCATE UTIL.
PUBLIC LAND HWYS 2,152 2,152 2,152 2,15220040210 Total 2,152 2,152 2,152 2,152
20040210 San Bernardino MDAB 20040210 NCR91 L EXEMPT - 93.127 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 21,000 Agency SAN BERNARDINO COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
SUMMIT VALLEY ROAD - FROM SH138 TO HESPERIA CITY LIMITS (RANCHERO ROAD-PSE ONLY - FOR REALIGNMENT OF SUMMIT VALLEY RD, 2 LANES IN EACH DIRECTION
DEMO-SAFETEA-LU 400 400 400 400200603 Total 400 400 400 400
200603 San Bernardino SCAB 200603 CAR60 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 11,132 Agency RIALTO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRIVERSIDE AVE. SOUTH OF I-10 BETWEEN I-10 AND SLOVER AVE - RAILROAD BRIDGE MODIFICATION FROM 4-8 LANES
FHWA CORRIDORS AND BORDERS PROGRAM
2,913 2,913 2,913 2,913
20040804 Total 2,913 2,913 2,913 2,913
20040804 San Bernardino MDAB 4A0801 CAR62 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 24,817 Agency NEEDLES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
I-40/AZ95 CONNECTOR- J ST. FROM I-40 OFFRAMPS TO W. BROADWY;NEEDLES HGWY FROM W. BROADWY TO N.K ST; N.K ST FROM NEEDLES TO AZ 95-WIDEN 2-4 LNS-INTERSCTN& CORRIDOR IMPRVT.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 3 of 17
CMAQ 159 159 159 15920041201 Total 159 159 159 159
20041201 San Bernardino MDAB 20041201 NCNH2 L EXEMPT - 93.128 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 203 Agency VICTORVILLE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ON BEAR VALLEY ROAD AND FISH HATCHERY ROAD - SIGNAL - WILL BE TYING INTO OTHER SIGNALS ON BEAR VALLEY (PART OF VICTOR VALLEY COLLEGE PARK AND RIDE PROJECT) 200111
BRIDGE - LOCAL 797 797 797 797SBDLS08 Total 797 797 797 797
HBRR LOCAL BRIDGE LUMP SUM FOR 2006 - (PROJETS ARE CONSISTENT WITH 40 CFR PART 93.126.127.128, EXEMPT TABLES 2 & 3)Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
SBDLS08 San Bernardino SCAB SBDLS08 CAR60 L EXEMPT - 93.126 0PTC 56,321 Agency VARIOUS AGENCIES
STP ENHANCE-RIP TEA 700 700 700 70020081104 Total 700 700 700 700
20081104 San Bernardino SCAB REG0702 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 700 Agency SANBAG
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LUMP SUM -TEA PROJECTS IN SAN BERNARDINO COUNTY - ALL PROJECTS FALL UNDER THE 23 CFR 450.324 (F) AND ARE UNDER THE EXEMPT PROJECT LISTING 40 CFR PART 93 (EXCLUDING THE PROJECTS FROM AIR QUALITY CONFORMITY ANALYSIS)
CMAQ 4,025 4,025 4,025 4,02520061707 Total 4,025 4,025 4,025 4,025
20061707 San Bernardino SCAB 4RL04 TDM20 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4,486 Agency SANBAG
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRIDESHARE ACTIVITIES FOR SOUTHCOAST AIR BASIN
STP ENHANCE-RIP TEA 3,433 3,433 3,433 3,43320040830 Total 3,433 3,433 3,433 3,433
20040830 San Bernardino SCAB 20040830 NCN25 L EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 10,894 Agency SANBAG
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSTIP TEA LUMP SUMS FOR BIKE/PED.;LANDSCAPE TYPE PROJECT
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 4 of 17
INTERSTATE MAINT. HR4818 2,253 2,253 2,253 2,253
BRIDGE DISCRETIONARY - REPLACEMENT/REHABILITATION
428 428 428 428
200048 Total 2,681 2,681 2,681 2,681
200048 San Bernardino SCAB 200048 CARH3 15 6.3 7.1 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 43,100 Agency RANCHO CUCAMONGA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
I-15 AT BASELINE INTERCHANGE - FROM 1,800 N/O BASELINE TO 2,400' S/O; 1800; 1800 w/o to 1500' EAST tWIDEN RAMPS (INCLUDING BRIDGES), WIDEN BASELINE RD. FROM 4-6 LANES, WIDEN EAST AVE. FROM 2-4 LANES, REALIGN AND WIDEN S/B AND N/B DIAMOND RAMPS FROM 1-2 LNS (INCLUDING BRIDGES, AD S.B LOOP ON-RAMP (INCL BRIDGES) ADD I-15 ACCEL/DECEL LANES, AND OPERATIONAL IMPROVEMENTS (EA497100)
DEMO - TEA 21 5,250 5,250 5,250 5,25044810 Total 5,250 5,250 5,250 5,250
44810 San Bernardino SCAB 44810 CARH3 10 25.3 27.3 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 85,000 Agency SANBAG
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
I-10 TIPPECANOE RECONFIGURE INTERCHANGE& ADD EASTBOUND OFF-RAMP AUXILIARY LN FROM WATERMAN ON-RAMP TO TIPPECANOE OFF-RAMP , WIDEN BRIDGE (NON-CAPACITY), & LOCAL RD IMP/MOD (HP1366)
INTERSTATE MAINT. DISCRETIONARY - H.R. 2764
906 906 906 906DEMO - TEA 21 6,192 6,192 6,192 6,192
SBD41339 Total 7,098 7,098 7,098 7,098
SBD41339 San Bernardino SCAB SBD41339 CARH3 10 20.1 22 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 39,500 Agency SAN BERNARDINO COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PEPPER AVE. AT I-10 MODIFICATION OF PEPPER AVE. INTERCHANGE WIDEN BRIDGE FROM 3-7 LANES (2 THRU LANES, 2 TURN LANES SOUTH, 1 TURN LANE NORTH) AND ADD AUXILIARY LANES TO FREEWAY (POST MILES KILOMETERS -32.5-34.4) (T21-#499)
DEMO - TEA 21 651 651 651 651SBD31808 Total 651 651 651 651
SBD31808 San Bernardino SCAB SBD31808 CARH3 10 18.7 20.8 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 40,000 Agency RIALTO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
I-10 AT RIVERISDE AVE - 2.1 KM W/O RIVERSIDE AVE TO 1.3 KM E/O RIVERSIDE AVE. MODIFY IC 4 TO 9 LNS (INCL TURN LNS) FROM SLOVER TO VALLEY & ADD AUX LANES & OPER IMPRV
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 5 of 17
DEMO-SAFETEA-LU 800 800 800 80020061702 Total 800 800 800 800
20061702 San Bernardino MDAB 1C0404 STUDY 18 43.4 17 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4,000,000 Agency HIGH DESERT CORRIDOR JOINT POWERS AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
E-220 HIGH DESERT CORRIDOR-WEST TO EAST SR-14 TO US 395 CONNECTING AT SB COUNTY, . CONSTRUCT NEW 4-6 LANE FACILITY (PART OF 20020144) JPA PROJECT. SR. 138 PM 43.4 TO SR18T 17.0 S.B. COUNTY LINE 0.0.
STP ENHANCE-IIP TEA 1,575 1,575 1,575 1,5750A7910 Total 1,575 1,575 1,575 1,575
0A7910 San Bernardino SCAB 0A7910 NCN46 18 31.4 31.8 S EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,265 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN RUNNING SPRINGS FROM RTE. 18 FROM N/O NOB HILL DR. TO S/O R.S. SCHOOL RD. AND RTE 330 FROM S/O RTE. 18 TO RTE. 18-RURAL GATEWAY BEAUTIFICATION-AESTHETIC IMPROVEMTNS
PUBLIC LAND HWYS 2,000 2,000 2,000 2,00020020144 Total 2,000 2,000 2,000 2,000
20020144 San Bernardino MDAB 20020144 CAX62 18 15 35.9 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,156,000 Agency VICTORVILLE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
HI- DESERT CORR. PHASE 1, SR-18 REALIGNMENT FROM US 395 IN ADELANTO TO SR-18 E/O APPLE VALLEY. COONSTRUCT 4-6 LANE FREEWAY/EXPRESSWAY. CONSTRUCT NEW IC @I-15 W/AUX LANES NORTH AND SOUTH OF NEW IC. CONSTRUCT INTERSECTION @US 395 W/TURN POCKETS TO NORTH AND SOUTH
DEMO-SAFETEA-LU 1,200 1,200 1,200 1,200DEMO - ISTEA 4,823 4,823 4,823 4,823
34170 Total 6,023 6,023 6,023 6,023
34170 San Bernardino MDAB 34170 CAX70 15 38.3 39.4 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 92,000 Agency VICTORVILLE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN VICTORVILLE AT LA MESA ROAD/NISQUALLI ROAD CONSTRUCT I/C
CMAQ 639 639 639 639200078 Total 639 639 639 639
200078 San Bernardino MDAB 200078 TDR64 15 35.6 35.7 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 758 Agency VICTORVILLE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPARK-N-RIDE LOT EXPANSION AND FACILITIES AT BEAR VALLEY RD & I-15 (70 EXISTING SPACES TO 300 SPACES)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 6 of 17
ARRA - HIGHWAY MAINTENANCE (HM)
4,850 4,850 4,850 4,850
SBDLS02 San Bernardino SCAB REG0701 SHP03 999 999 999 S EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 203,211 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LUMP SUM AT VARIOUS LOCATIONS IN SAN BERNARDINO COUNTY , ROADWAY PRESERVATION PROJECTS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)
STP LOCAL 34,850 34,850 34,850 34,850
PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE
33,930 33,930 33,930 33,930DEMO - TEA 21 2,063 2,063 2,063 2,063CMAQ 50,185 50,185 50,185 50,185
ARRA - TRANSPORTATION ENHANCEMENT
1,732 1,732 1,732 1,732
ARRA - SURFACE TRANSPORTATION PROGRAM
49,120 49,120 49,120 49,120
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
77,212 77,212 77,212 77,212
713 Total 249,092 249,092 249,092 249,092
713 San Bernardino SCAB 713 CAX69 215 4.1 10.1 S TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 790,000 Agency VARIOUS AGENCIES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
I-215 CORRIDOR NORTH - IN SAN BERNARDINO, ON I-215 FROM RTE 10 TO RTE 210 - ADD 2 HOV & 2 MIXED FLOW LNS (1 IN EA. DIR.) AND OPERATIONAL IMP INCLUDING AUX LANES AND BRAIDED RAMP
DEMO-SAFETEA-LU 500 500 500 500SBD31850 Total 500 500 500 500
SBD31850 San Bernardino SCAB SBD31850 CAX75 215 1.3 1 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 141,407 Agency SANBAG
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN GRAND TERRACE AT BARTON ROAD INTERCHANGE RECONSTRUCT BARTON RD. I/C WITH MODIFIED PARTIAL CLOVERLEAF CONFG. CONSTRUCT O/C ADD APPROX 1,500' AUX LN AT NB EXIT;CONSTRUCT NEW 1.000' 4 LANE SECTION OF COMMERCE WAY;ADD 2 LANES TO 3200 FT. SECTION OF BARTON RD. CONSTRUCT NEW LOCAL CONNECTOR ST @ NW QUAD OF I/C W 2 LANES ABOUT 1,000 FT.(from Rv. 21545.1 to SBD215 2.7)
STP ENHANCE-IIP TEA 291 291 291 2910F100 Total 291 291 291 291
0F100 San Bernardino SCAB 0F100 NCN46 71 4.8 8.5 S EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,227 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ON RTE. 71 FROM SOQUEL CYN PARKWY TO RIVERSIDE CO. LINE AND RIV. CO FROM S.B. CO LINE TO SANTA ANA RIVER BRIDGE -PHASE 1- TREE PLANTING AND AESTHETICS-
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 7 of 17
ARRA - FTA 5311 428 428 428 42820080804 Total 428 428 428 428
20080804 San Bernardino MDAB REG0702 BUN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 428 Agency BARSTOW CITY/COUNTY TRANSIT
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCAPITALIZATION OF PREVENTATIVE MAINTENANCE
FTA 5311 NON-UZA 253 253 253 25320060606 Total 253 253 253 253
20060606 San Bernardino MDAB 4TL104 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 16,763 Agency BARSTOW CITY/COUNTY TRANSIT
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBARSTOW -OPERATING EXPENSES
CMAQ 1,142 1,142 1,142 1,14220041303 Total 1,142 1,142 1,142 1,142
20041303 San Bernardino MDAB 20041303 BUR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,290 Agency BARSTOW CITY/COUNTY TRANSIT
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM REPLACEMENT 35' GAS FUEL
CMAQ 108 108 108 10820020140 Total 108 108 108 108
20020140 San Bernardino MDAB 4TL204 PAR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 663 Agency BARSTOW CITY/COUNTY TRANSIT
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPARATRANSIT - VEHICLES 17 PASSENGER REPLACEMENT - ALT. FUEL; 05-01 - REPLACEMENT YEAR 2005-FY 2001 VEHICLE
ARRA - SHOPP 9,034 9,034 9,034 9,034SBDLS07 Total 9,034 9,034 9,034 9,034
SBDLS07 San Bernardino SCAB REG0702 CAR60 999 999 999 S EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 61,141 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LUMP SUM AT VARIOUS LOCATIONS IN SAN BERNARDINO COUNTY, BRIDGE PRESERVATION PROJECTS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127, 128, EXEMPT TABLES 2 & 3)
SBDLS02 Total 4,850 4,850 4,850 4,850
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 8 of 17
FTA 5311 NON-UZA 126 126 126 126SBD31037 Total 126 126 126 126
SBD31037 San Bernardino MDAB SBD31037 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 11,291 Agency MORONGO BASIN TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM - OPERATING ASSISTANCE
ARRA - FTA 5311 300 300 300 30020081601 Total 300 300 300 300
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPRUCHASE 2 30' GAS BUSES
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
20081601 San Bernardino MDAB 4TL104 T EXEMPT - 93.126 0PTC 300 Agency MORONGO BASIN TRANSIT AUTHORITY
ARRA - FTA 5311 500 500 500 50020080902 Total 500 500 500 500
20080902 San Bernardino MDAB 4TL104 NCR28 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 500 Agency MORONGO BASIN TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total29 PALMS TRANSIT CENTER
ARRA - FTA 5311 193 193 193 19320080805 Total 193 193 193 193
20080805 San Bernardino MDAB REG0702 BUN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 193 Agency MORONGO BASIN TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCAPITALIZATION OF PREVENTATIVE MAINTENANCE
CMAQ 327 327 327 32720040812 Total 327 327 327 327
20040812 San Bernardino MDAB REG0702 BUR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 376 Agency MORONGO BASIN TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalVEHICLE REPLACEMENT - 28 PASSENGER DEVIATED FIXED ROUTE; 07-2
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 9 of 17
FTA 5311 NON-UZA 94 94 94 94SBD41055 Total 94 94 94 94
SBD41055 San Bernardino SCAB SBD41055 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 9,595 Agency MOUNTAIN AREA REGIONAL TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM - OPERATING ASSISTANCE
ARRA - FTA 5311 300 300 300 30020081602 Total 300 300 300 300
20081602 San Bernardino SCAB 4TL104 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 300 Agency MOUNTAIN AREA REGIONAL TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPRUCHASE 1 BUS FOR BIG BEAR TO SAN BERNARDINO ROUTE
ARRA - FTA 5311 187 187 187 18720081103 Total 187 187 187 187
20081103 San Bernardino SCAB REG0702 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 278 Agency MOUNTAIN AREA REGIONAL TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalREHAB./REPAIR/RETROFIT TRANSIT FACILITIES
ARRA - FTA 5311 180 180 180 18020080806 Total 180 180 180 180
20080806 San Bernardino SCAB REG0702 BUN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 180 Agency MOUNTAIN AREA REGIONAL TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCAPITALIZATION OF PREVENTATIVE MAINTENANCE
CMAQ 224 224 224 224200423 Total 224 224 224 224
200423 San Bernardino SCAB 200423 PAR16 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,198 Agency MOUNTAIN AREA REGIONAL TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPARATRANSIT VEHICLES - REPLACEMENT - GAS/DIESEL; 04-3;05-2;06-4;08-3,09-3
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 10 of 17
FTA 5310 ELD AND DISABI 111 111 111 11120080203 Total 111 111 111 111
20080203 San Bernardino SCAB 4TL204 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 125 Agency OLDTIMERS FOUNDATION
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalOLDTIMERS FOUNDATION - PURCHASE 1 TYPE II AND 1 TYPE III VEHICLES (16 PASSENGER) FOR ELDERLY AND HANDICAPPED-5310 PROGRAM
FTA 5311 NON-UZA 32 32 32 32SBD31612 Total 32 32 32 32
PTC 2,252 Agency NEEDLESSBD31612 San Bernardino MDAB SBD31612 BUO00 T EXEMPT - 93.126 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM - OPERATING ASSISTANCE
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
FTA 5309(c) BUS 435 435 435 435R589TA Total 435 435 435 435
R589TA San Bernardino MDAB R589TA TRRH6 T NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 8,090 Agency NEEDLES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalINTERSTATE - LOS ANGELES/CHICAGO AT EL GARCES STATION MULTIMODAL - STATION - FACILITY
ARRA - FTA 5311 53 53 53 5320080807 Total 53 53 53 53
20080807 San Bernardino MDAB REG0704 BUO01 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 53 Agency NEEDLES
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCAPITAL COST OF CONTRACTING
ARRA - FTA 5311 75 75 75 75SBD41064 Total 75 75 75 75
SBD41064 San Bernardino SCAB SBD41064 TRRH6 T EXEMPT - 93.127 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 158 Agency MOUNTAIN AREA REGIONAL TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM - BUS SHELTERS ON VARIOUS ROUTES-REPLACING MISSING AND/OR DAMAGED BUS STOPS, PURCHASE AND REPAIR SHELTERS, BENCHES, ETC.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 11 of 17
FTA 5307 UZA FORMULAR 715 715 715 71520040211 Total 715 715 715 715
20040211 San Bernardino SCAB 20040211 PAR16 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 5,447 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalREPLACEMENT PARATRANSIT VEHICLES REPLACING PARATRANSIT VEHICLES ON OMNITRANS ACCESS FLEET;08-50;2011-50
FTA 5307 UZA FORMULAR 1,050 1,050 1,050 1,0502002172 Total 1,050 1,050 1,050 1,050
2002172 San Bernardino SCAB REG0702 ADN55 T NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 5,144 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalMID VALLEY FACILITY - NEW MAINTENANCE & ADMINISTRATION FACILITY LOCATED IN RANCHO CUCAMONGA (ETIWANDA & ARROW)
FTA 5307 UZA FORMULAR 596 596 596 59620020806 Total 596 596 596 596
20020806 San Bernardino SCAB 4TL104 NCR86 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,507 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTRANSIT - FACILITIES - IMPROVEMENT/UPKEEP OF EXISTING FACILITIES
ARRA - FTA 5307 1,500 1,500 1,500 1,50020020805 Total 1,500 1,500 1,500 1,500
20020805 San Bernardino SCAB 4TL104 NCN27 T EXEMPT - 93.127 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4,083 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM - PASSENGER FACILITIES - CONSTRUCTION OF THE YUCAIPA TRANSCENTER
ARRA - FTA 5307 2,800 2,800 2,800 2,800FTA 5307 UZA FORMULAR 60 60 60 60
200088 Total 2,860 2,860 2,860 2,860
200088 San Bernardino SCAB 200088 BUN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,972 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTRANSIT SERVICE EQUIPMENT - PURCHASE MAINTENANCE EQUIPMENT FOR EAST AND WEST VALLEY FACILITIES.
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 12 of 17
FTA 5316 JOB ACCESS PROGRAM
2,476 2,476 2,476 2,476
20061701 Total 2,476 2,476 2,476 2,476
20061701 San Bernardino SCAB 999 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,094 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalMOBILITY MANAGEMENT-FTA SECTION 5316 JOB ACCESS REVERSE COMMUTE (JARC) VARIOUS PROJECTS (c/o project from prior year)
FTA 5307 UZA FORMULAR 50 50 50 5020060603 Total 50 50 50 50
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPASSENGER FACILITIES - STOPS AND ZONES - SAN BERNARDINO VALLEY -PURCHASE EQUIPMENT FOR STOP AND ZONE IMPROVEMENTS
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
20060603 San Bernardino SCAB 4TL104 BUN07 T EXEMPT - 93.126 0PTC 154 Agency OMNITRANS
FTA 5309(a) GUIDEWY 108 108 108 10820060602 Total 108 108 108 108
20060602 San Bernardino SCAB 4PD04 NCR28 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 414 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSANTA FE DEPOT IMPROVEMENTS IN SAN BERNARDINO-1170 W. 3RD ST.
FTA 5307 UZA FORMULAR 528 528 528 52820060601 Total 528 528 528 528
20060601 San Bernardino SCAB 4OM0701 TRN06 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 3,000 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCAPITALIZATION OF LEASES - FOR CONTRACTORS, RADIO SITES, APC, TIRE LEASES
FTA 5307 UZA FORMULAR 64 64 64 6420040829 Total 64 64 64 64
20040829 San Bernardino SCAB 20040829 FUL52 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 477 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalFUELING FACILITIES - TO SERVE OMNITRANS SERVICE AREA - REHABILITATION AND MAINTENANCE OF ALTERNATIVE FUELING FACILITIES
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 13 of 17
FTA 5309(c) BUS 217 217 217 217981118 Total 217 217 217 217
981118 San Bernardino SCAB 981118 TRNH6 T TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,244 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM - PASSENGER FACILITIES: DESIGN AND BUILDING OF ONTARIO TRANSCENTER
FTA 5307 UZA FORMULAR 143 143 143 143981114 Total 143 143 143 143
PTC 725 Agency OMNITRANS981114 San Bernardino SCAB 981114 SEC53 T EXEMPT - 93.126 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTRANSIT - SECURITY CAPITALIZATION OF SECURITY COSTS
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
FTA 5307 UZA FORMULAR 140 140 140 140981111 Total 140 140 140 140
981111 San Bernardino SCAB 981111 TRRH6 T EXEMPT - 93.127 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 721 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTRANSIT - ENHANCEMENTS: 1% TRANSIT ENHANCEMENTS TO INCREASE ACCESSIBILITY TO BUS STOPS
FTA 5307 UZA FORMULAR 267 267 267 26720080206 Total 267 267 267 267
20080206 San Bernardino SCAB 4TL104 BUN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,527 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCHINO TRANSIT CENTER PHASE II - PHASE II WILL CONSIST OF BUILDING ADDITIONAL BUS BAYS FOR FUTURE INTER-COUNTY ROUTES
FTA 5317 NEW FREEDOM PROGRAM
977 977 977 977
20061901 Total 977 977 977 977
20061901 San Bernardino SCAB 999 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,227 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalMOBILITY MANAGEMENT - 5317 NEW FREEDOM PROGRAM (PROJECT CARRY-OVER FROM 2006 RTIP)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 14 of 17
FTA 5310 ELD AND DISABI 177 177 177 17720080208 Total 177 177 177 177
20080208 San Bernardino SCAB 4TL204 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 200 Agency OPARC
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalOPARC - PURCHASE 4 TYPE VANS - 8 PASSENGER FOR ELDERLY AND HANDICAPPED PROGRAM - 5310 PROGRAM
FTA 5310 ELD AND DISABI 58 58 58 5820080205 Total 58 58 58 58
20080205 San Bernardino SCAB 4TL204 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 66 Agency ONTARIO YMCA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalONTARIO YMCA - PURCHASE 2 TYPE III BUSES - 16 PASSENGER FOR ELDERLY AND HANDICAPPED - 5310 PROGRAM
FTA 5307 UZA FORMULAR 34 34 34 34SBD31084 Total 34 34 34 34
SBD31084 San Bernardino SCAB SBD31084 BUN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 774 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM-SERVICE VEHICLES, PURCHASE SEVERAL EXPANSION SERVICE VEHICLES
ARRA - FTA 5307 6,776 6,776 6,776 6,776FTA 5307 UZA FORMULAR 5,299 5,299 5,299 5,299
SBD31055 Total 12,075 12,075 12,075 12,075
SBD31055 San Bernardino SCAB SBD31055 TRN06 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 20,623 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTRANSIT ADMINISTRATION EQUIPMENT PURCHASE COMPUTER HARDWARE & SOFTWARE FOR MIS
ARRA - FTA 5307 9,632 9,632 9,632 9,632FTA 5307 UZA FORMULAR 7,930 7,930 7,930 7,930
981122 Total 17,562 17,562 17,562 17,562
981122 San Bernardino SCAB 981122 BUN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 36,933 Agency OMNITRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCAPITALIZATION OF PREVENTIVE MAINT
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 15 of 17
FTA 5307 UZA FORMULAR 26 26 26 26200086 Total 26 26 26 26
200086 San Bernardino MDAB 200086 NCR10 T EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 300 Agency VICTOR VALLEY TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM - PASSENGER FACILITIES. PURCHASE BUS STOP SIGNS AND SHELTERS PROVIDING ADA ACCESSIBILITY
ARRA - FTA 5307 2,188 2,188 2,188 2,188FTA 5309(a) GUIDEWY 3,662 3,662 3,662 3,662
990602 Total 5,850 5,850 5,850 5,850
990602 San Bernardino SCAB 990602 TRR14 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 18,308 Agency SANBAG
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalMETROLINK CAPITAL MAINTENANCE
ARRA - FTA 5307 836 836 836 83620080803 Total 836 836 836 836
20080803 San Bernardino SCAB 4TL104 COO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 6,600 Agency SANBAG
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
METROLINK - CMF AND KELLER STREET YARD - JOINT PROJECT FUNDED BY LAMTA, OCTA, RCTC, & VCTC (SANBAG ONLY PROGRAMMING THEIR PORTION OF PROJECT)
ARRA - FTA 5309 583 583 583 583ARRA - FTA 5307 3,727 3,727 3,727 3,727
20080802 Total 4,310 4,310 4,310 4,310
20080802 San Bernardino SCAB 4TL104 CON07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 34,000 Agency SANBAG
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
METROLINK POSITIVE TRAIN CONTROL - SYSTEM WIDE. IMPLEMENTATION OF PTC, JOINT PROJECT FUNDED BY LACMT, OCTA, RCTC, & VCTC (SANBAG PROGRAMMING ONLY THEIR PORTION OF THE PROJECT)
CMAQ 6,608 6,608 6,608 6,60820020802 Total 6,608 6,608 6,608 6,608
20020802 San Bernardino SCAB 1O0705 TDR64 T TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 11,064 Agency SAN BERNARDINO, CITY OF
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
METROLINK ADD'L PARKING STRUCTURE - CONSTRUCT 5 LEVEL PARKING STRUCTURE TO SERVE EXISTING METROLINK STATION AT SANTA FE DEPOT LOCATION
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 16 of 17
FTA 5311 NON-UZA 216 216 216 216SBD31581 Total 216 216 216 216
SBD31581 San Bernardino MDAB SBD31581 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 90,000 Agency VICTOR VALLEY TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM - OPERATING ASSISTANCE
FTA 5307-OPERATING 8 8 8 8981104 Total 8 8 8 8
981104 San Bernardino MDAB 981104 SEC54 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,000 Agency VICTOR VALLEY TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTRANSIT - SECURITY
FTA 5316 JOB ACCESS PROGRAM
132 132 132 132
20061704 Total 132 132 132 132
20061704 San Bernardino MDAB REG0701 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,500 Agency VICTOR VALLEY TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FTA5316 JOBS ACCESS REVERSE COMMUTE (JARC) VARIOUS PROJECTS TO INCREASE TRANSPORTATION ACCESS TO JOBS FOR LOW INCOME INDIVIDUALS, INCLUDING VOUCHER PROGRAMS AND VANPOOLS (PRIOR RTIP CARRYOVER 2007 DOLLARS)
FTA 5317 NEW FREEDOM PROGRAM
56 56 56 56
20061703 Total 56 56 56 56
20061703 San Bernardino MDAB REG0701 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 665 Agency VICTOR VALLEY TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
NEW FREEDOM - 5317 - VARIOUS PROJECTS AND TRANSPORTATION SERVICES BEYOND THOSE REQUIRED BY ADA, INCLUDING VOUCHER PROGRAMS-COORDINATED MOBILITY PROGRAM FOR VICTOR VALLEY (CARRYOVER FROM PRIOR FTIP 2007 DOLLARS)
ARRA - FTA 5307 1,500 1,500 1,500 1,500FTA 5307-OPERATING 900 900 900 900
200427 Total 2,400 2,400 2,400 2,400
200427 San Bernardino MDAB 200427 BUO01 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 7,214 Agency VICTOR VALLEY TRANSIT AUTHORITY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCAPITAL COST OF CONTRACTING FOR OPERATIONS
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:48:30 AM Page: 17 of 17
CMAQ 871 871 871 871SBD41114 Total 871 871 871 871
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,509 Agency VICTOR VALLEY TRANSIT AUTHORITY
PARATRANSIT - VEHICLE REPLACEMENT ALT. FUEL, 04-3, 07-5, 09-6
SBD41114 San Bernardino MDAB SBD41114 PAR17 T EXEMPT - 93.126 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ARRA - FTA 5311 204 204 204 204SBD41084 Total 204 204 204 204
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS SYSTEM - BUSES REPLACEMENT - ALT FUEL, 2008/09-2
PTC 5,830 Agency VICTOR VALLEY TRANSIT AUTHORITY
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
SBD41084 San Bernardino MDAB 4TL104 BUR17 T EXEMPT - 93.126 0
ARRA - FTA 5311 160 160 160 160ARRA - FTA 5307 1,913 1,913 1,913 1,913FTA 5307 UZA FORMULAR 1,680 1,680 1,680 1,680
SBD41073 Total 3,753 3,753 3,753 3,753
PTC 17,509 Agency VICTOR VALLEY TRANSIT AUTHORITYSBD41073 San Bernardino MDAB SBD41073 ADN55 T EXEMPT - 93.126 0
CAPITAL - PURCHASE OF LAND AND ARCHITECTURAL SERVICES & CONSTRUCT FOR ADMINISTRATIVE, MAINTENANCE, & OPERATIONS FACILITY (PH I & II)
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
Grand Total 35,790 6,023 344,588 386,401 386,401 386,401
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds San Bernardino County $ In Thousands
2011
Print Date: 12/23/2009 11:47:36 AM Page: 1 of 12
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
400 400 400 400
VEN090102 Total 400 400 400 400
VEN090102 Ventura SCCAB REG0703 NCNH2 L EXEMPT - 93.128 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 500 Agency SAN BUENAVENTURA
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalNEW SIGNAL AT KIMBALL ROAD AND FOOTHILL ROAD
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
740 740 740 740
VEN090101 Total 740 740 740 740
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTRAFFIC SIGNAL IMPROVEMENTS AT VARIOUS LOCATIONS
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
VEN090101 Ventura SCCAB REG0703 NCNH2 L EXEMPT - 93.128 0PTC 740 Agency OXNARD
CMAQ 65 65 65 65VEN051401 Total 65 65 65 65
VEN051401 Ventura SCCAB VEN051401 NCN26 L TCM 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,395 Agency FILLMORE
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalROUTE 126 AND SANTA PAULA BRANCH RAILROAD AT POLE CREEK - CLASS I BIKE PATH UNDERCROSSING 0.2 MILES IN LENGTH
CMAQ 164 164 164 164VEN050403 Total 164 164 164 164
VEN050403 Ventura SCCAB VEN050403 NCN26 L TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,500 Agency CAMARILLO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
CALLEGUAS BIKE PATH - CONSTRUCT CLASS I BIKE PATH FOR 0.7 MILES FROM ADOLFO ROAD TO THE ROUTE 101 FREEWAY, WITH CONNECTION TO NEW TRAIL AT VILLAGE AT THE PARK (PHASE II)
STP LOCAL - REGIONAL 40 106 146 146 146CMAQ 26 71 97 97 97
VEN040502 Total 66 177 243 243 243
VEN040502 Ventura SCCAB VEN040502 CAXT2 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,838 Agency CAMARILLO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSANTA ROSA ROAD FROM UPLAND ROAD TO WOODCREEK ROAD WIDEN FROM TWO TO FOUR LANES AND ADD BIKE LANES
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Ventura County $ In Thousands
2011
Print Date: 12/23/2009 11:47:36 AM Page: 2 of 12
DEMO-SAFETEA-LU 1,920 1,920 1,920 1,920VEN051004 Total 1,920 1,920 1,920 1,920
VEN051004 Ventura SCCAB VEN051004 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 6,000 Agency VENTURA COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalRECONSTRUCT AND DEEP LIFT ASPHALT ON VARIOUS ROADS IN VENTURA COUNTY WITHIN CONGRESSIONAL DISTRICT 24
CMAQ 134 134 134 134
ARRA - TRANSPORTATION ENHANCEMENT
1,071 1,071 1,071 1,071
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
230 230 230 230
VEN054605 Total 1,435 1,435 1,435 1,435
PTC 1,601 Agency THOUSAND OAKSVEN054605 Ventura SCCAB VEN054605 NCN26 L TCM Committed 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCONEJO CREEK PARK BIKE PATH - CLASS I BIKE PATH FOR 1.4 MILES IN CONEJO CREEK PARK FROM ROUTE 23 TO JANSS ROAD AND PAIGE LANE
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
STP LOCAL - REGIONAL 300 300 300 300VEN031212 Total 300 300 300 300
VEN031212 Ventura SCCAB VEN031212 ITS02 L TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 450 Agency THOUSAND OAKS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalEXPAND TRAFFIC SIGNAL COORDINATION SYSTEM
CMAQ 1,328 1,328 1,328 1,328VEN051201 Total 1,328 1,328 1,328 1,328
VEN051201 Ventura SCCAB VEN051201 NCN26 L TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,621 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalWEST LOS ANGELES AVENUE FROM WEST CITY LIMIT TO EASY STREET CLASS II BIKE LANES
STP LOCAL - REGIONAL 733 733 733 733DEMO-SAFETEA-LU 400 1,280 1,680 1,680 1,680
VEN051002 Total 400 2,013 2,413 2,413 2,413
VEN051002 Ventura SCCAB VEN051002 CAR63 L NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,984 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalOLSON ROAD WIDENING FROM FOUR TO SIX LANES FROM PRESIDENTIAL DRIVE TO SIMI VALLEY CITY LIMIT, 2700 FEET
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Ventura County $ In Thousands
2011
Print Date: 12/23/2009 11:47:36 AM Page: 3 of 12
CMAQ 1,042 1,042 1,042 1,042VEN93017 Total 1,042 1,042 1,042 1,042
PTC 4,160 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN93017 Ventura SCCAB VEN93017 TDM24 L TCM Committed 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
REGIONAL RIDESHARE PROGRAM - LUMP SUM, INCL RIDESHARING PROGRAM FOR 08/09, 09/10, 10/11, 11/12, 12/13 - INCLUDES VENTURA COUNTY BIKE MAP UPDATE
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
14,816 14,816 14,816 14,816
VEN54032 Total 14,816 14,816 14,816 14,816
VEN54032 Ventura SCCAB VEN54032 NCR31 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 46,887 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
GROUPED PROJECTS - REHABILITATION & RECONSTRUCTION PROJECTS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)
STP LOCAL - REGIONAL 4,294 4,294 4,294 4,294VEN040501 Total 4,294 4,294 4,294 4,294
VEN040501 Ventura SCCAB VEN040501 CAXT2 L TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 54,595 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
NEAR CAMARILLO LEWIS RD WIDEN FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL IMPROVEMENTS - CON PHASE (PE & ROW IN 07-VEN54122) - INCL FINANCE COST
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
699 699 699 699
VEN090103 Total 699 699 699 699
VEN090103 Ventura SCCAB REG0703 NCR36 L EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 699 Agency VENTURA COUNTY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBRIDGE DECK REHABILITATION - VARIOUS LOCATIONS (PROJECTS THAT ARE CONSISTENT WITH 40 CFR PART 93, 126, 127, 128, EXEMPT TABLES 2 & 3)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Ventura County $ In Thousands
2011
Print Date: 12/23/2009 11:47:36 AM Page: 4 of 12
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
6,507 6,507 6,507 6,507
VEN071106 Total 6,507 6,507 6,507 6,507
VEN071106 Ventura SCCAB VEN071166 CAX63 118 27.3 32.6 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 29,717 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN SIM VLY WIDEN RTE 118 WB LA CONTY LN TO TAPO CYN FR 3 TO 4 LANES (TAPO CYN TO KUEHNER) AND FR 4 TO 5 LANES (KUEHNER TO COUNTY LN); WIDEN EB TAPO CYN TO TAPO FR 3 TO 4 LANES; WIDEN EB KUEHNER TO LA CNTY LINE FR 4 TO 5 LAN
STP LOCAL - REGIONAL 354 354 354 354SURFACE TRANS PROG 490 490 490 490DEMO - TEA 21 179 2,623 8,122 10,924 10,924 10,924DEMO-SAFETEA-LU 616 5,140 5,756 5,756 5,756
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
5,000 5,000 5,000 5,000
343 Total 179 3,593 18,752 22,524 22,524 22,524
343 Ventura SCCAB 343 NCRH3 101 20.1 20.1 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 83,977 Agency OXNARD
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalIN OXNARD AT RICE AVE (SANTA CLARA) RECONSTRUCT INTERCHANGE (T21-#664) (SAFETEA-LU #1565) (SAFETEA-LU #2639 AND 'TIP')
STP LOCAL - REGIONAL 550 550 550 550VEN056406 Total 550 550 550 550
VEN056406 Ventura SCCAB VEN056406 CARH3 101 7.9 7.9 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 12,647 Agency THOUSAND OAKS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS INCLUDING WENDY DRIV BRIDGE WIDENING ACROSS ROUTE 101; NB AND SB RAMP IMPROVEMENTS; INTERSECTION IMPROVEMENTS; SIGNAL MOD
TRANS AND COMM AND SYS PRESRV PILOT PROG
428 428 428 428
ARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM
6,520 6,520 6,520 6,520
VEN011205 Total 6,948 6,948 6,948 6,948
VEN011205 Ventura SCCAB VEN011205 NCN37 101 .16 4 S NON-EXEMPT 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 61,330 Agency THOUSAND OAKS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
IN THOUSAND OAKS - IMPRVTS FROM 101/23 IC TO MOORPARK ROAD: EXTEND AUX LANES L.A. CNTY LINE / HAMPSHIRE, NEW NB LANE HAMPSHIRE/23; MEDIAN IMPR; SOUNDWALL (EA 19521, 19522)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Ventura County $ In Thousands
2011
Print Date: 12/23/2009 11:47:36 AM Page: 5 of 12
FTA 5307 UZA FORMULAR 80 80 80 80VEN081005 Total 80 80 80 80
VEN081005 Ventura SCCAB 5TL0703 BUR04 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 100 Agency CAMARILLO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPURCHASE ONE (1) REPLACEMENT DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE
FTA 5307 UZA FORMULAR 80 80 80 80VEN081004 Total 80 80 80 80
VEN081004 Ventura SCCAB 5TL0703 BUN93 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 100 Agency CAMARILLO
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPURCHASE ONE (1) EXPANSION DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE
FTA 5310 ELD AND DISABI 75 75 75 75VEN090202 Total 75 75 75 75
VEN090202 Ventura SCCAB REG0702 PAR04 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 84 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTWO (2) REPLACEMENT MINIVANS FOR ARC VENTURA COUNTY
ARRA - SHOPP 2,953 2,953 2,953 2,953VENLS03 Total 2,953 2,953 2,953 2,953
VENLS03 Ventura SCCAB REG0701 SHP01 999 .01 S EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 16,521 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LUMP SUM AT VARIOUS LOCATIONS IN VENTURA COUNTY, BRIDGE PRESERVATION PROJECTS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)
ARRA - HIGHWAY MAINTENANCE (HM)
1,628 1,628 1,628 1,628
VENLS02 Total 1,628 1,628 1,628 1,628
VENLS02 Ventura SCCAB REG0701 SHP03 999 .01 S EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 44,297 Agency CALTRANS
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
LUMP SUM AT VARIOUS LOCATIONS IN VENTURA COUNTY, ROADWAY PRESERVATION PROJECTS (PROJECTS CONSISTENT W/40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Ventura County $ In Thousands
2011
Print Date: 12/23/2009 11:47:36 AM Page: 6 of 12
ARRA - FTA 5307 600 600 600 600VEN090108 Total 600 600 600 600
VEN090108 Ventura SCCAB REG0702 TRN08 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 600 Agency GOLD COAST TRANSIT
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalFAREBOX SYSTEM UPGRADE
ARRA - FTA 5307 3,608 3,608 3,608 3,608VEN090107 Total 3,608 3,608 3,608 3,608
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
EIGHT (8) CNG-FUELED 25-FOOT TO 40-FOOT BUSES FOR EXPANSION. BUSES WILL BE USED ON ALL GOLD COAST LINES TO REDUCE SPARE RATIO AND INCREASE FREQUENCY WHERE WARRANTED BY DEMAND.
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
VEN090107 Ventura SCCAB 5TL04 BUN94 T TCM Committed 0PTC 3,608 Agency GOLD COAST TRANSIT
ARRA - FTA 5307 185 185 185 185VEN090106 Total 185 185 185 185
VEN090106 Ventura SCCAB REG0702 VEN03 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 185 Agency GOLD COAST TRANSIT
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalFOUR (4) TRANSIT SUPERVISORY VEHICLES AND RELATED EQUIPMENT FOR REPLACEMENT
FTA 5307 UZA FORMULAR 624 624 624 624VEN057413 Total 624 624 624 624
VEN057413 Ventura SCCAB VEN057413 BUN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,050 Agency GOLD COAST TRANSIT
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCNG FUELING SYSTEM UPGRADE
FTA 5307 UZA FORMULAR 64 64 64 64VEN051204 Total 64 64 64 64
VEN051204 Ventura SCCAB VEN051204 BUR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 318 Agency GOLD COAST TRANSIT
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPURCHASE ONE REPLACEMENT BUS
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Ventura County $ In Thousands
2011
Print Date: 12/23/2009 11:47:36 AM Page: 7 of 12
FTA 5311 NON-UZA 705 705 705 705
VEN34253 Ventura SCCAB VEN34253 BUO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 4,884 Agency OJAI
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalOPERATING ASSISTANCE - FIXED ROUTE & PARATRANSIT
ARRA - FTA 5311 466 466 466 466VEN090116 Total 466 466 466 466
VEN090116 Ventura SCCAB REG0702 BUR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 466 Agency OJAI
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTHREE FIXED-ROUTE BUSES FOR REPLACEMENT - OJAI TROLLEY
ARRA - FTA 5307 1,260 1,260 1,260 1,260VEN090104 Total 1,260 1,260 1,260 1,260
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalPurchase 3 replacement buses.
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
VEN090104 Ventura SCCAB RRC0702 BUR17 T EXEMPT - 93.126 0PTC 1,260 Agency MOORPARK
FTA 5307 UZA FORMULAR 90 90 90 90VEN081003 Total 90 90 90 90
VEN081003 Ventura SCCAB REG0702 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 112 Agency MOORPARK
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalONE (1) FIXED-ROUTE BUS FOR REPLACEMENT
FTA 5309(c) BUS 475 475 475 475VEN090501 Total 475 475 475 475
VEN090501 Ventura SCCAB 5TL0706 NCN86 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 50,000 Agency GOLD COAST TRANSIT
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalCONSTRUCT NEW TRANSIT MAINTENANCE AND OPERATIONS FACILITY (EARMARK NUMBER E2009-BUS091)
CMAQ 866 866 866 866VEN090201 Total 866 866 866 866
VEN090201 Ventura SCCAB 5TDL04 SHP01 T TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 866 Agency GOLD COAST TRANSIT
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalMARKET/VALENTINE INDUSTRIAL PARK SHUTTLE SERVICE ON MARKET STREET, VALENTINE ROAD, AND TELEPHONE ROAD
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Ventura County $ In Thousands
2011
Print Date: 12/23/2009 11:47:36 AM Page: 8 of 12
FTA 5307 UZA FORMULAR 16 16 16 16VEN031249 Total 16 16 16 16
VEN031249 Ventura SCCAB VEN031249 TRRH6 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 20 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalREPLACE BUS STOP SIGNS
FTA 5307-OPERATING 8 8 8 8VEN031247 Total 8 8 8 8
VEN031247 Ventura SCCAB VEN031247 TRN06 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 10 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalFOUR (4) REPLACEMENT COMPUTERS
CMAQ 288 288 288 288VEN031246 Total 288 288 288 288
VEN031246 Ventura SCCAB VEN031246 TRN08 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 288 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalGFI FAREBOX REPLACEMENT
CMAQ 302 302 302 302VEN031202 Total 302 302 302 302
VEN031202 Ventura SCCAB 5TL04 BUO00 T TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 975 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalSIMI VALLEY TRANSIT EXPANSION TO SERVE NEW MALL - DEMONSTRATION PROJECT
FTA 5307 UZA FORMULAR 69 69 69 69VEN020901 Total 69 69 69 69
VEN020901 Ventura SCCAB VEN020901 BUN07 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 253 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalFUEL TANK REMEDIATION - MTBE PROJECT
VEN34253 Total 705 705 705 705
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Ventura County $ In Thousands
2011
Print Date: 12/23/2009 11:47:36 AM Page: 9 of 12
FTA 5307 UZA FORMULAR 13 13 13 13VEN061014 Total 13 13 13 13
VEN061014 Ventura SCCAB VEN061014 BUR05 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 15 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalREPLACE DRIVER SEATS IN SIX CNG ADA/DAR VANS
CMAQ 139 139 139 139VEN060202 Total 139 139 139 139
VEN060202 Ventura SCCAB REG0702 TRN09 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 469 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalBUS TRANSIT RADIO SYSTEM
CMAQ 202 202 202 202VEN055409 Total 202 202 202 202
VEN055409 Ventura SCCAB VEN055409 PAR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 302 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTHREE REPLACEMENT PARATRANSIT VANS
CMAQ 195 195 195 195VEN055406 Total 195 195 195 195
VEN055406 Ventura SCCAB REG0702 PAR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 523 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalFIVE REPLACEMENT PARATRANSIT VANS
FTA 5307 UZA FORMULAR 73 73 73 73CMAQ 174 1,787 1,961 1,961 1,961
VEN055401 Total 174 1,860 2,034 2,034 2,034
VEN055401 Ventura SCCAB VEN055401 NCR86 T TCM Committed 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,206 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalEXPAND TRANSIT MAINTENANCE FACILITY TO ACCOMMODATE SYSTEM EXPANSION
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Ventura County $ In Thousands
2011
Print Date: 12/23/2009 11:47:36 AM Page: 10 of 12
ARRA - FTA 5307 152 152 152 152VEN981107 Total 152 152 152 152
VEN981107 Ventura SCCAB VEN981107 PAO00 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 2,547 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalADA SERVICE - PARATRANSIT CAPITAL
ARRA - FTA 5307 303 303 303 303VEN34206 Total 303 303 303 303
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalOPERATING ASSISTANCE - FIXED ROUTE
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
VEN34206 Ventura SCCAB VEN34206 BUO00 T EXEMPT - 93.126 0PTC 7,361 Agency SIMI VALLEY
ARRA - FTA 5307 1,380 1,380 1,380 1,380VEN090114 Total 1,380 1,380 1,380 1,380
VEN090114 Ventura SCCAB REG0702 BUR17 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 1,380 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalTHREE (3) FIXED-ROUTE CNG BUSES FOR REPLACEMENT
ARRA - FTA 5307 564 564 564 564VEN090111 Total 564 564 564 564
VEN090111 Ventura SCCAB REG0702 NCR86 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 564 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalMODERNIZE, UPGRADE, AND REHABILITATE SIMI VALLEY TRANSIT OPERATIONS CENTER AND GARAGE
ARRA - FTA 5307 484 484 484 484VEN090110 Total 484 484 484 484
VEN090110 Ventura SCCAB RRC0702 TRRH6 T EXEMPT - 93.126 0ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
PTC 484 Agency SIMI VALLEY
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalREPLACE/UPGRADE TRANSIT SHELTERS AND ADD NEW SHELTERS
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Ventura County $ In Thousands
2011
Print Date: 12/23/2009 11:47:36 AM Page: 11 of 12
ARRA - FTA 5307 259 259 259 259VEN090115 Total 259 259 259 259
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
FIVE REPLACEMENT PARATRANSIT VEHICLES FOR CAMARILLO HEALTH CARE DISTRICT
VEN090115 Ventura SCCAB REG0702 PAR16 T EXEMPT - 93.126 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
PTC 259 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)
ARRA - FTA 5307 425 425 425 425VEN090105 Total 425 425 425 425
VEN090105 Ventura SCCAB REG0702 PAR17 T EXEMPT - 93.126 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 TotalFIVE LARGE 12 PASSENGER CUTAWAY VEHICLES FOR PARATRANSIT FOR REPLACEMENT
PTC 425 Agency THOUSAND OAKS
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
FTA 5307 UZA FORMULAR 175 124 299 299 299VEN081002 Total 175 124 299 299 299
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
VEN081002 Ventura SCCAB 5TL0706 NCR86 T EXEMPT - 93.126 0
TRANSIT OPERATIONS FACILITY EXPANSION FOR THOUSAND OAKS TRANSIT
PTC 1,000 Agency THOUSAND OAKS
ARRA - FTA 5307 960 960 960 960VEN091118 Total 960 960 960 960
PTC 960 Agency SOUTHERN CALIF REGIONAL RAIL AUTHORITY
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
VEN091118 Ventura SCCAB 5TL0706 NCR86 T EXEMPT - 93.126 0
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
CENTRAL MAINTENANCE FACILITY IMPROVEMENTS AND KELLER STREET YARD - VENTURA COUNTY SHARE OF PROJECT FUNDED BY FIVE COUNTIES INCLUDING L.A., ORANGE, RIVERSIDE AND SAN BERNARDINO.
ARRA - FTA 5307 2,480 2,480 2,480 2,480VEN090117 Total 2,480 2,480 2,480 2,480
PTC 2,480 Agency SOUTHERN CALIF REGIONAL RAIL AUTHORITY
VEN090117 Ventura SCCAB REG0702 TRN09 T EXEMPT - 93.126 0
POSITIVE TRAIN CONTROL SYSTEM - VENTURA COUNTY FUNDING SHARE OF FIVE-COUNTY PROJECT ALSO IN L.A., ORANGE, RIVERSIDE AND SAN BERNARDINO COUNTIES
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Ventura County $ In Thousands
2011
Print Date: 12/23/2009 11:47:36 AM Page: 12 of 12
ARRA - FTA 5307 141 141 141 141VEN090502 Total 141 141 141 141
Fund ENG R/W CON Total 2008/2009 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total
TRANSIT ENHANCEMENTS SUCH AS BUS STOP IMPROVEMENTS AND BICYCLE RACKS ON BUSES (PROJECTS ARE CONSISTENT WITH 40 CFR 93.126,127,128, EXEMPT TABLES 2 & 3)
ProjectID County Air Basin RTP ID Program Route Begin End System Conformity Category Amend
VEN090502 Ventura SCCAB 5TL0707 LUM04 T EXEMPT - 93.126 0PTC 141 Agency VENTURA COUNTY TRANS COMMISSION
(VCTC)
Grand Total 11,676 3,770 75,414 90,860 90,860 90,860
FY 2008-2009 Annual Lisiting of Obligated Projects Federal Funds Ventura County $ In Thousands