- Why we did it Library IT Division Cobbled Together Created
piecemeal over 15+ years Technology dumping ground ILS + Desktop
Support + Grant Projects + Webs + System Administration + Anything
Involving a Computer Mixed Staffing Situation Regular Staff +
Faculty + Contract Staff + Undergrad Students + Grad Students
Capacity questions Project costs, capacity, impact unknown &
unmeasured Few staff + lots of projects = prioritization crisis
10/03/20102Emory University
- Slide 3
- Back Then... 10/03/2010 A Multitude of Projects HodgePodge
Group A Variety of Staff & Skills If its computing, it belongs
in IT!.......No Capacity Planning.......
- Slide 4
- What was needed Comprehensive Operational Vision Professional
Staffing Plan Capacity and Cost Measurements Performance Metrics In
other words: A Business Model 10/03/20104Emory University
- Slide 5
- Comprehensive Operational Vision Clear mission statement why
were in business who we serve Defined tech stack primary tools for
doing our job skill levels expected University-IT role vs.
Library-IT role Service redundancy = wasted money Focus on
appropriate market share Utilize economies of scale 10/03/2010Emory
University5
- Slide 6
- Professional Staffing Plan Classic, industry-based model
Technical Project Managers Software Developers System
Administrators Sustainable project staffing Post-grant maintenance
& updates Common tech stack Professional development &
mentoring Junior, intermediate, senior levels of expertise
Code/Project/System Reviews for coaching Training materials,
conferences, info-forums 10/03/2010Emory University6
- Slide 7
- Capacity and Cost Measurements How long to get X done? Will it
be on time (% probability)? How many people to get X delivered?
What is complexity level of project X? How soon can we start on new
project Z? 10/03/2010Emory University7
- Slide 8
- Performance Metrics Measure Planned Effort Time:
Planning/Development/Deployment Cost:
Planning/Development/Deployment Support Costs (software, security
patches, e.g.) Measure Actual Times/Costs & Compare Refine the
Estimating Process Play It Again, Sam Keep Track of Grant &
Matching Funding Dont exceed matching unnecessarily Track accuracy
of plan against real expenses incurred 10/03/2010Emory
University8
- Slide 9
- PlanExecute Measure Rinse & Repeat* How we do it
10/03/20109Emory University *Continuous improvement!
- Slide 10
- Plan List Product Requirements Divide Into Tasks Estimate Time
to Complete Each Task Estimate Resource Needs Organize Tasks Into
Iterations 10/03/201010Emory University
- Slide 11
- Execute Start End Task 1 Start End Task 2 Start End Task 3
10/03/201011Emory University Begin: Iteration #1 End: Iteration
#1
- Slide 12
- Measure Estimate Velocity Adjust for incomplete tasks Add in
any unforeseen tasking Calculate time per staff member per task Add
up hours on all tasks 10/03/201012Emory University
- Slide 13
- Rinse & Repeat Compare Actual vs. Planned Adjust Next
Iteration Task Plans 10/03/201013Emory University
- Slide 14
- Timeline: 2 Years & Counting Practice Planning Begin
Metrics Collection Organize Teams Planning Tools Measurement Tools
Refine Tools Project Process Estimation Methods Refine Process
10/03/201014Emory University 8 months12 months20 months
- Slide 15
- Light-Weight Tools For Agile Teams Project Planning Tools
Web-Based Proposal Form Dashboard Process Tools Scrums (Cork Board
+ Index Cards) Iteration Planning Meetings Web-Enabled Process
Management Task Tracking Tools TRAC (http://trac.edgewall.org/
)http://trac.edgewall.org/ Time-Tracking Tools ActiTime
(http://www.actitime.com/ )http://www.actitime.com/ Measurement
Tools dWrangler Velocity Estimating Evaluation Tools RAP Sheets
Iteration Reports 10/03/2010Emory University15 Home-Grown &
Open-Source Note: Screenshots on next slides for reference during
live tools demo
- Slide 16
- Project Planning Tools (1) 10/03/2010Emory University16 All
projects require a proposal Simple Fast (mostly)
- Slide 17
- Project Planning Tools (2) Web-Based Consistent Quick Status
10/03/2010Emory University17
- Slide 18
- Project Planning Tools (3) 10/03/2010Emory University18
Dashboard tracks all projects and status phase
- Slide 19
- Process Tools (1) Several tools involved Coordination via
Dashboard: 10/03/2010Emory University19
- Slide 20
- Process Tools (2) 10/03/2010Emory University20 Yes, it is
analog on purpose
- Slide 21
- Process Tools (3) Web-Enabled Process Management
10/03/2010Emory University21 Everyone contributes
- Slide 22
- Task-Tracking Tools (1) Staff use TRAC to manage tasks Note
wiki comment option SVN data noted, too This is a single task
ticket Change history clarifies Attachments optional
10/03/2010Emory University22
- Slide 23
- Task-Tracking Tools (2) Project-oriented view of tasks Note
break-down of User Stories into individual tasks Also note
Milestone headline 10/03/2010Emory University23
- Slide 24
- Task-Tracking Tools (3) Timeline for a project one of many
views 10/03/2010Emory University24
- Slide 25
- Task-Tracking Tools (4) 10/03/2010Emory University25 And there
is the usual SVN repository
- Slide 26
- Time-Tracking Tools (1) Staff enter project time daily (well,
they try) 10/03/2010Emory University26
- Slide 27
- Time-Tracking Tools (2) Example Report: Total time for each of
our projects 10/03/2010Emory University27
- Slide 28
- Time-Tracking Tools (3) Custom reports available
10/03/2010Emory University28
- Slide 29
- Measurement Tools (1) TRAC & ActiTime hooked into our
metric tools dWrangler is a home-grown product built with Django
10/03/2010Emory University29
- Slide 30
- Measurement Tools (2) 10/03/2010Emory University30 Velocity
estimates enable capacity planning Points Open tracked for each
project Points Completed tracked for each project Velocity = Points
Completed Per Iteration
- Slide 31
- Evaluation Tools (1) 10/03/2010Emory University31 Monthly RAP
Sheets (Report on Resources, Activities, Plans) BRIEF summary of
project Discussion points for managers
- Slide 32
- Evaluation Tools (2) 10/03/2010Emory University32 Iteration
Meetings & In-Meeting Report Written while in the meeting Focus
on continuous improvement
- Slide 33
- Lessons Learned One step at a time Organize the teams Conduct
trial-runs for ~ 3 months Set a go live date Training, training,
training All members need to understand the Process No blame, just
gain: incremental improvements Requires (mostly) disciplined
behavior by all team members Measure, predict, measure again Refine
the estimates with actual performance data Teams improve; measure
again 10/03/201033Emory University
- Slide 34
- Agile Manifesto (http://agilemanifesto.org/
)http://agilemanifesto.org/ We are uncovering better ways of
developing software by doing it and helping others do it. Through
this work we have come to value: Individuals and interactions over
processes and tools Working software over comprehensive
documentation Customer collaboration over contract negotiation
Responding to change over following a plan That is, while there is
value in the items on the right, we value the items on the left
more. 10/03/2010Emory University34
- Slide 35
- From Cobbled To Agile Agile is a journey, not a destination
Still refining our tools, teams, processes Some projects need more
planning than usual for Agile projects Too frequent changes can
affect hard deadlines User stories dont work for System
Administration tasks Some projects are more about configuration and
deployment than software development Agile doesnt work for all
projects, all roles, across all teams Underlying concepts are sound
for estimating team capacity Keep what works, refine/replace/remove
what does not 10/03/201035Emory University -ish
- Slide 36
- Questions? Feedback and Comments are welcome Thanks for
attending Contact me: joan.smith@emory.edu 10/03/201036Emory
University
- Slide 37
- Links for Screenshots https://digital.library.emory.edu/
https://heisenberg.library.emory.edu/dwrangler/tracback/digital-masters/
https://heisenberg.library.emory.edu/dwrangler/
https://techknowhow.library.emory.edu/announcements/iteration-report-13-sept-24-sept-2010
https://techknowhow.library.emory.edu/announcements/planning-meeting-iteration-11-oct-22-oct-2010
https://heisenberg.library.emory.edu/dwrangler/tracback/projects/worksummary/
https://larson.library.emory.edu/trac/digitalmasters/timeline
https://larson.library.emory.edu/trac/digitalmasters/roadmap
https://larson.library.emory.edu/trac/digitalmasters/ticket/133
https://heisenberg.library.emory.edu/dwrangler/tracback/digital-masters/collection-editing/
https://techknowhow.library.emory.edu/
http://bohr.library.emory.edu:7080/actitime/login.do
10/03/2010Emory University37