Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
1
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
2
Foreword
The intent of this standing operating procedure (SOP) is
designed and compiled for the purpose to give a guideline to persons
serving under this Prestigious Company to fight any accidental fire.
Accidental fire does not give any warning. A factory under
production is consuming lots of power every day and every moment.
Proper maintenance and proactive and regular checking of vital core
of the electric layout will reduce the chance of accidental fire, but do
not assure 100% that there will not be any accidental fire.
Therefore an early preparation to fight any accidental fire and
rehearsal once / twice in a month ( for max of 30 mins) will give
persons a morale strength to fight any accidental fire including
knowing and marrying up of required tasks to be done by the various
party heads. This will generate general awareness amongst all and
reduce substantial damages once things appear. A fire alarm with
nominating the party heads and knowing their task is very much
important in any of the running factory. Setup of a control room in
case of emergency with required T&T number and various agencies
Tel/Cell numbers must be displayed in the control room.
In this booklet an endeavor is taken to provide all information
needed for the company to collect collate information and required
papers for claiming their insurances as ensured by Policy coverage
by our mercantile insurance company ltd. Compile and created with
the noble hope that this booklet will bring some result in the event of
any emergency. It will also be used as ready references.
Col Md Mozammel Hossain, LPR General Manager, Planning and Development
National Polymer Industries Ltd
PD LEED Certification Project
Shoeniverse Footwear Ltd ,Hobirbari- Bhaluka
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
3
Things To Do
1. Time of incident._________________ date with
exact time___________
2. Correct Address for asking help.
Call for FB with noting the time and pers name to be
registered. (Caller name must be noted).
3. Call for Police with noting the time and duty officers
name.
4. Setup a duty room –Security gate is appropriate
having Tel facility and Address displayed.
5. Duty room must have required emergency number
like Fire brigade / PS (Local with cell no of officer in
charge for quick communication.
6. Inform required personnel immediately via call /text
message.
7. All Must assemble at incident place.
8. Route in to incident location must be cleared inside
and (outside Route leading to factory from main road).
9.Clear off onlookers / gate blockers / unwanted
persons entry.
10. First person’s name who has identified
fire______________________________.
11. Time of entry FB / Police: FB In time
___________Police in time___________.
12. Out time of FB / Police: FB out time __________
Police Out time___________.
13. Locate and assess causes of incident and total
approx loss.
A.Factory estb date.
B.Factory registration date for insurance.
C.Name of the insurance company.
d.Policy number and ensure premium is paid in
regular basis.
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
4
E.Liability covered and asks for surveyor to
survey the incident and provide report.
F.GD entry in the local PS.
G.TR required money to govt bank for getting
fire report from concern agencies.
H.Detail of Mercantile Insurance and premium
coverage. As annexure.
j.Get Fire report signed from DG FB if damage
exceeds more than 2 crore. Less will be signed
by Director FB.
k.Fire alarm system should immediately be
incorporated and 3 layer of person should be
made responsible for various level of
responsibilities, like:
1).Firefighting Group – Headed by :
Name:____________
2).Fire rescue Team – Headed by :
Name:______________
3).Fire salvage Team- Headed by: Name:
______________________________
4).Gate Control and Security –Headed by:
Name:_________________________
5).Control Room Persons – Headed by:
Name:_______________________etc.
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
5
Index
S/N
CONTENT PAGE NO
Remarks
1 Foreword 2
2 Thing to do 3-4
3 Index 5-6
4 Tel / Cell no of various Agencies &
Departments
7
5 Fire Fighting Parties and their
Responsibilities.
08-25 Details of Fire
parties leaders
and their total
responsibilities,
For plant at
Tongi, Gazipur
6 Emergency Response Diagram 26
7 Emergency Exit Diagram 27
8 First Aid 28-31
9 Specimen GD 32 GD Same day if
possible
10 Fire Equipment’s and Tools 33-34
11 Social compliance hardware and
medicine
35-38
12 Overview of Tongi Factory and fire trg
Session 26 Oct 2015 39-43
13 DG Fire Brigade - Application 44
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
6
14 Specimen Bank Chalan for Fire Report
45
15 Specimen – Surveyor Report 46-48 Surveyor should be immediately notify for coverage
16 Surveyor tel / Cell no 49
Insurance Mercantile Insurance Company
50-63 May be a day after
FPO -075 51
FPO -108 53
FPO -101 55
FPO -100 57
FPO -119 59
FPO – 102 61
FPO - 081 62
FPO - 082 63
Miscellaneous
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
7
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
8
AwMœ wbe©vcK `‡ji cÖwk¶b
ZvwiLt 26 কটোবর ২০১৫
welqt AwMœ wbe©vcK cÖwk¶b|
AskMÖn‡bt AwMœ wbe©vcK `‡ji m`m¨ e„›`|
cÖwk¶‡bi ¯’vbt টংগি চেরোিঅলী,এন,পলী ফযোটরী
mgqt ১১০০-১২৩০
e¨e¯’vcbvqt পলযোগনং ও চেকেলোপকেনট ও Kgc¬v‡qÝ wefvM|
1| f~wgKvt িোরকেনটস ও cv yKv wkí evsjv‡`‡ki GKwU Abb¨ ißvwbgyLx
cÖwZôvb| ¸bMZ gv‡bi Rb¨ mvivwe‡k¦ Gi h‡_ó mybvg i‡q‡Q| িোরকেনটস ও
cv yKv wkí †_‡K G‡`‡ki cÖPzi •e‡`wkK gy`ªv AwR©Z n‡q _v‡K| wkí KviLvbvq
GKwU we‡kl `yN©Ubv j¶¨ Kiv hvq †mwU n‡jv AwMœKvÛ| hvi d‡j cÖwZ eQi
nvRvi nvRvi †KvwU UvKvi m¤ú` fw¯§f~Z n‡”Q|
AviI aŸsm n‡”Q A‡bK K‡ó Mov, KvwiMwi wk¶vq wkw¶Z gvbe m¤ú`| hv
†`‡ki RvZxq A_©bxwZ‡Z wei ~c cÖfve †dj‡Q| ïay ZvB bq, GB AwMœKv‡Ûi d‡j
wkí KviLvbvq PvKzixiZ Kgx©‡`i ¯^Rb Z_v †`‡ki mvaviY Rb‡Mvwôi g‡a¨
AvZs‡Ki m„wó n‡q‡Q| Kv‡RB AwMœKvÛ I `yN©Ubv cÖwZ‡iva I Gi cÖwZKvi GKvšÍ
Ri~ix|
2| D‡Ïk¨t িোরকেনটস ও cv yKv wk‡í AwMœKvÛ ev `yN©Ubv cÖwZ‡iva Ges
cÖwZKv‡ii Kibxq m¤ú‡K© mg¨K avibv †`qv|
3| Av¸‡bi cÖKvi‡f` t cÖ_‡gB Rvb‡Z n‡e Av¸‡bi aib/ cÖKvi‡f` Ges
Gi cÖwZKvi wK wK|
AwMœKvÛ‡K Avgiv wb¤èwjwLZ Pvi fv‡M fvM Ki‡Z cvwi t
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
9
K) mvaviY Av¸b (Ordinary Fire): ¯^vfvweK fv‡e †h
AwMœKv‡Ûi m„wó nq †hgbt w`qvkjvB †_‡K m„ó AwMœ KvÛ, cwZZ wewo,
wmMv‡iU †_‡K AwMœKvÛ, BZ¨vw` fv‡e m„ó Av¸b‡K Avgiv mvavib
AvMyb ej‡Z cvwi|
L) Zij Av¸b (Liquid Fire): Zij c`v_©- †hgb †c‡Uªvj,
AK‡Ub Ges wewfbœ ai‡bi Zij †KwgK¨vj †_‡K m„ó Av¸b‡K Zij
Av¸b (Liquid Fire)ejv †h‡Z cv‡i|
M) M¨vmxq Av¸b (Gaseous Fire) : M¨vm †_‡K (†hgbt
M¨v‡mi Pzjv, M¨vm cvBc, BZ¨vw`) m„ó Av¸b‡K M¨vmxq Av¸b ejv nq|
N) ‰e`¨ywZK Av¸b (Electrical) : we`¨yr cÖevn †_‡K m„ó
Av¸b‡K •e`¨ywZK (Electrical) Av¸b ejv nq| †hgbt kU© mvwK©U
†_‡K m„ó Av¸b Ges wewfbœ wkí KviLvbvq msNwUZ AwMœKv‡Ûi Kvib
wnmv‡e •e`¨ywZK Av¸b‡KB `vqx Kiv nq|
4| wkí KviLvbvq AwMœKvÛ ev yN©Ubvi Kvib mg~n t
K) •e`¨ywZK kU© mvwK©U,Î~wUc~b© ‣e`¨ywZK ¯’vcbv I Ace¨envi |
L) we`y¨‡Zi Ifvi‡jvW|
M) ‡h †Kvb ai‡bi we‡õviK ev †KwgK¨vj †_‡K AwMœKvÛ ev yN©Ubv
NU‡Z cv‡i|
N) I‡qwìs Gi AmZK© e¨envi|
O) mgqgZ i¶bv‡e¶b I †givgZ bv Kivi Kvi‡b †gwk‡b AZ¨vwaK
Zvc m„wó|
P) AvBib msi¶‡b AmveabZv|
Q) KviLvbvi Af¨š ͇i Amveav‡b M¨v‡mi Pzjv e¨envi I ivbœv-evbœv
Kiv|
R) eqjvi AZ¨vwaK DËß nIqv|
S) wewo, wmMv‡i‡Ui Av¸b †_‡K AwMœKvÛ n‡Z cv‡i|
T) w`qvkjvB, wmMv‡i‡Ui jvBUvi †_‡K AwMœKvÛ n‡Z cv‡i|
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
10
U) ‣e`¨ywZK Zvi Ges ¯’vcbv¸‡jv‡Z Szj gqjv wbqwgZ cwi®‹vi bv
Kivq mU© mvwK©U †_‡K AwMœKvÛ n‡Z cv‡i|
V) kÎ~Zv g~jK, D‡Ïk¨ g~jK ev cvMjvwgi Kvi‡bI AwMœKvÛ n‡Z
cv‡i|
5| AwMœ wbe©vcb gva¨g t †h‡nZz Av¸b `vn¨e¯‘, GUv Zvc I Aw·‡R‡bi
g‡a¨ Awew”Qbœ ivmvqwbK wewµqvi dj, †m‡nZz GB wZbwU Dcv`v‡bi g‡a¨ hv‡Z
Awew”Qbœ ms‡hvM bv n‡Z cv‡i ev ms‡hvM n‡jI hw` Zv wew”Qbœ K‡i †`qv hvq
Zvn‡j Av¸b R¡j‡e bv ev Av¸b jvM‡jI wb‡f hv‡e|G Kv‡Ri Rb¨ `vn¨ e¯‘
Abymv‡i cvwb ev wewfbœ AwMœ wbe©vcK hš¿ AwMœ wbe©vc‡bi gva¨g wnmv‡e e¨envi
Kiv nq|
K) cvwbi gva¨‡g t KwVb c`v‡_©i Av¸b †hgbt Kvci, Zzjv,
KvMR, KvV BZ¨vw`‡Z Av¸b ai‡j Zv wbe©vc‡bi Rb¨ cvwb fwZ© Wªvg
†_‡K †QvU evjwZi gva¨‡g cvwb wb‡¶c K‡i Ges †nvR ixj e¨envi
K‡i †QvU Av¸b wbe©vcb Kiv hvq|
mveavbZv t we`¨y‡Zi Av¸‡b †Kvb µ‡gB cvwb e¨envi Kiv hv‡e bv
L) AwMœ wbe©vcK h‡š¿i gva¨‡g t Avgv‡`i †`‡k K‡qK ai‡bi
AwMœ wbe©vcK hš¿ cvIqv hvq Zb¥‡a¨ cv yKv wkí KviLvbvq cÖavbZ `yB
ai‡bi AwMœ wbe©vcK hš¿ e¨envi Kiv nq|
1| Kve©b-WvB-A·vBW/wmIUz (CO2) t mvavibZt we`¨ y‡Zi
Av¸b wbe©vcb Kivi Rb¨ A_©vr Av¸b we`¨y‡Zi g‡a¨ mxgve×
_vK‡j G h‡š¿i mvnvh¨ Av¸b wbe©vcb Kiv hvq|
2| WªvB †KwgK¨vj cvIWvi (wWwmwc) t KwVb, Zij I evqexq
†h †Kvb c`v‡_©i Av¸b wbev©c‡bi Rb¨ G hš¿ e¨envi Kiv
hvq| DCP ‡K †Kv¤úvbx †f‡` ABC ev ABC & E cvIWvi I ejv nq|
M) Ab¨vb¨ miÄvgv`x t K¤^j, dvqvi weUvi, dvqvi ûK BZ¨vw`
AwMœ wbe©vcK miÄvgv`x AwMœ wbe©vc‡b e¨envi Kiv nq |
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
11
6| AwMœ wbe©vcK hš¿ e¨envi c×wZ t
K) n¨v½vi ev †`qvj †_‡K AwMœ wbe©vcK hš¿wU wb‡P bvgv‡Z n‡e|
L) AwMœ wbe©vcK h‡š¿i gy‡Li †mdwU wcbwU Lyj‡Z n‡e|
M) Wvb nvZ w`‡q nvZj a‡i hš¿wU Zz‡j evg nvZ w`‡q †nvRwU
Av¸‡bi w`‡K ZvK Ki‡Z n‡e| (Aek¨B Av¸b †_‡K wbivc` yi‡Z¡
_vK‡Z n‡e)|
N) Wvb nvZ w`‡q h‡š¿i wjfviwvU Pvc w`‡Z n‡e Ges evg nvZ w`‡q
†nvRwU bvovPvov Ki‡Z n‡e|
O) Av¸b wb‡f †M‡j wjfviwU ‡Q‡o w`‡Z n‡e| hw` Av¸b wb‡f bv
wM‡q we¯ Ívi jvf K‡i Zvn‡j `ª ~Z NUbv ¯’j Z¨vM cye©K dvqvi mvwf©m
wefvM‡K Lei w`‡Z n‡e| dvqvi mvwf©m AvMg‡bi ci cÖ‡qvRb‡ev‡a
Zv‡`i †K AwMœ wbe©vc‡b mn‡hvMxZv Ki‡Z n‡e|
গবগেনন পরকোর গিগনরবোপন hনতরঃ
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
12
n
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
13
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
14
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
15
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
16
b¨vkbvj cwjgvi BÛvwóªR wjt
¯‹zBe †ivW, U½x, MvRxcyi|
AwMœ wbe©vcK / D×viKvix /KW©b cvwU© I cÖv_wgK wPwKrmv I dvqvi weª‡MW‡K
Lei †`Iqv BZ¨vw` Kv‡R wb‡qvwRZ cÖwk¶b cÖvß `‡ji bv‡gi ZvwjKv |
AwMœ wbe©vcK ev dvqvi dvBwUs `‡ji `j‡bZv t
µt bs bvg c`ex wefvM gšÍe¨
01 †gvt †gv³vi
†nv‡mb
mnKvix
e¨e¯’vcK
cÖWvKkb †d¬vi 01988-810543
02 ‡gvt gvmyg ivbv wkdU
BwÄwbqvi
‡Wvi cÖ‡R± 01988-810536
03 Avt ev‡iK Ry‡qj wkdU
BbPvR©
GbGdGGj 01722-456952
04 ‡gvt kvgQzj Avjg wmwbtB‡jK
‡Uªwkqvb
‡gBb‡Ub¨vÝ 01988-810532
05 ‡gvt Avãyi ingvb wmwKDwiwU
B݇c±i
wmwKDwiwU 01974-100861
06 ‡gvt byiæj nK wmwKDwiwU
B݇c±i
wmwKDwiwU 01974-100861
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
17
AwMœ wbe©vcK ev dvqvi dvBwUs `‡ji m`m¨ t
µt
bs
bvg c`ex wefvM gšÍe¨
01 ‡gvt ev`j Acv‡iUi cÖWvKkb
02 ‡gvt¯^cb wgqv Acv‡iUi cÖWvKkb
03 ‡gvt dinv` wgqv Acv‡iUi cÖWvKkb
04 wR‡Zb e¨vbvRx© Acv‡iUi cÖWvKkb
05 ‡gvtmvjvDwÏb Acv‡iUi cÖWvKkb
06 ‡gvt gvwbK wgqv Acv‡iUi cÖWvKkb
07 ‡gvK‡jQzi ingvb ‡dvig¨vb ‡gBb‡Ub¨vÝ
08 ‡gvt gvnveyeyi
ingvb
B‡jK‡Uªwkqvb ‡gBb‡Ub¨vÝ
09 ‡gvt kvnxb Avjg Rywbqi Acv‡iUi GbGdGGj
10 wecyj wgqv Rywbqi Acv‡iUi GbGdGGj
11 ‡gvt wUUz nvIjv`vi Rywbqi Acv‡iUi GbGdGGj
12 ‡gvt BwjqvQ
nvIjv`vi
Rywbqi Acv‡iUi GbGdGGj
13 AvwkK cÖavb Rywbqi Acv‡iUi GbGdGGj
14 byi Avjg Acv‡iUi G‡·mwiR
15 mygb wgqv Acv‡iUi G‡·mwiR
16 ‡gvt gweb Bmjvg Acv‡iUi G‡·mwiR
17 ‡gvt mvwgDj Rywbt Acv‡iUi G‡·mwiR
18 †gvt AveŸvm wcÖw›Us Acv‡iUi ‡Wvi
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
18
cÖWvKkb
19 Avt nvB e¨vP †gKvi ‡Wvi
cÖWvKkb
20 kvnv`vr Avjx Rywbqi Acv‡iUi ‡Wvi
cÖWvKkb
21 Avãyj gv‡jK mnKvix Acv‡iUi ‡Wvi
cÖWvKkb
`vwqZ¡v I KZ©e¨ t
1| Av¸b jvMvi mvB‡ib †kvbvi m‡½ m‡½ B‡jKwUªwkqvb/dvqvi dvBwUs `‡ji
`j‡bZv †d¬v‡ii we`¨y‡Zi †gBb myBP eÜ Ki‡e|
2| Av¸b jvMvi mvB‡ib †kvbvi m‡½ m‡½ dvqvi dvBwUs `‡ji cÖ‡Z¨‡K `ª~Z
wbw`©ó AwMœ wbe©vcb h‡š¿i Kv‡Q P‡j hv‡e I hš¿ bvwg‡q †b‡e Ges GKwÎZ
n‡q Av¸b †Kv_vq †j‡M‡Q Zv Rvbvi †Póv ev cieZx© wb‡`©‡ki Rb¨ A‡c¶v
Ki‡e| Z‡e hw` wbR †d¬v‡i Av¸b jv‡M Zvn‡j `ª~Z Av¸‡bi Kv‡Q hv‡e
Ges Av¸‡bi w`‡K ZvK K‡i AwMœ wbe©vcbx hš¿ e¨envi Ki‡e|
3| dvqvi dvBUviiv †K †Kvb AwMœ wbe©vcK hš¿wU e¨envi Ki‡e Zv cz‡e©B
wba©vwiZ _vK‡e|
4| dvqvi dvBUviiv cÖ‡qvR‡b `iRvi mvg‡b iw¶Z Wªv‡gi cvwb Ges †nvm
cvB‡ci mvnv‡h¨ Av¸b †bfv‡Z †Póv Ki‡e|
5| ‰e`¨ywZK Av¸b †bfv‡Z ïaygvÎ Kve©b-WvB-A·vBW e¨envi Ki‡e|
6| dvqvi weª‡MW `j Avm‡j Zv‡`i‡K me©‡Z¡vfv‡e mvnvh¨ Ki‡e|
7| wb‡Ri †d¬v‡i Av¸b bv jvM‡j wc, Gg ev KZ…©c‡¶i cieZx© wb‡`©‡ki
A‡c¶vq _vK‡e|
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
19
D×viKvix `‡ji `vwqZ¡ I KZ©e¨ t
D×viKvix `‡ji `j †bZv I m`m¨‡`i bv‡gi ZvwjKv wb‡¤œ †`Iqv n‡jv|
µt bs bvg c`ex wefvM gšÍe¨
01 ‡gvt †Mvjvg
kvnwiqvi
mnKvix
e¨e¯’vcK
cÖWvKkb
†d¬vi
01988-810544
02 ‡gvt wgRvbyi
ingvb
g¨v‡bR‡g›U
†Uªwbs
cÖWvKkb 01713-738386
03 DËg Kzgvi B‡jKwUªK¨vj
BwÄwbqvi
‡gBi‡Ub¨vÝ 01988-810532
04 ‡gvt Gnmvbyj nK wkdU BbPvR© GbGdGGj 01728-986740
05 ‡gvt ‡mvnvM
Ave`yjøvn
wmwbtwkdU
BwÄwbqvi
G‡·mwiR 01988-810534
06 ‡gvt gRbyi
ingvb
wmwbtwkdU
BwÄwbqvi
G‡·mwiR 01988-810533
D×viKvix `‡ji m`m¨ t
µt bs bvg c`ex wefvM gšÍe¨
01 ¯^cb nvj`vi Rywbqi Acv‡iUi cÖWvKkb
02 ‡gvnvBwgbyj Rywbqi Acv‡iUi cÖWvKkb
03 wjUb ivq Rywbqi Acv‡iUi cÖWvKkb
04 ‡gv¯ÍvwdRyi Rywbqi Acv‡iUi cÖWvKkb
05 ‡gvt ‡mwjg Rywbqi GbGdGGj
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
20
Acv‡iUi
06 †gvt Bgb Rywbqi Acv‡iUi GbGdGGj
07 ‡gvt AvRv`yj Rywbqi Acv‡iUi GbGdGGj
08 ‡gvt kvgxg Rywbqi Acv‡iUi GbGdGGj
09 ‡gvt AvjgMxi Rywbt Acv‡iUi G‡·mwiR
10 ‡gvt eveyj
†nv‡mb
Rywbt Acv‡iUi G‡·mwiR
11 ‡gvt †gv³vi
†nv‡mb
e¨vP †gKvi ‡Wvi
cÖWvKkb
12 myRb gÛj Rywbqi Acv‡iUi ‡Wvi
cÖWvKkb
13 dwi` ¯œvj BDwUwj Acv‡iUi ‡gBi‡Ub¨vÝ
14 Avwidzi ingvb ‡gKvwb· ‡gBi‡Ub¨vÝ
15 ïå P›`ª miKvi ‡gKvwb· ‡gBi‡Ub¨vÝ
`vwqZ¡v I KZ©e¨ t
1| Av¸b jvMvi mvB‡ib †kvbvgvÎ `j‡bZv Zvi ûB‡mj evwR‡q mevi `„wó
AvKl©b Ki‡e|
2| ewn©iMgb `iRv w`‡q BfvKz‡qkb c ¬vb Abyhvqx 1 †_‡K 2 wgwb‡Ui g‡a¨
(hZ`«~Z m¤¢e) `ª~ZZvi m‡½ mevB‡K wbivc` ¯’v‡b †h‡Z mn‡hvMxZv Ki‡e|
cye© †_‡KB †K †Kv_vq `vuwo‡q †jvKRb miv‡bviRb¨ mn‡hvMxZv Ki‡e Zv
wba©vwiZ _vK‡e|
3| ev_iæ‡g ev Ab¨ †Kv_vI †KD AvUKv co‡jv wKbv Zv †`Lvi Rb¨ gwnjv
ev_iæ‡g GKRb gwnjv Ges cyiæl ev_iæ ‡g GKRb cyiæl †PK Ki‡e| (gwnjv
kÖwg‡Ki †ÿ‡Î gwnjv kÖwgK wmdU Abyhvqx wbav©ib Ki‡Z n‡e)
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
21
4| ‡KD AvnZ ev Amy¯’ n‡q co‡j Zv‡K ev Zv‡`i‡K ª ~Z dv÷ GBW wU‡gi
Kv‡Q wb‡q hv‡e Ges KvD‡K Gg AvB iæ‡g †bIqvi cÖ‡qvRb n‡j, ‡óPv‡i K‡i
A_ev Kvu‡a K‡i wb‡q hv‡e|
5| DPy `vjvb ev eûZj wewkô `vjvb ‡_‡K hw` ‡KD fq †c‡q Rvbvjv w`‡q
bvg‡Z †Póv Ki‡j ev jvd w`‡Z PvB‡j Zv‡K †div‡Z n‡e Ges wmuwo w`‡q
bvg‡Z mvnvh¨ Ki‡e|
6| Av¸b †hLv‡b †j‡M‡Q Zvi Pvicvk †_‡K gvjcÎ Ges †gwkb mwi‡q wb‡e|
7| `‡ji mevB `j‡bZvi †bZ„‡Z¡ KvR Ki‡e|
8| wb‡Ri †d¬v‡i Av¸b bv jvM‡j wc, Gg, ev KZ…©c‡¶i cieZx© wb‡ ©‡ki
A‡c¶vq _vK‡e|
dvó GBW `‡ji `vwqZ¡ I KZ©e¨ t
dvó GBW `‡ji `j †bZv I m`m¨‡`i bv‡gi ZvwjKv wb‡¤œ †`Iqv n‡jv|
µt bs bvg c`ex wefvM gšÍe¨
01 ‡gvtkvnwiqvi
cvi‡fR
RywbtAwdmvi cÖkvmb 01718-904499
02 ‡gvt †ejøvj
gÛj
mv‡cvU© óvd cÖkvmb 01923-665593
03 ‡gvt AvwRR wmwKDwiwU MvW© wmwKDwiwU 01754-368776
m`m¨‡`i bv‡gi ZvwjKv |
µt bs bvg c`ex wefvM gšÍe¨
01 ‡gvt gwReyi
ingvb
mv‡cvU© óvd cÖkvmb
02 ‡gvt AvwZKzi
ingvb
mv‡cvU© óvd cÖkvmb
03 ‡gvt gwbiæj
Bmjvg
mv‡cvU© óvd cÖkvmb
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
22
`vwqZ¡v I KZ©e¨ t
1| Av¸b jvMvi mvB‡ib †kvbvgvÎ `ª ~Z dvó GBW e· Gi Kv‡Q Ae¯’vb wb‡e|
2| AvnZ ev Amy ’ †ivMx‡K `ª‚ZZvi mv‡_ cÖv_wgK wPwKrmv Ki‡e|
3| cÖv_wgK wPwKrmvq my¯’ bv nIqvi gZ Ae¯’v n‡j D×viKvix m`m¨‡`i w`‡q
`ª~Z Gg, AvB iæ‡g †cÖib Ki‡e|
4| wb‡Ri †d¬v‡i Av¸b bv jvM‡jI wc,Gg ev KZ…©c‡¶i wb‡ ©k Qvov ¯’vb Z¨vM
Ki‡e bv|
KW©b `‡ji `vwqZ¡ I KZ©e¨ t
KW©b`‡ji `j †bZv I m`m¨‡`i bv‡gi ZvwjKv wb‡¤œ †`Iqv n‡jv|
µt
bs
bvg c`ex wefvM gšÍe¨
01 ‡gvt RvwKi
†nv‡mb
wmwKDwiwU
B݇c±i
wmwKDwiwU 01710-338118
02 ‡gvt Avt
mvjvg
wmwKDwiwU
MvW©
wmwKDwiwU 01921-220921
03 ‡gvt nvq`vi
Avjx
wmwKDwiwU
MvW©
wmwKDwiwU 01775-586574
KW©b `‡ji m`m¨ t
µt bs bvg c`ex wefvM gšÍe¨
01 Avt Qvjvg-2 wmwKDwiwU MvW© wmwKDwiwU
02 ‡Mvjvg
wKewiqv
wmwKDwiwU MvW© wmwKDwiwU
03 ‡Mvjvg †gv¯Ídv wmwKDwiwU MvW© wmwKDwiwU
04 AvkÖvdzj
Bmjvg
wmwKDwiwU MvW© wmwKDwiwU
05 ibwRr Kzgvi wmwKDwiwU MvW© wmwKDwiwU
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
23
06 ‡mvnive
†nv‡mb
wmwKDwiwU MvW© wmwKDwiwU
`vwqZ¡v I KZ©e¨ t
1| Av¸b jvM‡j ev H iKg †Kvb yN©Ubv NU‡j ª ~Z d¨v±ixi g~j dUK mgyn Ly‡j
w`‡e|
2| d¨v±ixi kªwgK - Kg©Pvix‡`i‡K Ges cvK© Kiv Mvox‡K `ª ~Z evwni n‡Z mvnvh¨
Ki‡e|
3| d¨v±ixi wfZ‡i †hb evwn‡ii †jvKRb ev †Kvb Mvox A‣eafv‡e AbycÖ‡ek
Ki‡Z bv cv‡i Zv wbwðZ Ki‡e Ges A‣ea AbycÖ‡e‡ki m¤¢vebv _vK‡j Zv
cÖwZnZ Ki‡e|
4| d¨v±ixi mvg‡bi iv Ív me©`v Db¥y³ ivL‡e †hb cÖ‡qvR‡b dvqvi weª‡MW,
cywj‡ki Mvox I G¨v¤^y‡jÝ ª ~Z PjvPj Ki‡Z cv‡i|
5| Av¸b jvM‡j ev H iKg †Kvb `yN©Ubv NU‡j Avbylvw½K mvnvh¨ mn‡hvMxZv
cÖ`vb Ges KZ…©c‡¶i ‡h †Kvb wb‡ ©k cvj‡bi Rb¨ cÖ¯‘Z _vK‡e|
dvqvi eªx‡MW‡K Lei ‡`Iqvi Rb¨ g‡bvwbZ `j †bZv I m`m¨‡`i bv‡gi
ZvwjKv wb‡¤œ †`Iqv n‡jv|
µt bs bvg c`ex wefvM gšÍe¨
01 ‡gvt nvwdRyi
ingvb
mnKvix e¨e¯’vcK BDwUwjwU 01988-810542
02 ‡gvt Kvgiæj
nvmvb
mnKvix e¨e¯’vcK GbGdGGj 01717-678029
03 iv‡k`
nvmbvZ
wmwbqi Awdmvi cÖkvmb 01919-259760
04 kvgxg
BKevj
wmwbqi Awdmvi cÖkvmb 01973-436156
05 ‡gvt Avãyi wmwKDwiwU wmwKDwiwU 01974-100861
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
24
ingvb B݇c±i
06 ‡gvt byiæj
nK
wmwKDwiwU
B݇c±i
wmwKDwiwU 01710-338118
`‡ji m`m¨ t
µt bs bvg c`ex wefvM gšÍe¨
01 gvneyeyi
ingvb
wmwKDwiwU MvW© wmwKDwiwU
02 Avey e°vi wmwKDwiwU MvW© wmwKDwiwU
03 nvweeyi
ingvb
wmwKDwiwU MvW© wmwKDwiwU
04 wgRvbyi
ingvb
wmwKDwiwU MvW© wmwKDwiwU
05 ‡`‡jvqvi
†nv‡mb
wmwKDwiwU MvW© wmwKDwiwU
`vwqZ¡v I KZ©e¨ t
01| dvqvi eªx‡MW‡K †gvevBj/wUGÛwUi gva¨‡g Riæix Zje Kiv Ges mwVK
w`K wbi‡`©kbv w`‡q NUbv¯’‡j nvwRi Kiv|
02. Zv‡`i mv‡_ †_‡K wewfbœ cÖ‡qvRbxq welqv`xi e¨vcv‡i mn‡hvMxZv Kiv|
03. cvwbi wiRvifvi Gi ¯’vb †`wL‡q †`Iqv|
wewea mgyn t
01. dvqvi Gjvg-wbev©nx cwiPvjK g‡nv`‡qi g‡bvwbZ e¨vw³ |
02. mgv‡eZ GjvKv d¨v±ixi †M‡Ui evwn‡i|
03. ‡jvW-Avb‡jv‡Wi mgq iv¯Ív cwi¯‹vi ivL‡Z n‡e|
04. mKj †cv‡ó wmwKDwiwU MvW© mZ©K Ae¯’vq _vK‡Z n‡e|
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
25
Dcmsnvi t wkí KviLvbvq wb‡qvwRZ cÖ‡Z¨K gvbyl Gi AMœ©x `yN©Ubv m¤ú©‡K
Ávb _vKv AZ¨šÍ Riæix| Zvn‡jB †m wb‡R evP‡e, wk‡ív evP‡e, evP‡e †`k
I RvZx| GLv‡b GUvI Riæix †h cÖwZ wkd‡U cÖ‡qvRbxq cÖwZ ¯Í‡ii `‡ji
†bZv _vKv `iKvi|
Dcw¯’Z kªwgK‡`i bvg, KvW© bs, c`ex I ¯v¶i wb‡¤œ †`qv njt
Prepared By :
Col Md Mozammel Hossain,LPR General Manager,Planning and Development
And PD LEED Certification Project
Shoeniverse Footwear Ltd
µwgK bs bvg KvW© bs c`ex †mKkb ¯^v¶i
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
26
cÖv_wgK wPwKrmv (First Aid) `‡ji cÖwk¶b
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
27
Fire Exit Diagram-NPoly Plant
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
28
ZvwiLt 26 কটোবর ২০১৫
welqt cÖv_wgK wPwKrmv (First Aid)
AskMÖn‡bt AwMœ wbe©vcK `‡ji m`m¨ e„›`|
cÖwk¶‡bi ¯’vbt টংগি চেরোিঅলী,এন,পলী ফযোটরী
mgqt ১১০০-১২৩০
e¨e¯’vcbvqt পলযোগনং ও চেকেলোপকেনট ও Kgc¬v‡qÝ wefvM|
cÖv_wgK wPwKrmv (First Aid)
¯^v¯’¨ wel‡q Ri ~ix Ae¯’vq Zvr¶wYK cÖv_wgK wPwKrmv LyeB ¸i ~Z¡c~Y©, GKvi‡Y
mK‡jiB Zvr¶wYK KiYxq wKQy wel‡q Ávb _vKv LyeB Ri ~ix Ges AZ¨vek¨Kxq
t-
we`y¨ZvwqZ n‡jt
K) we`y¨ZvwqZ n‡j e¨w³‡K gvwU‡Z ïB‡q gv_v GK cv‡k KvZ K‡i
w`b|
L) K¤^j w`‡q Zv‡K †X‡K ivLyb hv‡Z †m Dò _v‡K|
M) hw` †m wccvmv †eva K‡i Z‡e Zvi †VvU †fRv Kvco w`‡q wfwR‡q
w`b|
N) hw` †m AÁvb n‡q hvq Z‡e Zvi k¦vvm-cÖk¦vm j¶¨ Ki~yb |
O) cÖ‡qvR‡b Zv‡K nvmcvZv‡j †bIqvi e¨e¯’v Ki~yb |
Kvc‡o Av¸b ai‡j KiYxq t
K) AwMœ wbe©vcK Øviv Av¸b wbwf‡q †djyb|
L) wXjv Xvjv Kvco n‡j Ly‡j †djyb wKš‘ Z‡e †hme Kvco †cvovi
Dc‡i †j‡M Av‡Q Zv Lyj‡eb bv|
M) cvwbi mvnv‡h¨ †cvov AskwU VvÛv Kiyb, fy‡jI †cvov As‡k Nlv
w`‡eb bv|
N) Zzjv Qvov Ab¨ wKQz w`‡q †cvov AskwU †X‡K ivLyb|
O) wK cwigvY AvNvZ †c‡q‡Q Zv ey‡S Zv‡K nvmcvZv‡j fwZ©i e¨e¯’v
Ki~yb |
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
29
cy‡o †M‡jt
mv‡_ †cvov AskwU VvÛv cvwb‡Z ayB‡q wbb Ges hZ¶Y R¡vjv bv K‡g ZZ¶Y
Av‡¯— Av‡¯— †cvov As‡k cvwb Xvjyb| hw` †dv¯‹v c‡o Z‡e GK UzKiv cwi®‹vi
Kvco (Zzjv bq Ggb) w`‡q RvqMvwU †X‡K ivLyb| †dv¯‹vwU dvUv‡eb bv| †Kvb
cÖKvi µxg ev †jvkvb †cvov RvqMvi Dc‡i jvMv‡eb bv|
†KD AÁvb n‡j Zvr¶wYKfv‡e KiYxq t-
K) Zv‡K GKUv mgZj f~wg‡Z ïB‡q w`b Ges Zvi cv‡k nvUz †M‡o
emyb| Kcv‡j nvZ w`‡q Av‡ Í Av‡ Í gv_vwU‡K KvZ K‡i w`b| Zvi
gyLwU nv K‡i w`b| hw` †m k¦vm wb‡Z bv cv‡i, Z‡e K…wÎg k¦vm-
cÖk¦v‡mi e¨e¯’v Ki~yb |
L) Zvi wPeyK Zz‡j ai yb hv‡Z †Pvqvj mvg‡bi w`‡K hvq Ges gyL Lyjyb
I bv‡K yÕAv½yj w`‡q †P‡c ai ~b|
M) eo GKUv wbtk¦vm wbb Ges Avcbvi †VvU Zvi gy‡L †P‡c ai‚b,
Gici Av‡ Í Av‡¯ Í Zvi gy‡L k¦vm †Q‡o w`b|
N) wbtk¦v‡mi m‡½ Zvi eyK DVv-bvgv Ki‡Q wKbv j¶¨ Kiyb|
O) cÖ‡qvR‡b Zv‡K nvmcvZv‡j †bIqvi e¨e¯’v Ki~yb |
†K‡U †M‡jt
K) †WUj ev †mfjb Øviv RvqMvwU cwi®‹vi K‡i wbb|
L) hw` 5 wgwb‡U i³ cov eÜ bv nq, Z‡e GKwU c¨vW ¶ZwUi Dci
wKQz¶Y Pvc w`‡q ivLyb|
M) †Wªwms K‡i RvqMvwU †eu‡a ivLyb Ges cwi®‹vi ivLyb|
cÖPzi i³¶iYt
K) hw` cÖPzi i³¶iY nq Z‡e †mB AskwU Zz‡j ai ~b Ges Pvicv‡k
Pvc w`b hZ¶Y ch©šÍbv i³ eÜ nq|
L) wKQz¶‡Yi Rb¨ Pvc eÜ Ki ~b Ges i~gvj RvZxq †Kvb Kvco †cwP‡q
w`b|
M) ¶Z As‡ki Pvicv‡k i‚gvjwU †eu‡a wbb Ges GKwU †M‡Ri gva¨‡g
¶ZwU‡K e¨v‡ÛR Ki–b| AvnZ‡K †Zvjvi †Póv Ki‡eb bv Ges
¶ZwU‡K cwi®‹v‡ii †Póv Ki‡eb bv|
N) Zv‡K Wv³v‡ii Kv‡Q wb‡q hvb|
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
30
bv‡K i³ Avm‡jt
K) Zv‡K GKwU †ewm‡bi mvg‡b wgwbU `‡kK bv‡K Pvcv w`‡q ivLyb|
†U‡b i³ wfZ‡i †bqv †_‡K weiZ _vKzb|
L) GiciI hw` i³ eÜ bv nq Z‡e GKwU †fRv Kvco Zvi bv‡K 2
wgwb‡Ui Rb¨ †P‡c ai~b Ges Gici Avevi bv‡K Pvc w`‡q ivLyb|
M) i³ cov eÜ nevi NÈv Pv‡iK ch©š— bvK w`‡q evZvm †ei bv
Ki‡Z ejyb|
gv_v ev gy‡Li ¶Zt
K) hw` gv_v †d‡U hvq Z‡e ¶Z As‡k †fRv Kvco Rwo‡q w`b| GUv
¶ZwU ùxZ nIqv †_‡K i¶v Ki‡e|
L) hw` gv_v †_‡K i³¶iY nq Z‡e GkwU cwi®‹vi Kvco ¶‡Zi Dci
Pvc w`‡q ivLyb|
M) Zv‡K Wv³v‡ii Kv‡Q wb‡q hvb|
wLPzbx ev †ckxi Uvbt
K) †hfv‡e Avivg †eva K‡i †mfv‡e A½wU ivLyb Ges Zv‡Z eid
kxZj cvwb Xvjyb|
L) †ckxi Pvicv‡k Zzjv w`‡q e¨v‡ÛR Ki ~b|
†Pv‡L gqjv co‡jt
K) wKQz¶Y †PvL ey‡R A‡c¶v Ki ~b †`Lyb, ¯vfvweK †Pv‡Li cvwb w`‡q
gqjv ay‡q hvq wKbv|
L) hw` Zv‡Z ay‡q bv hvq Z‡e ch©vß Av‡jv‡Z nvZ w`‡q Av‡¯ Í Av‡ Í
†PvLwU Lyjyb Ges †Pv‡Li mv`v As‡k gqjv _vK‡j GKwU i~gvj w`‡q
gqjvwU †Pv‡Li †Kv‡Y wb‡q Avmyb|
M) hw` GB c×wZ‡Z KvR bv nq Z‡e Wv³v‡ii civgk© wbb|
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
31
Dcw ’Z kªwgK‡`i bvg, KvW© bs, c`ex I ¯v¶i wb‡æ †`qv njt
µwgK
bs bvg KvW© bs c`ex †mKkb ¯v¶i
------------------(†gwWwmb গবেোি)
Compiled and edited By :
Col Md Mozammel Hossain,LPR
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
32
Specimen GD Copy of Local Police Station
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
33
Fire Fighting Equipment’s and Tools
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
34
Collected and compiled By:
Col Md Mozammel Hossain, LPR GM P&D,NPOLY Group and PD LEED-Shoeniverse Footwear Ltd
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
35
Name Of Equipt Item Capa Unit Reqr Rate
Total
01 Fire Extinguisher CO2 5 Kgs
02 ABC dry powder Powd
er ………. ………
03 Fire Extinguisher Foam 9 Kgs
04 Sand And Water Bucke
t 4
Each Floor
05 Water Drum For
Fire Plastic 300 Ltr.
06 Bucket Stand 1.6
07 Gas Mask
08 Helmet
09 Blanket
10 Fire Equipment Box
1 on Each Floor
Box
11 Hand Gloves Fair.BD Pcs
12 Lock Cutter Lock
2 on Each Floor
Pcs
13 Fire Beater
2 on Each Floor
Pcs
14 Fire Hook
2 on Each Floor
Pcs
15 Smoke Detector
Panel Bord
Pcs
16 Fire Alarm
4 On Each
Floor Pcs
17 Fire Alarm Switch
According
To 1.18 Pcs
18 Gong Bell 2 on Each Pcs
Compliance Requirements for Firefighting Equiptments
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
36
Floor
19 Stretcher Pcs
20 Fire Hose Cabinet Pcs
21 Manila Roof
2 on Each
Floor Pcs
22
23
Operating Instruction For
Fire Extinguisher
1 Pcs On Each
Extinguisher Pcs
24 Liquid Soap
2 on Each Bathroom
Pcs
25 Towel
3 on Each Bathroom
Pcs
26 Mat For Toilet
Pcs
27
Sanitary Disposable Basket For Female Toilet
1 on Each Bathroom
Pcs
28
Reserve Water Drum
2 on Each Bathroom
Pcs
29
Plastic Bucket
1/10 Person
According to your dining facility
Pcs
30 Glass For Drinking
Water 1 for 5 person
Pcs
31 Savlon
Pcs
32 Neobacsin Cream
Pcs
33 Burnon Cream
Pcs
34 Hexiol
Pcs
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
37
35 Paracetamol
Pcs
36 Butapin
Pcs
37 Antacid
Pcs
38 Bandage 3 Size Pcs
39 Roller Bandage
Pcs
40 Neostrip
Pcs
41 Twin Kit
Pcs
42 Cotton
Pcs
43 Nebonal Powder
Pcs
44 Hand Gloves
Pcs
45 Nix/Move
Pcs
46 ORS
Pcs
47 Surgical Scissor
Pcs
48 Hot and Cold Bag
Pcs
49 Covered Bucket
Pcs
50 Sterilizer
Pcs
51 Splint 3 Size
52 Blanket
Pcs
53 Artery forceps
Pcs
54 Hand Towel
Pcs
55 Kidney Tray
Pcs
56 Carbolic Sope
Pcs
57 Thermometer
Pcs
58 Torch
Pcs
59 Weight Machine
Pcs
60 Table Cloth
YRD
61 Plate
Pcs
62 Reserve Water Drum
Pcs
63 Floor Mat 14*14 Inch
64 Dolna Pcs
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
38
65 Doll And Toys Pcs
66 Pillow With Cover Pcs
67 Side Pillow Pcs
68 Drinking Watre Facility Pcs
69
70
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
39
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
40
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
41
A.Note: All to know (male /Female) Fire extinguishers handling and
use. Alarm Switch off electric power and call ED Plant/ Designated
per’s over cell- extinguish fire by handheld extinguisher as this is the
only time to suppress the fire 3.5 mins time )
1. All party leaders ( Firefighting/ Fire Salvage / Cordon Party/ First
Aid / Calling FB per’s)
selected
2. 02 leaders/ shift along with 06 workers of each party must remain
in each shift despite holidays /
govt festivities and all.
3. Leave will be planned accordingly.
4. All shift in charge must trained their pers at their own time before
drill to be scheduled 15-20 of
Nov 2015. FB pers along with their fire fighting vehicle will be
arranged to educate all parties
responsible for firefight. Will incur 15-20 thousands taka for
bringing vehicle/ extinguisher
along with pers for drill purpose.
5. Only two types of extinguisher we may use- CO2 and ABCs (All
purposes).
6. Any event of fire SOS calls to ED plant and others essentials pers
with a msg/call.
7. ED Plant will supervise and all party leaders along with their
designated workers will do their
assigned task as given.
8. An alarm scheme must be planned judiciously by ED plant
basing on floor and building
having access to all for fire alarm
9. All to know important tel/cell no of party leaders and imp pers.
10. FB number must be inscribes in RED Big size in each floor in a
very convenient eye sight. Specially Tongi and Gazipur. Admin may
prepare a forma and paste tel/cell no.
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
42
11. Chemicals and machines must have a bare minimum gap to
avoid any accidental fire.
12. Exits of each floor must be arranged floor wise.
13. A sorts of apron for firefighting team max of 30-50 may be
design with NPOLY logo and given to floor in charge to wear to
identify and to educate /inculcate awareness among all.
14. Pers must be responsible to collect FB personnel and vehicle
directing from Gazipur main road. Road clearance is important.
15. A sign posting depicting NPOLY factory location must be hang
showing both side for easy access and convenience of FB persons to
arrive in shortest possible time. Brand Pers may developed and fix it
in the main road depicting diversion to NPOLY factory.
16. Award and punishment for good and bad job may be introduced.
B. You kind decision on few highlighted aspects is solicited please.
Col Md Mozammel Hossain, LPR
GM Planning and Development
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
43
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
44
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
45
Bank Chalan Copy for Fire Report
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
46
Surveyor Report
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
47
Surveyor Report
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
48
Surveyor Report
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
49
Surveyor’s Contact Number
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
50
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
51
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
52
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
53
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
54
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
55
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
56
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
57
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
58
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
59
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
60
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
61
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
62
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
63
Standing Operating Procedure (SOP) – Prevention of accidental fire, fire training, first
aid and ready references for post fire procedure in any factory / installations. (
64