Factory Master a TBIZ2011

Post on 01-Jul-2015

570 views 0 download

Transcript of Factory Master a TBIZ2011

FactoryMaster Ltd

Software for tough businesses

Presented byGraham Scott

graham@factorymaster.co.uk

Contents

• Introduction

• Company background

• Adding business value

• Software functionality

• Innovation

• Service Delivery

• Case Studies

• Conclusion

Introduction

Who are FactoryMaster Ltd?

• Was founded in 1991

• 1992 – first version of pre-Windows FactoryMaster

• 1996 – launch of the first Windows –basedFactoryMaster

• FactoryMaster today - comprehensive cost-effectiveMRP solution

• Manufacturing Industry

Company background

Adding Business Value

• How does FactoryMaster work?– Fits into core of a business – addresses infrastructure

– Production controls and processes

– Automated procedures

– Traceability

Increased Productivity, Reduced Costs....

Overall Increased Profitability!

Software functionality

• Monthly updates (included in price)• Cost effective• Adaptability of the product:

• Integrates with a wide range of accounting solutions• Integrates with Microsoft Reporting Services• Fully integrated in-depth quality system

• Aerospace standards of traceability• Modular• Easy & attractive interface

Innovation

• Research and development• .Net Development – Web portal• Multiple constraints scheduling

• Continuous improvement• Knowledge Transfer Partnerships (KTP)• Apprenticeships• Monthly updates

• Supporting Industry and the Community• Bloodhound SSC• Working with local schools

Service Delivery

• Implementation• Skilled, knowledgeable Project Managers from industry

• Implemented to the needs of the customer

• Play and Live version• Lower training costs

• Regular Training sessions offered• Free training for new users

• Bespoke training offered (on and off site)

Complimentary Products

Case Studies

Subsea Components(Division of Aker Kvaerner)

“Just five months into implementation …and the management acknowledgedthat the improvements broughtdirectly by FactoryMaster havebeen responsible for £600,000 ofadditional turnover.”

Implementation Manager

Paddock Gear

• Precision manufacturers of

gears for naval vessels and

power transmission industry

• 40% growth in turnover in

just two years

• Maintaining control of the

jobs on shop floor

• Quality was being compromised

Mr MarklewManaging Director

“I would estimate that the system has saved meemploying two more people (in planning andproduction control) at £25K per annum each”

“This is an excellent system. It has become second

nature to personnel and is now key to our

infrastructure on traceability and quality”

We hope you enjoyed ourFactoryMaster presentation!