Fabric Inspection Training KDS Final

Post on 23-Oct-2014

151 views 3 download

Tags:

Transcript of Fabric Inspection Training KDS Final

Fabric InspectionP

repared B

y - GM

- Supply C

hain & Q

A

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Inspection Procedure

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Incoming Fabric

Management

Are you using the right tools?

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

UN-LOADING FABRIC

HookDiesel-lift

No! No!

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

WAREHOUSE

What’s Wrong?

Warehouse----Guideline1, clear identification & tidy arrangement

3, do not block the path

4, no direct sun light

5, keep warehouse dry

6, pack fabric rolls well w/o any broken package

2, do not lay fabric rolls directly on the ground

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Before Inspection

Standard

Operating

Procedure

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

PREPARATION

Color Continuity Card

Light Box In the Dark Room

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Material Inspection

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Clean the floor / machine

Inspection

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

----Unpacking

What’s Wrong?

Inspection

X

Prepared By - GM - Supply Chain & QA

Check the ticket & separate by batch(against packing list)

Aware of damaging fabric

Inspection------Unpacking

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

KNOW THE MACHINE

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

KNOW THE MACHINE

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

KNOW THE MACHINE

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

KNOW THE MACHINE

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Mark out the defect (arrow ticket, chalk…)

Record while inspection

Inspection

------Width Check Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Checking on Machine

Inspection

Prepared By - GM - Supply Chain & QA

------LENGTH CHECK

Yard Counter

Inspection

Calculationthrough weight check

Spreading & Measure after relaxation

Inspection

What will you get under tension? Narrowed width & Extended length

------Minimize the tension during inspection

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Inspection

During inspection

Centre to edgesewing selvedge with centre

------Color Evenness Check

Roll to Roll Swatches

Prepared By - GM - Supply Chain & QA

Inspection

Check the batch shade against color standard

Check shade variation between batches within grade 4-5

------Color Continuity Check

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Need to repack the fabric roll w/o any broken package

Inspection

------Re-pack ------ReportCalculation, evaluation

& report

X

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

After Inspection

Prepared By - GM - Supply Chain & QA

QUALIFIED FABRIC

Only release the qualified fabric to production

------No report , No production

No License

No License

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

REJECTED FABRIC

Quarantine Area 质量问题布隔离区

Separate Quarantine Area for Rejected Fabric

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Inspection Method

Part 2

5 WsWho is responsible for fabric inspection?

When to do the fabric inspection?

Where to do the fabric inspection? What to do for fabric inspection?

How to deal with findings?

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Who

Responsibility for fabric inspection

IQC

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

When

Garment Makers must examine the shipment within at latest 2 days of receipt

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

WhereInspection Station

Inspection Equipment

Requirements Inspection Machine

• flat surface/viewing area• undercarriage Light ( back light )

Inspection Speed • Inspector’s ability • Fabrication and Color • Maximum speed ( 25 yards / min )

Inspection Lighting • Overhead Cool Day Light lighting • 100 foot candle / 1075 Lux ( at least 40 W X 4 Light Tubes )

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Where

Proper sufficient ambient lighting

Clean, Neat and Safe

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Flat viewing surfaceUndercarriage Light

Where

Where

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

45 ~ 30 degree Tilted against vertical

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Where

Inspection Speed•Inspector's ability•Fabrication & Color•Maximum speed ( 25 yards/ min )

WhereP

rep

are

d B

y - GM

- Su

pp

ly Ch

ain

& Q

A

Inspection Lighting•Overhead CWF lighting•Minimum 100 foot candle(at least 40 W X 4 light tubes)

Light Meter

WhatP

rep

are

d B

y - GM

- Su

pp

ly Ch

ain

& Q

A

Order NoSupplier,Color NameColor CodeBatch NoRoll NoRemark

How

Support GOOD QUALITY / GOOD PRODUCTION

ALL THE TIME

• Material First Quality

• Material On Time Delivery

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

What

Inspection Sample Size

• 100 % inspection at Fabric suppliers

• Minimum 10% up to 100% inspection at Garment Makers based on the nature of the fabric, experience

with T2 reliability. Inspection Method • Face side ( always inspected )/ Back side • Color ( continuity and evenness ) /Standard Light Box• Measuring Cuttable width ( beginning, middle and end )• Viewing Distance ( 2 ~ 4 feet )

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Prepared By - GM - Supply Chain & QA

What

Prepared By - GM - Supply Chain & QA

< 3 “ (1), 3” ~ 6”(2) ,

6” ~ 9”(3) and > 9”(4)

Marking defects

Measuring Width

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Needle Holes

Cuttable Width

Markingdefects

What

With Stenter pin marks/or gummed edges.

B is the Usable width

A B

With Selvedges trimmed. An allowance is needed on each selvedge of at least 1cm. Therefore the Usable width in this case is D even though there is no stenter mark.

C

D

E E

What

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Linear Yards

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Linear Yards Square Yards

What4 points Inspection System

Defect classification / ASTM D3990-99 Visually inspecting and grading fabric / ASTM D5430-93

< 3 “ , 3” ~ 6” , 6” ~ 9” and > 9” Marking the defect

Within Cuttable Width

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Points per 100 Square Yards

Points per 100 linear yards

24

40

Shipment Acceptability

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

HowEnsuring on-time garment delivery

Resolution of Issues

Complete Fabric

Inspection Report

Prepared By - GM - Supply Chain & QA

IQC I/C along with GM – QA takes the final call on status

If any fabric rejected, Merchandiser take up the matter with

supplier

Pre

pa

red

By - G

M - S

up

ply C

ha

in &

QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Prepared By - GM - Supply Chain & QA

Q & AP

rep

are

d B

y - GM

- Su

pp

ly Ch

ain

& Q

A