ESTS PRESENTATION - LNGSTSConducted the worlds first LNG STS transfer without incident Commissioned...

Post on 09-Jul-2020

0 views 0 download

Transcript of ESTS PRESENTATION - LNGSTSConducted the worlds first LNG STS transfer without incident Commissioned...

ESTS

PRESENTATION

• INTRODUCE LNGSTS and our operations – Who we are.

OBJECTIVES :

• SHARE our past experience as a company – What qualifies our company.

• LESSONS LEARNT – What we have observed.

• BEST PRACTICE - The right way.

• ACTIONS – What people in this room can do.

• CHALLENGES AND THREATS – Further risks posed to vessels during emergency STS.

• WHY SHIP TO SHIP – Advantages of direct cargo transfer.

• OUR SERVICE – How we manage emergency ship to ship operations.

• CONCLUSIONS – Further risks posed to vessels during emergency STS.

OVERVIEW – Have we addressed the above

?

WHAT LNGSTS OFFERS

Emergency Provision

Ship to Ship

Project Consultancy

HISTORY OF LNGSTS

Conducted the worlds first LNG STS transfer

without incident

Commissioned Bahia Blanca Terminal and

provided Terminal Management for the first 3

years of operation.

Technical Support Management for Mina Al-

Ahmadi Gas Port.

340 transfers conducted to date

2005 - 2007

2008 - 2009

2009 - Present

Obtained permission to conduct breakbulk

LNGSTS in Japan. 65 transfers conducted.

Commissioned a major LNG reception facility

and FSRU in Tianjin

STS to Gas Up and Cool Down an LNGC,

saving the client significant port costs

2013

2014

2014

Acted as Technical Consultants and

commissioned Höegh FSRU Lampung

2014

Commenced Operation and Maintenance of

Sheik Sabah Al Ahmad LNG Terminal, Jordan.

Over 140 transfers conducted to date.

Project Support and Terminal Management to the

Bahrain LNG Terminal. Will Commission, Operate

and Maintain going forward

2015 - Present

2016 - Present

Commissioned the worlds first Micro LNG

Terminal in Jamaica.

2016

The drivers of LNG Ship to Ship

• We have conducted over 500 LNG transfers

• Multiple Emergency LNG STS completed

• Break-Bulk operations in Americas & Asia

• Gas-up & Cool-down on route to maximise berth usage

LNG STS

FRSU

Emergency

Gas up / Cooldown

Break-bulk

Emergency Ship to Ship and the Global LNG Fleet

500

and rising…….

Estimate

6%

Prepared

• GUARANTEED Access to a complete set of equipment

ESTS – What we provide :

• PERSONNEL to ensure a safe and efficient transfer

• DISCRETION for all parties

• INTERMEDIATOR between operators, cargo owners and industry bodies

• ACCESS to industry experts, including operators and manufacturers

• EXPERIENCE to know how to handle emergency situations and cargo requirements

Thank you

The LNG STS Team

Gibraltar 2016