Electrolysis Pump House
Valve Leak Sealing
Jul-2004
Hobart Smelter
Cooling Towers
To Cell Room
12
2
1
3
Leak Seal Valves
Cooling Water Pumps
Spray Pumps
De-Aerator Pond
Cooling Pond
Weir
Inlet Screen
Make Up Water
#1 Cooling Water Pump – Delivery Valve
End Result
Tapping Point Installed by OMT – Injected with a Graphite Compound
#1 Spray Pump – Delivery Valve
End Result
Tapping Point Installed by OMT – Injected with a Graphite Compound