PROJECT: PROPOSED TWO STOREY RESIDENTIAL BUILDING LOCATION: PATAG CAGAYAN DE ORO CITYSUBJECT: PROGRESS REPORT FOR OCTOBER 2015 – CURRENT

SCOPE OF ACCOMPLISHMENT ARCHITECTURAL PHASE (OCTOBER 2015 – CURRENT)

1.) CONCRETING OF STAIRS2.) INSTALLATION OF, DOORS, GLASS, WATERPROOFING3.) TILE SETTING, ROOFING WORKS, METAL FURRINGS, HAND RAILS, PIPE FITTINGS.

TOTAL ACCOMPLISHMENT PERCENTAGE AS OF NOVEMBER 6 2015: (75.63% )

PROJECT: PROPOSED TWO STOREY RESIDENTIAL BUILDING LOCATION: PATAG CAGAYAN DE ORO CITYSUBJECT: PROGRESS REPORT FOR OCTOBER 2015 – CURRENT

PIPE FITTINGS AND CONCRETING OF STAIRS

PROJECT: PROPOSED TWO STOREY RESIDENTIAL BUILDING LOCATION: PATAG CAGAYAN DE ORO CITYSUBJECT: PROGRESS REPORT FOR OCTOBER 2015 – CURRENT

RAILINGS AND METAL FURRING INSTALLATION

PROJECT: PROPOSED TWO STOREY RESIDENTIAL BUILDING LOCATION: PATAG CAGAYAN DE ORO CITYSUBJECT: PROGRESS REPORT FOR OCTOBER 2015 – CURRENT

ROOFING AND CEILING CLOSURE

PROJECT: PROPOSED TWO STOREY RESIDENTIAL BUILDING LOCATION: PATAG CAGAYAN DE ORO CITYSUBJECT: PROGRESS REPORT FOR OCTOBER 2015 – CURRENT

PAINTING WORKS (SKIMCOAT)