Post on 19-Aug-2018
DFW Connector Environmental Tablet System
John Gage, AEP, CSEM, LEED AP Environmental Compliance Manager NorthGate Constructors
Connector Environmental Tablet Systems
The SWPPP on the Connector consist of 100 sheets that cover the project footprint X 6 main phases and other sub-phases.
Typical SWPPP Sheet
Typical BMP Installation Log
BMP Inspections
Screen Shot
Screen Shot
Document Control Screen Shot
Field Inspections
• Inspections • Trainings • Document Control • SWPPP
• Field Web Conferences • Remote Desktop
Other Tablet Benefits and Uses